- 08:54, 1 June 2016 diff hist 0 N File:751.12.2.3 continuous 2.jpg
- 08:54, 1 June 2016 diff hist 0 N File:751.12.2.3 continuous 1.jpg
- 08:54, 1 June 2016 diff hist +134 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.3 End Bent Reinforcement: added continuous concrete slab figures, inadvertently omitted
- 08:50, 1 June 2016 diff hist 0 N File:751.12.2.3 Non-integral 2.jpg
- 08:50, 1 June 2016 diff hist 0 N File:751.12.2.3 Non-integral 1.jpg
- 08:49, 1 June 2016 diff hist 0 N File:751.12.2.3 Integral 2.jpg
- 08:49, 1 June 2016 diff hist 0 N File:751.12.2.3 Integral 1.jpg
- 08:49, 1 June 2016 diff hist 0 N File:751.12.2.2 2 1-4 wearing.jpg current
- 08:48, 1 June 2016 diff hist 0 N File:751.12.2.2 1 3-4 wearing.jpg current
- 08:48, 1 June 2016 diff hist 0 N File:751.12.2.2 no wearing.jpg current
- 08:48, 1 June 2016 diff hist 0 N File:751.12.2.1.jpg current
- 08:47, 1 June 2016 diff hist -13,873 751.12 Barriers, Railings, Curbs and Fences →751.12.2 Safety Barrier Bridge Curbs (NJ Shape): Per BR, addresses code changes for development and splicing of reinforcement with the 2015 Interim revisions of the AASHTO LRFD Bridge Design Spec
- 08:11, 1 June 2016 diff hist 0 m 751.12 Barriers, Railings, Curbs and Fences Per BR, minor correction
- 07:38, 1 June 2016 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.9.2.7.4 Development of Standard Hooked Deformed Bars in Tension
- 07:36, 1 June 2016 diff hist 0 N File:751.5.9.2.7.4 steps 6 and 7.jpg current
- 07:36, 1 June 2016 diff hist 0 N File:751.5.9.2.7.4 steps 1 through 5.jpg current
- 07:35, 1 June 2016 diff hist 0 N File:751.5.9.2.7.3.jpg current
- 07:34, 1 June 2016 diff hist 0 N File:751.5.9.2.7.2 step 7.jpg current
- 07:33, 1 June 2016 diff hist 0 N File:751.5.9.2.7.2 step 6.jpg current
- 07:32, 1 June 2016 diff hist 0 N File:751.5.9.2.7.2 step 1 through 5.jpg current
- 07:31, 1 June 2016 diff hist -1,979 751.5 Structural Detailing Guidelines →751.5.9.2.7 Development and Lap Splices: Per BR, addresses code changes for development and splicing of reinforcement with the 2015 Interim revisions of the AASHTO LRFD Bridge Design Specs
- 15:17, 31 May 2016 diff hist -101 m Main Page EPG 108.16.1
- 15:15, 31 May 2016 diff hist -540 m Category:108 Prosecution and Progress →108.16.1 Critical Dates: Per CM, deleted "Open to Traffic Date", which is now considered confusing and unnecessary.
- 15:09, 31 May 2016 diff hist -150 Main Page EPG 127.2
- 15:05, 31 May 2016 diff hist 0 N File:127.2 staff 2015.pdf
- 15:05, 31 May 2016 diff hist -10,730 127.2 Historic Preservation and Cultural Resources Per Env'l, revised necessary actions which should occur when human remains or significant artifacts are encountered during construction.
- 14:56, 31 May 2016 diff hist -183 Main Page EPG 127.25.1.1.1
- 14:53, 31 May 2016 diff hist +2,379 127.25 Maintenance Environmental Policies →127.25.1.1 Asbestos: EPG 127.25.1.1.1 added to ensure MoDOT maintains environmental compliance with asbestos on MoDOT bridges during maintenance activities.
- 14:44, 31 May 2016 diff hist +205 m Main Page EPG 606.1,etc. for MGS and MASH
- 14:31, 31 May 2016 diff hist +382 Category:Minor Routes Shouldering Project Guidelines Revised the minimum guardrail height of “26.5 inches” to “27 ¾ inches” for guardrail replacement guidance
- 14:20, 31 May 2016 diff hist -146 Category:171 Maintenance Policy and Operations Deleted RAP (A2) Non-National Highway System Roadway Guardrail
- 14:19, 31 May 2016 diff hist -346 171.11 Roadside Appurtenances Deleted RAP (A2) Non-National Highway System Roadway Guardrail paragraph.
- 14:18, 31 May 2016 diff hist 0 Category:143 Practical Design →143.2.4 Roadside Hardware: Revised the minimum guardrail height of “26.5 inches” to “27 ¾ inches” for guardrail replacement guidance.
- 14:16, 31 May 2016 diff hist +17 m 120.5 Roadside Features →Performance Objectives: Revised to include impact damaged guardrail in Performance Objectives guidance.
- 14:03, 31 May 2016 diff hist 0 N File:606.1.3.10.2.2.jpg current
- 14:03, 31 May 2016 diff hist 0 N File:606.1.3.10.2.jpg current
- 14:03, 31 May 2016 diff hist 0 N File:606.1.3.10.3.jpg current
- 14:02, 31 May 2016 diff hist 0 N File:606.1.3.10.1.jpg current
- 14:01, 31 May 2016 diff hist +12,261 m 606.1 Guardrail Per DE, article re-written to incorporate MGS, MASH, End Terminals guardrail requirements and guidance. Revised the closure of streets, roads, bridges and non-traversable roads.
- 13:58, 31 May 2016 diff hist +3,394 Category:606 Guardrail and Guard Cable Per DE, guidance now incorporates MGS, MASH, End Terminals guardrail requirements
- 13:44, 31 May 2016 diff hist -199 m Main Page
- 12:35, 27 May 2016 diff hist 0 N File:Main Page 2 May 27, 2016.jpg current
- 12:34, 27 May 2016 diff hist 0 N File:Main Page May 27, 2016.jpg current
- 12:34, 27 May 2016 diff hist +347 m Main Page
- 10:45, 27 May 2016 diff hist +173 m LPA:136.13 LPA Policy Changes Fig. 136.4.1
- 10:43, 27 May 2016 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.4.1
- 10:42, 27 May 2016 diff hist 0 N File:Fig. 136.4.1 May 2016.docx current
- 10:42, 27 May 2016 diff hist +28 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, in Fig. 136.4.1, added references to Title VI and ADA requirements in Articles XVI and XVII
- 09:24, 27 May 2016 diff hist -1 Category:153 Agreements and Contracts →153.1.5 Step 4, Approval and Execultion by the Other Party
- 09:13, 27 May 2016 diff hist +16 m Category:153 Agreements and Contracts Per DE and Brandi Baldwin, minor clarification of the agreement process steps