- 15:37, 18 December 2014 diff hist +1,969 m 751.50 Standard Detailing Notes Per Bridge, incorporated Fiber Reinforced Polymer slab drain details and guidance to provide another material option.
- 14:37, 18 December 2014 diff hist +8 m 751.10 General Superstructure →751.10.3.2.1 New Structure Without Wearing Surface Slab Drains - Details
- 14:36, 18 December 2014 diff hist +1,211 m 751.10 General Superstructure →751.10.3.2.1 New Structure Without Wearing Surface Slab Drains - Details: added slab drain drawing links
- 14:17, 18 December 2014 diff hist +2,336 m 751.40 LFD Widening and Repair →751.40.5.1 Slab Drain Details: Per Bridge, incorporated Fiber Reinforced Polymer slab drain details and guidance to provide another material option.
- 13:35, 18 December 2014 diff hist 0 N File:751.10.3.2.1 optional.jpg current
- 13:34, 18 December 2014 diff hist 0 N File:751.10.3.2.1 angled.jpg current
- 13:34, 18 December 2014 diff hist 0 N File:751.10.3.2.1 straight.jpg current
- 13:33, 18 December 2014 diff hist -325 m 751.10 General Superstructure →751.10.3 Bridge Deck Drainage - Slab Drains: Per Bridge, incorporated Fiber Reinforced Polymer slab drain details and guidance to provide another material option.
- 10:04, 18 December 2014 diff hist +372 m 751.1 Preliminary Design →751.1.1.1 Introduction: Per Bridge, incorporated Fiber Reinforced Polymer slab drain details and guidance to provide another material option.
- 09:25, 18 December 2014 diff hist +1,310 m 751.5 Structural Detailing Guidelines Per Bridge, added an abbreviation; clarified guidance to 751.5.2.1.3 Structure Description
- 14:43, 17 December 2014 diff hist +1,043 m Category:134 Engineering Professional Services Added ''Helpful Links for Engineering Policy'' info from website
- 14:26, 17 December 2014 diff hist +1 m Main Page
- 08:11, 17 December 2014 diff hist -12 m 750.7 Non-Hydraulic Considerations Per Bridge, clarified use of "barrel" (usually by replacing it with "box")
- 09:22, 16 December 2014 diff hist 0 N File:101 Design Layout Stream 2014.docx
- 09:22, 16 December 2014 diff hist 0 N File:101 Design Layout Box 2014.docx
- 09:21, 16 December 2014 diff hist 0 N File:101 Culvert Hydraulics Report.docx current
- 09:21, 16 December 2014 diff hist 0 N File:101 Bridge Hydraulics Report.docx current
- 09:21, 16 December 2014 diff hist +13 m Category:101 Standard Forms →Bridge: Per Bridge, updated four forms
- 09:43, 15 December 2014 diff hist -41 m Main Page EPG 104.7
- 08:32, 15 December 2014 diff hist 0 N File:Fig 104.7 2014.doc
- 08:32, 15 December 2014 diff hist 0 m 104.7 Scoping Estimates Per Estimate and Review, Cost Est. Guide for Rural Prelim Design updated with new Maintenance Treatment per mile cost
- 08:14, 15 December 2014 diff hist 0 N File:147 fence Dec 15 2014.doc current
- 08:14, 15 December 2014 diff hist 0 N File:147 guardrail guard cable Dec 2014.docx
- 08:14, 15 December 2014 diff hist 0 N File:147 guard cable Dec 2014.doc current
- 08:14, 15 December 2014 diff hist 0 N File:147 guardrail Dec 2014.doc current
- 08:14, 15 December 2014 diff hist +15 m 147.3 Job Order Contracting (JOC) Per Estimate and Review, updated several JSPs so that they are no longer in revision mode
- 15:23, 12 December 2014 diff hist 0 m Main Page
- 15:14, 12 December 2014 diff hist 0 N File:Emergency Contacts Dec 2014.docx
- 15:14, 12 December 2014 diff hist +4 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, corrected Emergency Conctacts QRG
- 12:22, 11 December 2014 diff hist 0 N File:Main Page Dec 11, 2014.jpg current
- 12:21, 11 December 2014 diff hist -54 m Main Page new photo
- 09:34, 11 December 2014 diff hist 0 N File:751.10.1.7 Dec 2014.jpg current
- 09:34, 11 December 2014 diff hist +3 m 751.10 General Superstructure →751.10.1.7 Standard Bridge Deck Details: Per Bridge, updated figure
- 14:51, 10 December 2014 diff hist +9 m 751.50 Standard Detailing Notes →H. Superstructure Notes: Per Bridge, minor clarifications
- 12:11, 10 December 2014 diff hist -88 m Main Page EPG 101
- 11:20, 10 December 2014 diff hist +47 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: added link
- 11:17, 10 December 2014 diff hist 0 N File:Liquidated Damage Adjustments.docx
- 11:17, 10 December 2014 diff hist +79 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new QRG, Liquidated Damage Adjustments.
- 09:35, 10 December 2014 diff hist -8 m 751.1 Preliminary Design →751.1.2.18.2 Content: minor clarifications
- 09:31, 10 December 2014 diff hist -75 m 751.1 Preliminary Design →751.1.1.2 Bridge Survey Processing and Bridge Numbering: Per Bridge, minor update
- 09:29, 10 December 2014 diff hist +30 m 751.9 Bridge Seismic Design →751.9.2.6.3 Pile Axial Stiffness: updated link
- 09:08, 10 December 2014 diff hist -5 m 750.7 Non-Hydraulic Considerations →750.7.4.3 Summary of Responsibilities
- 09:07, 10 December 2014 diff hist +66 m 750.7 Non-Hydraulic Considerations →750.7.4.3 Summary of Responsibilities: Per Bridge, updated link
- 09:04, 10 December 2014 diff hist +78 m Category:747 Bridge Reports and Layouts updated links
- 08:51, 10 December 2014 diff hist -14 m 238.3 Route Surveying →238.3.36.3.1 Coordination of Survey
- 08:51, 10 December 2014 diff hist +84 m Category:101 Standard Forms →Design: Per Bridge, added Bridge Survey Checklist; updated Bridge Survey Report Form
- 08:39, 10 December 2014 diff hist 0 N File:147 asphalt pavement repair Dec 10 2014.doc current
- 08:39, 10 December 2014 diff hist +3 m 147.3 Job Order Contracting (JOC) Per Estimate and Review, minor revisions to JSP G of the JOC-Asphalt Pavement Repair
- 08:33, 10 December 2014 diff hist 0 m Main Page
- 08:23, 10 December 2014 diff hist -5 m 751.5 Structural Detailing Guidelines →Elevations: Per Bridge, revised "high water" to "flood" to correspond to all of their other recent revisions