- 09:27, 15 September 2016 diff hist +181 m 153.7 Construction and Materials CCO renumbered the contracts. New links needed.
- 09:08, 15 September 2016 diff hist -46 m 153.5 Bridge CCO renumbered the contracts. New links needed.
- 08:36, 15 September 2016 diff hist -1,027 m 903.3 Ground-Mounted Sign Supports Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
- 08:21, 15 September 2016 diff hist +741 m 903.2 Extent of Signing →903.2.12 Quantity Computations: Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
- 13:52, 14 September 2016 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements
- 10:34, 14 September 2016 diff hist -199 m Main Page EPG 110.3
- 08:04, 14 September 2016 diff hist +397 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, guidance updated to comply with the e-Construction JSP.
- 07:20, 14 September 2016 diff hist +26 m 903.6 Warning Signs →903.6.33 LANE END Signs (W4-2, W9-1, W9-2) (MUTCD Section 2C.42): Per TS, clarification of the use of Lane Ends sign
- 11:29, 13 September 2016 diff hist +87 m Category:101 Standard Forms
- 11:28, 13 September 2016 diff hist +87 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
- 11:27, 13 September 2016 diff hist +87 m Category:101 Standard Forms →Construction and Materials: Per TS, updated WZ Inspection Form link
- 11:00, 13 September 2016 diff hist -2 m Main Page
- 10:24, 13 September 2016 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing
- 10:11, 13 September 2016 diff hist +54 m Category:101 Standard Forms Per TS, updated WZ Inspection Form links
- 10:10, 13 September 2016 diff hist +27 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
- 14:36, 9 September 2016 diff hist 0 m Main Page
- 14:44, 8 September 2016 diff hist 0 m Main Page
- 15:10, 7 September 2016 diff hist -211 m Category:747 Bridge Reports and Layouts →747.1.3.5 Valley/Channel Section Sheets: Per BR, rvision brings guidance into line with related changes previously completed in EPG 238.3.36.3.6.
- 15:07, 7 September 2016 diff hist -247 m 750.3 Bridges →750.3.2.5.2 Contraction Scour: Per BR, irrelevant paragraph removed
- 13:19, 7 September 2016 diff hist +42 m 236.8 Relocation Assistance Program Per RW, updated link to Form 236.8.9.4.8, Replacement Housing Claim (Form 236.8.9.4(b))
- 12:57, 7 September 2016 diff hist 0 N File:Main Page September 7, 2016.jpg current
- 12:57, 7 September 2016 diff hist +65 m Main Page
- 07:24, 7 September 2016 diff hist +35 m LPA:136.12 Figures, Glossary and Other Useful Links updated link to Form 136.8.7.1.11
- 07:19, 7 September 2016 diff hist +35 m LPA:136.13 LPA Policy Changes
- 07:18, 7 September 2016 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition
- 07:18, 7 September 2016 diff hist +35 m LPA:136.8 Local Public Agency Land Acquisition updated link
- 11:25, 6 September 2016 diff hist +214 m LPA:136.13 LPA Policy Changes Form 136.8.7.1.11
- 11:22, 6 September 2016 diff hist -157 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:21, 6 September 2016 diff hist +111 m LPA:136.12 Figures, Glossary and Other Useful Links Form 136.8.7.1.11
- 11:18, 6 September 2016 diff hist 0 N File:136.8.7.1.11.docx
- 11:17, 6 September 2016 diff hist +20 m LPA:136.8 Local Public Agency Land Acquisition
- 11:17, 6 September 2016 diff hist -197 m LPA:136.8 Local Public Agency Land Acquisition Per RW, the prorata tax form (7-22.2C) was updated to be only for the LPAs. It was also relabeled as Form 136.8.7.1.11.
- 10:56, 6 September 2016 diff hist +146 m Main Page EPG 131.1
- 10:08, 6 September 2016 diff hist -754 m 751.5 Structural Detailing Guidelines →751.5.8.1 Bridge Approach Slab: Per BR, deleted links to archaic drawings of Approach slabs.
- 08:21, 6 September 2016 diff hist +2,410 m 131.1 Design Exception Process Per EPG, federal rule has reduced controlling criteria to 10, reducing instances where fed approval is required for controlling criteria on federal involvement projects.
- 15:17, 2 September 2016 diff hist +1 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award
- 15:03, 2 September 2016 diff hist +4 m Main Page
- 14:23, 2 September 2016 diff hist 0 m LPA:136.13 LPA Policy Changes
- 14:22, 2 September 2016 diff hist +210 m LPA:136.13 LPA Policy Changes EPG 136.10.8
- 14:20, 2 September 2016 diff hist +5 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award: Per LPA, clarified the need for a performance/contract bond in the executed construction contract for LPA projects.
- 14:24, 31 August 2016 diff hist 0 N File:Main Page 2 August 31, 2016.jpg current
- 14:24, 31 August 2016 diff hist 0 N File:Main Page August 31, 2016.jpg current
- 14:24, 31 August 2016 diff hist +550 m Main Page
- 07:13, 31 August 2016 diff hist 0 m Category:407 Tack Coat →407.1.5 Method of Measurement (Sec 407.5): Per CM, minor correction. To round gallons to nearest gallon, not nearest 10 gallons
- 07:48, 30 August 2016 diff hist 0 m Main Page
- 10:43, 29 August 2016 diff hist +10 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 10:41, 29 August 2016 diff hist 0 N File:751.13.6.3 squared 2016.jpg current
- 10:41, 29 August 2016 diff hist +204 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 10:23, 29 August 2016 diff hist 0 N File:751.13.6.3 skewed 2016.jpg current
- 10:23, 29 August 2016 diff hist +4 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate