User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:48, 17 November 2016 diff hist +3 m Category:134 Engineering Professional Services Per LPA, revised Fig 134.2.4. Added #5 in the fig that was accidentally deleted during the last revision.
- 11:35, 16 November 2016 diff hist +254 m Category:153 Agreements and Contracts Per RW, updated links and minor changes to wording
- 13:49, 15 November 2016 diff hist 0 m Main Page
- 12:09, 15 November 2016 diff hist +3 m Help Article
- 12:05, 15 November 2016 diff hist +1 m Help Article →EPG Approval Process
- 10:25, 15 November 2016 diff hist -143 m 771.16 Penetrating Concrete Sealer - Silane →Materials: Per EPG, removed reference to archaic Penetrating Concrete Sealer JSP (which was a BSP)
- 09:55, 15 November 2016 diff hist +41 m 153.21 Traffic Per TR, updated link from TR’s sharepoint site for TR-32, Process for Renewal – Supplemental Signing Agreement
- 09:53, 15 November 2016 diff hist -1 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others
- 09:52, 15 November 2016 diff hist -9 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others
- 09:51, 15 November 2016 diff hist -322 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others: Per TR, replaced TR-15A link with link to CCO’s sharepoint site for TR-32, Supplemental Signing Agreement.
- 09:47, 15 November 2016 diff hist +178 m Category:903 Highway Signing Per TR, replaced TR 15A with a link from TR’s sharepoint site for TR-32, Process for Renewal – Supplemental Signing Agreement.
- 08:37, 15 November 2016 diff hist -576 m 153.21 Traffic Per Commissioner's Secr. deleted TR08-A since it is now TR3
- 16:02, 14 November 2016 diff hist -46 m 153.21 Traffic Per Commissioneer's Secr, removed two archaic agreements and added two new ones
- 14:55, 14 November 2016 diff hist 0 N File:Fig. 806.8.1 2016.docx current
- 14:54, 14 November 2016 diff hist 0 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Storm Water Compliance Coord'r, minor updated for Fig. 806.8.1 MoDOT/Contractor Responsibility
- 09:48, 14 November 2016 diff hist +34 m 236.3 Administration Per Env'l, updated RES link
- 09:46, 14 November 2016 diff hist +34 Category:101 Standard Forms →Environmental and Cultural: Per Env
- 09:44, 14 November 2016 diff hist +34 m Category:128 Conceptual Studies Per Env'l, updated RES link
- 09:35, 14 November 2016 diff hist +68 m 127.1 Request for Environmental Services Per Env'l, updated RES link
- 14:41, 10 November 2016 diff hist +209 m Main Page EPG 127
- 14:09, 10 November 2016 diff hist -788 127.9 Floodplain Management Per Env'l, updated to reflect new processes and forms
- 13:47, 10 November 2016 diff hist -14 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents updated links
- 13:45, 10 November 2016 diff hist 0 N File:127.11 SCS CPA.pdf
- 13:45, 10 November 2016 diff hist 0 N File:127.11 AD 1006.pdf
- 13:45, 10 November 2016 diff hist -30 m 127.11 Farmland Conversion updated links
- 12:14, 10 November 2016 diff hist -2,133 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties →127.21.2 Project Development Milestones: Per Env'l, updated to reflect new processes and forms current
- 12:02, 10 November 2016 diff hist 0 m 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties moved to 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties: Per Env'l, slightly re-titled the article
- 12:02, 10 November 2016 diff hist +87 N 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties moved to 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties: Per Env'l, slightly re-titled the article current
- 12:00, 10 November 2016 diff hist +6 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents updated link
- 11:59, 10 November 2016 diff hist +6 m Category:128 Conceptual Studies updated link
- 11:58, 10 November 2016 diff hist +574 127.11 Farmland Conversion Per Env'l, updated to reflect new processes and forms
- 11:00, 10 November 2016 diff hist -1,856 Category:1053 Concrete Sealer Per EPG, to conform with new Sec title current
- 10:53, 10 November 2016 diff hist +85 m Category:1000 MATERIALS retitled EPG 1053
- 10:52, 10 November 2016 diff hist +2,259 N Category:1053 Concrete Sealer and Concrete Crack Filler Per EPG, retitled EPG 1053 Concrete Sealer to this new title to conform with retitled sec
- 10:50, 10 November 2016 diff hist +52 m Where to Find Construction and Materials Functions updated link
- 10:06, 10 November 2016 diff hist -41 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) →Materials: Per MT and CM, added a materials specification for Concrete Crack Filler
- 10:05, 10 November 2016 diff hist 0 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler moved to 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP): Per MT and CM, re-titled article
- 10:05, 10 November 2016 diff hist +72 N 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler moved to 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP): Per MT and CM, re-titled article current
- 10:05, 10 November 2016 diff hist +1 m Category:170 Maintenance Activity Planning Guidelines
- 10:04, 10 November 2016 diff hist +1 m 770.1 District Routine Maintenance and Special Crew Responsibilities current
- 10:00, 10 November 2016 diff hist +10 m Category:170 Maintenance Activity Planning Guidelines updated link
- 09:58, 10 November 2016 diff hist +5 m 770.1 District Routine Maintenance and Special Crew Responsibilities updated link
- 09:57, 10 November 2016 diff hist -4 m 771.15 Concrete Bridge Deck Sealer Selection Matrix updated link
- 09:54, 10 November 2016 diff hist +32 771.16 Penetrating Concrete Sealer - Silane →Materials: Per MT and CM, added a materials specification for Concrete Crack Filler
- 09:33, 10 November 2016 diff hist +200 m Category:717 Neoprene and Silicone Joint Systems delted old article current
- 09:32, 10 November 2016 diff hist +65 m Category:700 STRUCTURES AND HYDRAULICS Re-titled EPG 717
- 09:31, 10 November 2016 diff hist +182 Nm Category:717 Flexible Joint Systems Per EPG, new article to conform with Sec 717's new title. No change in guidance from old EPG 717 Neoprene and Silcone Joint Systems current
- 15:18, 9 November 2016 diff hist -433 m 236.6 Appraisal and Appraisal Review updated 49 CFR 24.103 link
- 15:14, 9 November 2016 diff hist 0 N File:806.8 EC Pre Con.pdf current
- 15:13, 9 November 2016 diff hist 0 N File:806.8 SW Database and Checklist.pdf