User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:58, 14 July 2014 diff hist -113 m Category:756 Seismic Design Per Bridge, updated Bridge seismic design process flowchart
- 10:16, 14 July 2014 diff hist +418 m Main Page EPG 402 and EPG 409
- 08:18, 14 July 2014 diff hist -220 m Category:173 Erosion Control for Maintenance Operations →173.8.2 Regulatory Conditions for Working in Streams/Wetlands: Per Bridge, update to reflect 2012 Corps of Engineer Regional Condition 1
- 14:30, 10 July 2014 diff hist +101 m Main Page EPG 751.5.11.1 and EPG 751.50
- 14:28, 10 July 2014 diff hist +29 m 751.50 Standard Detailing Notes added link
- 14:21, 10 July 2014 diff hist +311 m 751.50 Standard Detailing Notes Per Bridge, revision at AGC's request. New guidance to specify the need for additional mechanical bar splices when required in the approach slabs because of stage construction.
- 13:50, 10 July 2014 diff hist +47 m 751.5 Structural Detailing Guidelines →751.5.11.1 General: added link
- 13:46, 10 July 2014 diff hist 0 N File:751.5.11.1 splice No 2.jpg current
- 13:46, 10 July 2014 diff hist 0 N File:751.5.11.1 splice No 1.jpg current
- 13:45, 10 July 2014 diff hist 0 N File:751.5.11.1 Example.pdf
- 13:45, 10 July 2014 diff hist +2,321 m 751.5 Structural Detailing Guidelines →751.5.11.1 General: Per Bridge, revision at AGC's request. New guidance to specify the need for additional mechanical bar splices when required in the approach slabs because of stage construction.
- 11:23, 10 July 2014 diff hist +29 m Main Page
- 10:52, 10 July 2014 diff hist -4 m Main Page
- 10:46, 10 July 2014 diff hist 0 N File:Main Page 4 July 10, 2014.jpg current
- 10:45, 10 July 2014 diff hist 0 N File:Main Page 2 July 10, 2014.jpg current
- 10:45, 10 July 2014 diff hist 0 N File:Main Page 3 July 10, 2014.jpg current
- 10:43, 10 July 2014 diff hist 0 N File:Main Page July 10, 2014.jpg current
- 10:43, 10 July 2014 diff hist -252 m Main Page
- 12:16, 9 July 2014 diff hist -127 m Main Page
- 07:14, 9 July 2014 diff hist -1 m Category:409 Seal Coat UPdated with Danica's name
- 12:27, 8 July 2014 diff hist 0 N File:Main Page July 8, 2014.jpg current
- 12:27, 8 July 2014 diff hist +142 m Main Page EPG 101 and EPG 236.5.25.6
- 09:37, 8 July 2014 diff hist -294 m 905.2 Traffic Studies →905.2.3 Countermeasure Selection: Per Traffic, removed archaic language
- 09:19, 8 July 2014 diff hist +387 m 905.2 Traffic Studies →905.2.3 Countermeasure Selection
- 08:52, 8 July 2014 diff hist 0 N File:233.2.6 J-turn.pdf current
- 08:51, 8 July 2014 diff hist +281 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.6 Type 4: Directional Median Opening with Downstream U-Turns: Per Traffic, added MU's evaluation of the J-turn
- 08:41, 8 July 2014 diff hist +33 m 236.5 Property Management updated link
- 08:38, 8 July 2014 diff hist 0 N File:236.5.25.6 Hwy Structure Security Assessment.xls current
- 08:38, 8 July 2014 diff hist 0 N File:236.5 Bridge Column Protection Auto.pdf
- 08:37, 8 July 2014 diff hist 0 N File:236.5 Bridge Column Protection Truck.pdf
- 08:37, 8 July 2014 diff hist -649 m 236.5 Property Management Per RW, clarified security assessment for leased areas guidance, and an associated form and two figures
- 07:20, 8 July 2014 diff hist 0 File:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx uploaded a new version of "Image:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx"
- 07:20, 8 July 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx
- 07:20, 8 July 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) July 2014.docx
- 07:19, 8 July 2014 diff hist +15 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated 2 QRGs (Digital Signature for Adobe Pro 10) for contractors and MoDOT
- 08:29, 7 July 2014 diff hist 0 N File:Main Page July 7, 2014.jpg current
- 08:29, 7 July 2014 diff hist +71 m Main Page new photo
- 12:31, 2 July 2014 diff hist +3 m Main Page
- 12:29, 2 July 2014 diff hist 0 N File:Main Page July 2, 2014.jpg current
- 12:29, 2 July 2014 diff hist -397 m Main Page EPG 102.2
- 11:12, 2 July 2014 diff hist +144 m Talk:102.2 Contractor Performance Rating System current
- 11:09, 2 July 2014 diff hist 0 N File:102.2 CPQ.pdf
- 11:09, 2 July 2014 diff hist -64 m 102.2 Contractor Performance Rating System Per CM, updated Contractor Performance Evaluation Example Form
- 07:41, 2 July 2014 diff hist +204 m Main Page EPG 132
- 07:23, 2 July 2014 diff hist +717 m Category:132 Safety Added PPE posters
- 15:08, 1 July 2014 diff hist -121 m Main Page EPG 104.13.2
- 15:05, 1 July 2014 diff hist +1,090 m 104.13 Construction Inspection Guidance for Sec 104 →Concept Proposal: Per EPG, guidance expanded to clarify/remind the resident engineers and any contractors of the minimum expectations for VECP and PDVECP submittal information
- 14:38, 1 July 2014 diff hist +11 m Category:130 Value Engineering →130.2 Contractor initiated VECPs: Per EPG, removal of "contractor initiated" verbiage to more properly reflect Construction Division's view
- 13:51, 1 July 2014 diff hist 0 N File:Main Page 2 July 1, 2014.jpg current
- 13:50, 1 July 2014 diff hist 0 N File:Main Page July 1, 2014.jpg current