User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:27, 30 June 2015 diff hist +6,993 m Category:143 Practical Design Per EPG, new guidance leads designers to consider typical items during project design to produce a practical application of radical cost control.
- 07:20, 30 June 2015 diff hist +220 m LPA:136.13 LPA Policy Changes Fig 136.6.7
- 07:17, 30 June 2015 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.6.7
- 07:15, 30 June 2015 diff hist 0 N File:136.6.7 2015.docx
- 07:15, 30 June 2015 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements Per Hist Pres, Fig. 136.6.7 updated to correct a technical issue and to reference recently developed bridge documentation standards
- 09:22, 29 June 2015 diff hist -106 m 751.50 Standard Detailing Notes →H6. Pouring and Finishing Concrete Slabs: Per BR, note H6.18 was corrected be removing the circle because the note is not a cell.
- 14:54, 26 June 2015 diff hist -32 m Category:409 Seal Coat Removed outdated pdfs of contract seal coat plan pdf files
- 14:52, 26 June 2015 diff hist -100 m Category:402 Bituminous Surface Leveling Removed outdated pdfs of contract level plan pdf files
- 14:04, 26 June 2015 diff hist 0 N File:402 JSP FY16.doc current
- 14:03, 26 June 2015 diff hist 0 N File:402 FY2016 Contract Leveling Coat Guidelines.docx
- 14:03, 26 June 2015 diff hist +7 m Category:402 Bituminous Surface Leveling correction
- 14:01, 26 June 2015 diff hist -16 m Category:402 Bituminous Surface Leveling The CLC and Seal Coat guidelines and JSP packages were updated
- 14:01, 26 June 2015 diff hist +60 m Main Page corerction to EPG 402 and EPG 409
- 13:54, 26 June 2015 diff hist 0 N File:409 JSP FY16a.doc current
- 13:54, 26 June 2015 diff hist 0 N File:409 FY2016 Contract Seal Coat Guidelines.doc current
- 13:54, 26 June 2015 diff hist 0 m Category:409 Seal Coat corrected files
- 13:09, 26 June 2015 diff hist +127 m Main Page EPG 409
- 12:49, 26 June 2015 diff hist 0 N File:409 JSP FY16.doc current
- 12:49, 26 June 2015 diff hist 0 N File:409 FY2016 Contract Seal Coat Guidelines.docx
- 12:48, 26 June 2015 diff hist +451 m Category:409 Seal Coat Per Est. and Review, updated the CLC guidelines and the Seal Coat JSP package. Provided contractor flexibility and increased potential usage of seal coats.
- 09:07, 25 June 2015 diff hist +63 m Main Page EPG 606.1
- 08:58, 25 June 2015 diff hist +2 m 606.1 Guardrail →606.1.3.1 3R/4R Projects
- 08:55, 25 June 2015 diff hist +83 m 606.1 Guardrail →606.1.3.1 3R/4R Projects
- 08:53, 25 June 2015 diff hist +387 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Per EPG, some situations will not allow adjustment to 29" & an adjusted height of 27 3/4" is acceptable. This revision clarifies this acceptable practice.
- 07:01, 25 June 2015 diff hist +9 m Main Page
- 13:44, 24 June 2015 diff hist -37 m 751.50 Standard Detailing Notes →I1. General: Per Bridge, clarification of I1.52
- 12:08, 24 June 2015 diff hist 0 N File:Main Page June 24, 2015.jpg current
- 12:08, 24 June 2015 diff hist -207 m Main Page
- 11:04, 24 June 2015 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, minor clarification
- 14:41, 23 June 2015 diff hist 0 m Main Page
- 09:06, 23 June 2015 diff hist +5 m 237.7 Equipment and Materials List updated link
- 15:13, 22 June 2015 diff hist +222 Other Aspects of Pavement Design →Minor Roads: two new designs of bridge approach slabs were implemented. The new designs reduce construction costs while maintaining current performance
- 14:39, 22 June 2015 diff hist +250 m Main Page Bridge approach slab
- 14:29, 22 June 2015 diff hist +678 Category:806 Pollution, Erosion and Sediment Control →Permanent Diversions: Per Bridge, implementation of two new designs of bridge approach slabs. The new designs reduce construction costs while maintaining current performance
- 14:29, 22 June 2015 diff hist -290 751.50 Standard Detailing Notes Per Bridge, implementation of two new designs of bridge approach slabs. The new designs reduce construction costs while maintaining current performance
- 13:57, 22 June 2015 diff hist +2,305 751.1 Preliminary Design Per BR, revised preliminary design guidance for new bridge approach slabs and bridge end drainage.
- 13:31, 22 June 2015 diff hist +6,221 748.7 Bridge Deck and Bridge End Drainage Per BR, revised article to include guidance for bridge end drainage
- 13:29, 22 June 2015 diff hist 0 m 748.7 Bridge Deck and Bridge End Drainage 748.7 Bridge Deck Drainage moved to 748.7 Bridge Deck and Bridge End Drainage: BR revised article to include guidance for bridge end drainage
- 13:29, 22 June 2015 diff hist +55 N 748.7 Bridge Deck Drainage 748.7 Bridge Deck Drainage moved to 748.7 Bridge Deck and Bridge End Drainage: BR revised article to include guidance for bridge end drainage current
- 13:27, 22 June 2015 diff hist +195 m 611.1 Rock Blanket →611.1.1 Design: Per Bridge, clarification for uses of rock blankets at bridge ends
- 13:23, 22 June 2015 diff hist +3,456 Category:503 Bridge Approach Slabs Per Bridge, implementation of two new designs of bridge approach slabs. The new designs reduce construction costs while maintaining current performance
- 11:13, 22 June 2015 diff hist 0 N File:Main Page 3 June 22, 2015.jpg current
- 11:12, 22 June 2015 diff hist 0 N File:Main Page 2 June 22, 2015.jpg current
- 11:12, 22 June 2015 diff hist +10 m Main Page
- 11:12, 22 June 2015 diff hist 0 N File:Main Page June 22, 2015.jpg current
- 11:11, 22 June 2015 diff hist -18 m Main Page EPG 751.22.3.13
- 08:55, 22 June 2015 diff hist -1,239 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, guidance brought into compliance with standard drawings. Duplicate drawings removed.
- 08:09, 22 June 2015 diff hist +107 m LPA:136.13 LPA Policy Changes Fig. 136.11.13
- 08:08, 22 June 2015 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.11.13
- 08:07, 22 June 2015 diff hist -1 m LPA:136.11 Local Public Agency Construction Per LPA, updated job bulletin board checklist