User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:14, 20 August 2014 diff hist 0 m Category:138 Project Development Chronology updated link
- 14:27, 18 August 2014 diff hist 0 N File:Main Page Aug 18, 2014.jpg current
- 14:27, 18 August 2014 diff hist -453 m Main Page EPG 751.1.2.6
- 13:03, 18 August 2014 diff hist +1,006 m 751.1 Preliminary Design →751.1.2.6.3.3 Roadway Fill: Per Bridge, added guidance for minimum fill over box culverts under roadway
- 12:50, 18 August 2014 diff hist +70 m 748.4 Headwater and Backwater →748.4.1 Headwater: Per Bridge, clarification of when to apply one of the criteria
- 12:22, 18 August 2014 diff hist +1,343 m 121.3 The Statewide Transportation Improvement Program (STIP) Per EPG, added box presenting info including the allowance of Taking Care of the System projects and System Exp projects completely funded by other entities
- 10:01, 15 August 2014 diff hist +73 m 750.7 Non-Hydraulic Considerations →750.7.11.1 Minimum Fill Heights: Per Bridge, further clarification for min. fill of aggregate base material
- 08:38, 15 August 2014 diff hist 0 N File:Main Page Aug 15, 2014.jpg current
- 08:38, 15 August 2014 diff hist -47 m Main Page
- 15:19, 13 August 2014 diff hist +157 m Main Page EPG 903.10
- 15:16, 13 August 2014 diff hist -1 m Category:644 Weigh Stations, Rest Areas, Welcome/Information Centers and Commuter Parking Lots updated link
- 15:15, 13 August 2014 diff hist 0 m 903.9 General Information Signs →903.9.19 Veterans Signing: updated link
- 15:15, 13 August 2014 diff hist -13,558 m 903.10 General Service Signs Per Traffic, updated General Service Signs guidance to comply with current practice. Renumbered subtitles in the rest of the article
- 15:06, 13 August 2014 diff hist -65 m Category:903 Highway Signing updated link
- 14:36, 13 August 2014 diff hist -164 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP)
- 14:27, 13 August 2014 diff hist -3 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing: minor correction
- 14:01, 13 August 2014 diff hist +309 m Main Page EPG 806.8
- 13:55, 13 August 2014 diff hist +113 m 806.8 Storm Water Pollution Prevention Plan (SWPPP)
- 13:53, 13 August 2014 diff hist 0 N File:Main Page Aug 13, 2014.jpg current
- 13:52, 13 August 2014 diff hist -574 m Main Page
- 10:45, 13 August 2014 diff hist 0 N File:806.8 Land Disturbance 2014.ppt current
- 10:45, 13 August 2014 diff hist +178 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, updated the Land Disturbance Training as well as made a video available for iPads and tablets.
- 07:56, 13 August 2014 diff hist -44 m LPA:136.10 Advertisement for Bid and Project Award removed links
- 07:51, 13 August 2014 diff hist 0 m 903.18 Signing for School Areas →Table 903.19.13 Sight Distance Requirements for use of the S3-1 sign: Per Traffic, revised min sight dist to 300 ft for the use of the S3-1 sign
- 12:00, 12 August 2014 diff hist +182 m 903.18 Signing for School Areas Per Traffic, added link to Table 903.6.6 for clarification
- 10:51, 12 August 2014 diff hist 0 N File:Figure 903.6.28 2014.jpg current
- 10:50, 12 August 2014 diff hist +125 m 903.6 Warning Signs Per Traffic, several clarifications including updated Fig. 903.6.28 to remove the unnecessary 175' dimension
- 10:10, 12 August 2014 diff hist 0 m Main Page EPG 750.7.11.1
- 09:25, 12 August 2014 diff hist 0 N File:Main Page 2 Aug 12, 2014.jpg current
- 09:25, 12 August 2014 diff hist 0 N File:Main Page Aug 12, 2014.jpg current
- 09:23, 12 August 2014 diff hist -144 Main Page
- 08:50, 12 August 2014 diff hist +195 m 751.8 Concrete Box Culverts →751.8.1.2 Standard Box Culverts: Per Bridge, added link to index to box culvert standard plans and table of standard box culvert sizes in EPG 750.7.4.1
- 08:45, 12 August 2014 diff hist +187 m 750.7 Non-Hydraulic Considerations →750.7.11.1 Minimum Fill Heights: Per Bridge, added guidance for minimum fill heights over box culverts. Update guidance for minimum fill heights over pipes.
- 08:39, 12 August 2014 diff hist -274 m 104.13 Construction Inspection Guidance for Sec 104 Per Construction, updated C-104 Form
- 09:49, 11 August 2014 diff hist -2 m Main Page
- 11:14, 8 August 2014 diff hist -90 m Main Page EPG 751.50
- 11:12, 8 August 2014 diff hist +314 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per Bridge, updated Note A1 for LRFD Seismic Design
- 10:37, 8 August 2014 diff hist 0 N File:Main Page 2 Aug 8, 2014.jpg current
- 10:37, 8 August 2014 diff hist 0 N File:Main Page Aug 8, 2014.jpg current
- 10:36, 8 August 2014 diff hist -221 m Main Page EPG 751.5.3
- 10:09, 8 August 2014 diff hist +9 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated link
- 10:08, 8 August 2014 diff hist +9 m 104.7 Scoping Estimates Updated link
- 10:06, 8 August 2014 diff hist +9 m Category:104 Scope Updated link
- 10:01, 8 August 2014 diff hist 0 m 121.3 The Statewide Transportation Improvement Program (STIP) Updated STIP link
- 09:48, 8 August 2014 diff hist 0 N File:751.5.3 streams.jpg current
- 09:47, 8 August 2014 diff hist 0 N File:751.5.3 culverts.jpg current
- 09:47, 8 August 2014 diff hist +131 m 751.5 Structural Detailing Guidelines →751.5.3 Hydraulics: Per Bridge, revised flood data tables and guidance to match revisions in other articles to be consistent with practical design.
- 08:28, 8 August 2014 diff hist +263 m LPA:136.13 LPA Policy Changes EPG 136.11.20
- 08:17, 8 August 2014 diff hist +181 m LPA:136.11 Local Public Agency Construction →136.11.20 Project Closeout Certifications: Per LPA, project closeout certifications are now to be electronically received 60 days of the Final Inspection date.
- 07:12, 8 August 2014 diff hist +304 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.3