User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:52, 22 April 2016 diff hist -357 m 127.25 Maintenance Environmental Policies →127.25.2.1 Hazardous Material Spills (Roadway) by Others: Per Envir'l, upated contact list
- 13:29, 22 April 2016 diff hist -255 m Main Page EPG 751.1.2.18.2, EPG 751.50 and EPG 236.13.13
- 13:15, 22 April 2016 diff hist +65 m 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing: inserted link
- 13:09, 22 April 2016 diff hist +4 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 12:07, 22 April 2016 diff hist -2 m Category:134 Engineering Professional Services →134.3.3 Man Hours Review: Per LPA, updated "should" to "shall" per revisions to 23 CFR 172.7(a)(1)(v)(B)
- 09:55, 22 April 2016 diff hist +420 m 751.50 Standard Detailing Notes →I1. General: Per BR, clearly stated that top of rock blanket shall be flush to ground line when redecks or rock blanket elevations aren’t shown on bridge plans and other cases
- 09:15, 22 April 2016 diff hist +502 m 751.1 Preliminary Design →751.1.2.18.2 Content: Per BR, clearly stated that top of rock blanket shall be flush to ground line when redecks or rock blanket elevations aren’t shown on bridge plans and other cases
- 07:51, 22 April 2016 diff hist +18 m 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing: Per RW, updated Plan Submittal and Filing process for how Design staff will provide DGN files to ROW staff to upload in Spatial Editor
- 13:06, 21 April 2016 diff hist 0 N File:Main Page Apr 21, 2016.jpg current
- 13:06, 21 April 2016 diff hist +106 m Main Page
- 15:02, 20 April 2016 diff hist 0 N File:Main Page Apr 20, 2016.jpg current
- 15:02, 20 April 2016 diff hist +164 m Main Page
- 13:11, 20 April 2016 diff hist +1 m Main Page
- 15:05, 19 April 2016 diff hist 0 m Main Page
- 11:10, 19 April 2016 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: updated link
- 15:13, 18 April 2016 diff hist 0 m Main Page
- 10:12, 18 April 2016 diff hist +24 m 616.16 Law Enforcement Services →616.16.2 Guidelines for the Selection of Law Enforcement Services: updated link to JSP
- 11:29, 15 April 2016 diff hist 0 N File:Main Page Apr 15, 2016.jpg current
- 11:29, 15 April 2016 diff hist 0 N File:Main Page 2 Apr 15, 2016.jpg current
- 11:29, 15 April 2016 diff hist +219 m Main Page
- 15:15, 14 April 2016 diff hist 0 m Main Page
- 14:53, 13 April 2016 diff hist 0 m Main Page
- 13:11, 11 April 2016 diff hist -2 m Main Page
- 14:35, 8 April 2016 diff hist +209 m 141.3 Local Funding Options updated RsMO links
- 14:28, 8 April 2016 diff hist -48 m 133.2 Equipment for Snow and Ice Control
- 14:27, 8 April 2016 diff hist +39 m LPA:136.9 Plans, Specs and Estimates (PSE) updated RsMO links
- 14:01, 8 April 2016 diff hist +4 m Category:151 Administrative Rule Creation or Modification Process updated RsMO link
- 13:55, 8 April 2016 diff hist +19 m 127.25 Maintenance Environmental Policies →127.25.2.1 Hazardous Material Spills (Roadway) by Others: updated RsMO link
- 13:53, 8 April 2016 diff hist +57 m 236.17 Junkyards updated RSMO links
- 13:46, 8 April 2016 diff hist +69 m Category:134 Engineering Professional Services updated RSMO links
- 07:29, 8 April 2016 diff hist +93 m 236.17 Junkyards Per RW, added Non Junkyard correspondence
- 07:16, 8 April 2016 diff hist -4 m Category:101 Standard Forms Per ECR, minor revision to Wage Interview Form
- 07:15, 8 April 2016 diff hist 0 N File:110.3.1 wage interview 2016.pdf
- 07:14, 8 April 2016 diff hist -4 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR, minor revision made to the Wage Interview Form
- 11:51, 7 April 2016 diff hist 0 N File:239 Project Timeline example 2016.doc current
- 11:51, 7 April 2016 diff hist +10 m Category:239 Construction Inspection Guidelines for Final Plans Per CM, udpated Project Timeline example to align with current practice
- 11:06, 7 April 2016 diff hist -287 m Category:101 Standard Forms →Construction and Materials: Per CM, removed 3 obsolete forms. Final Acceptance Checklist & Final Acceptance-Off System are now Cognos reports. Profilogragh Report no longer be used.
- 14:50, 6 April 2016 diff hist 0 m Main Page
- 07:30, 5 April 2016 diff hist 0 N File:Main Page Apr 5, 2016.jpg current
- 07:30, 5 April 2016 diff hist -184 m Main Page
- 15:06, 4 April 2016 diff hist -30 m Category:747 Bridge Reports and Layouts Per Bridge, udpated the Request for Final Soundings of Structure form
- 15:05, 4 April 2016 diff hist +20 m 320.4 Procedure for Final Sounding Per Bridge, updated Request for Final Soundings for Structures Form
- 15:04, 4 April 2016 diff hist +10 m 320.3 Drilling Operations Per Bridge, updated Request for Final Soundings for Structures Form
- 15:04, 4 April 2016 diff hist +5 m Category:101 Standard Forms Per Bridge, updated Request for Final Soundings for Structures Form
- 15:03, 4 April 2016 diff hist 0 N File:751.1.2.19 Guidance 2016.xlsx
- 15:03, 4 April 2016 diff hist 0 N File:751.1.2.19 Request 2016.xlsx
- 15:02, 4 April 2016 diff hist +20 m 751.1 Preliminary Design Per Bridge, updated both Request for Final Soundings for Structures Form and the Guidance for Request for Final Soundings of Structures with minor clarifications
- 12:14, 4 April 2016 diff hist 0 N File:Main Page Apr 4, 2016.jpg current
- 12:13, 4 April 2016 diff hist +132 m Main Page
- 10:37, 4 April 2016 diff hist 0 m Main Page