User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:59, 4 March 2015 diff hist 0 N File:Main Page Mar 4, 2015.jpg current
- 11:58, 4 March 2015 diff hist -63 m Main Page EPG 127.29
- 11:28, 4 March 2015 diff hist 0 N File:127.29.8 map.jpg current
- 11:27, 4 March 2015 diff hist 0 N File:127.29.7 post-construction flow chart.jpg current
- 11:27, 4 March 2015 diff hist 0 N File:127.29.7 focal point.jpg current
- 11:27, 4 March 2015 diff hist 0 N File:127.29.7 I-64.jpg current
- 11:26, 4 March 2015 diff hist 0 N File:127.29.7 bioswale.jpg current
- 11:26, 4 March 2015 diff hist 0 N File:127.29.7 flowchart.jpg current
- 11:26, 4 March 2015 diff hist 0 N File:127.29.7 wetland.jpg current
- 11:25, 4 March 2015 diff hist 0 N File:127.29.7 swales.jpg current
- 11:25, 4 March 2015 diff hist 0 N File:127.29.7 detention.jpg current
- 11:24, 4 March 2015 diff hist +24,493 m 127.29 Stormwater Per Environmental, updated entire article to meet current practice
- 15:20, 3 March 2015 diff hist +364 m 236.9 Asbestos Abatement-Removal of Building Improvement Per RW, updated link
- 14:19, 3 March 2015 diff hist -10 m 236.8 Relocation Assistance Program updated links
- 11:17, 3 March 2015 diff hist +48 m Category:450 Bituminous Pavement Design →450.4 Level Course: update that was inadvertently overlooked
- 14:21, 2 March 2015 diff hist -2 m Main Page
- 08:53, 27 February 2015 diff hist -73 m 751.50 Standard Detailing Notes Per Bridge, removed references to neoprene in B1b notes
- 08:22, 27 February 2015 diff hist 0 N File:751.1 Prelim Design Acceptable Rail No. 4.jpg current
- 08:22, 27 February 2015 diff hist +6 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations): Per Bridge, slight clarification to a figure
- 16:18, 26 February 2015 diff hist +351 m 751.50 Standard Detailing Notes Per Bridge, updated various notes to better match current practice or improve the notes' function
- 15:42, 26 February 2015 diff hist +43 m 751.31 Open Concrete Intermediate Bents →751.31.2.4 Column Analysis: Per Bridge, corrected an outdated reference to a figure
- 15:37, 26 February 2015 diff hist 0 N File:751.10.1.13 double.jpg current
- 15:36, 26 February 2015 diff hist 0 N File:751.10.1.13 single.jpg current
- 15:35, 26 February 2015 diff hist +31 m 751.10 General Superstructure →751.10.1.13 Drip Bevel: Per Bridge, clarified terminology
- 13:50, 26 February 2015 diff hist +194 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: new figures in EPG 136.8 (Forms 136.2.2 and 136.2.2.A) and revised Form 136.8.1
- 13:46, 26 February 2015 diff hist +639 m LPA:136.13 LPA Policy Changes EPG 136.8
- 13:41, 26 February 2015 diff hist +2 m LPA:136.8 Local Public Agency Land Acquisition →136.8.8.1 General
- 13:40, 26 February 2015 diff hist +6 m LPA:136.8 Local Public Agency Land Acquisition →136.8.2.2 Acquisition Authority
- 13:40, 26 February 2015 diff hist 0 N File:136.8.2.2.A.docx
- 13:39, 26 February 2015 diff hist 0 N File:136.8.2.2.docx
- 13:38, 26 February 2015 diff hist 0 N File:136.8.1 2015.doc current
- 13:37, 26 February 2015 diff hist +177 m LPA:136.8 Local Public Agency Land Acquisition
- 13:36, 26 February 2015 diff hist +247 m LPA:136.8 Local Public Agency Land Acquisition Per RW, guidance has been expanded for the streamlined documentation process for the acquisitions of LPA projects
- 11:03, 26 February 2015 diff hist +36 m 236.8 Relocation Assistance Program Updated 2 MO Rev Statutes links
- 14:47, 25 February 2015 diff hist 0 N File:Main Page Feb 25, 2015.jpg current
- 14:47, 25 February 2015 diff hist +1,329 m Main Page EPG 620, EPG 628, EPG 910.5
- 13:52, 25 February 2015 diff hist 0 N File:910.5.2.jpg current
- 13:52, 25 February 2015 diff hist +12,156 N 910.5 ITS Improvements Procurement Per DE, this new article provides guidance on federalizing ITS purchases whether they are standalone or a part of a construction project.
- 13:49, 25 February 2015 diff hist 0 N File:HFST.jpg current
- 13:48, 25 February 2015 diff hist +74 m Category:600 INCIDENTAL CONSTRUCTION EPG 628, new article
- 13:47, 25 February 2015 diff hist 0 N File:628 HFST demonstration.docx current
- 13:47, 25 February 2015 diff hist +6,139 N Category:628 High Friction Surface Treatment HFST cost-effectively increases the safety of road segments where vehicles frequently depart the traveled way due to polishing of the existing pavem't aggregate or by slightly substandard geometry
- 13:40, 25 February 2015 diff hist +22 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:38, 25 February 2015 diff hist -2,236 620.12 Construction Inspection for Sec 620 Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:37, 25 February 2015 diff hist -67 620.11 Guidelines for Using Water-Borne Traffic Paint Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:36, 25 February 2015 diff hist -1,749 620.10 Operational Procedures and Safety Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:35, 25 February 2015 diff hist -630 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:34, 25 February 2015 diff hist -1,632 m 620.1 General (MUTCD Chapter 3A) Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:32, 25 February 2015 diff hist -764 m Category:620 Pavement Marking Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 10:21, 25 February 2015 diff hist +208 m Main Page EPG 450, EPG 402