User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:58, 15 May 2014 diff hist 0 N File:Main Page May 15, 2014.jpg current
- 09:58, 15 May 2014 diff hist +226 m Main Page new photo
- 08:21, 15 May 2014 diff hist 0 N File:236.3.3.3B May 2014.docx
- 08:20, 15 May 2014 diff hist +12 m 236.3 Administration Per RW, updated Form 3.3.3B, RW Cost Estimate
- 13:36, 14 May 2014 diff hist +16 m Main Page
- 13:32, 14 May 2014 diff hist +282 m LPA:136.13 LPA Policy Changes EPG 136.8.4
- 13:30, 14 May 2014 diff hist +67 m LPA:136.8 Local Public Agency Land Acquisition
- 13:28, 14 May 2014 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.8.17
- 13:27, 14 May 2014 diff hist 0 N File:136.8.17 2014.doc current
- 13:27, 14 May 2014 diff hist -385 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Form 136.8.17 to be an optional form.
- 12:55, 14 May 2014 diff hist -1 m Category:139 Design - Build →139.8.2.4 Authorization to Release RFP
- 12:54, 14 May 2014 diff hist 0 N File:139.8.2.6(b).docx current
- 12:53, 14 May 2014 diff hist 0 N File:139 Project Certification Example.pdf current
- 12:53, 14 May 2014 diff hist 0 N File:139 Commission Award Example.pdf current
- 12:53, 14 May 2014 diff hist 0 N File:139 Financial Services Coding 2014.pdf current
- 12:53, 14 May 2014 diff hist +838 m Category:139 Design - Build Per Statewide Design-Build Coordinator, several minor clarifications
- 10:39, 14 May 2014 diff hist 0 N File:Main Page May 14a, 2014.jpg current
- 10:39, 14 May 2014 diff hist -11 m Main Page new photo
- 09:27, 14 May 2014 diff hist 0 N File:Main Page May 14, 2014.jpg current
- 09:27, 14 May 2014 diff hist +13 m Main Page EPG 617.1
- 08:50, 14 May 2014 diff hist +292 m 617.1 Temporary Traffic Barriers Per Design, clarification to provide consistency in payment for relocating barrier wall and impact attenuators
- 07:09, 14 May 2014 diff hist -4 m Category:756 Seismic Design Per Bridge, updated Seismic Design Process Flowchart link
- 14:34, 13 May 2014 diff hist +145 m LPA:136.13 LPA Policy Changes Fig. 136.8.20
- 14:32, 13 May 2014 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.8.20
- 14:32, 13 May 2014 diff hist 0 N File:136.8.20.docx
- 14:31, 13 May 2014 diff hist +2 m LPA:136.8 Local Public Agency Land Acquisition Per RW, Fig. 136.8.20 verbiage tweaked to include more uniform act check items
- 11:12, 13 May 2014 diff hist +89 m Category:756 Seismic Design Per Bridge, updated link to the Bridge Seismic Design Process Flowchart
- 09:49, 13 May 2014 diff hist +97 m LPA:136.13 LPA Policy Changes Fig. 136.3.18
- 09:48, 13 May 2014 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated Fig. 136.3.18
- 09:48, 13 May 2014 diff hist 0 N File:136.3.18 2014.xls current
- 09:47, 13 May 2014 diff hist +10 m LPA:136.3 Federal Aid Basics Per LPA, updated Fig. 136.3.18
- 09:16, 13 May 2014 diff hist -8 m Main Page EPG 903.3.8
- 09:11, 13 May 2014 diff hist +97 m 903.3 Ground-Mounted Sign Supports →903.3.8 Perforated Square Steel Tube Posts: Per Traffic, updated a PSST post link to provide improved guidance.
- 08:44, 13 May 2014 diff hist 0 N File:Main Page May 13, 2014.jpg current
- 08:44, 13 May 2014 diff hist -136 m Main Page EPG 105.23
- 07:41, 13 May 2014 diff hist +79 m Category:105 Control of Work →105.23 Quality Management: added link
- 07:36, 13 May 2014 diff hist +676 m Category:105 Control of Work →105.23 Quality Management: Per CM, new QM SiteManager guidance for only MoDOT staff
- 13:45, 12 May 2014 diff hist -1 m Main Page
- 10:36, 12 May 2014 diff hist +289 m LPA:136.13 LPA Policy Changes EPG 136.11.17.1
- 10:32, 12 May 2014 diff hist +58 m LPA:136.11 Local Public Agency Construction →136.11.17.1 Material Acceptance: inserted link
- 10:30, 12 May 2014 diff hist 0 m LPA:136.11 Local Public Agency Construction →136.11.17.1 Material Acceptance: Per LPA, minor correction
- 08:47, 12 May 2014 diff hist -2 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (TL-4 [NCHRP 350]): minor clarification, per Bridge
- 10:20, 9 May 2014 diff hist 0 N File:Main Page May 9, 2014.jpg current
- 10:20, 9 May 2014 diff hist -650 m Main Page new photo
- 08:03, 9 May 2014 diff hist 0 N File:236.7 Form 7.8.1.docx
- 08:03, 9 May 2014 diff hist +277 m 236.7 Negotiation Per RW, clarification about negotiator's experience. Also, Form 7.8.1, Application for Employment as a Contract Negotiator, updated.
- 13:23, 7 May 2014 diff hist -68 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per Design, consultant invoices no longer must be electronically submitted by the PM/CA to Design Div.
- 13:09, 7 May 2014 diff hist 0 N File:Main Page May 7, 2014.jpg current
- 13:09, 7 May 2014 diff hist -96 m Main Page EPG 236.3.3
- 12:53, 7 May 2014 diff hist 0 N File:236.6.3.1 Standard Appraisal.docx