User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:58, 22 November 2016 diff hist -2 m 771.2 Bridge Cleaning and Flushing
- 09:58, 22 November 2016 diff hist -2 m 771.3 Shaving Shoulder and Around Guardrail current
- 09:57, 22 November 2016 diff hist -2 m 771.4 Drain Basin Maintenance current
- 09:57, 22 November 2016 diff hist -2 m 771.5 Mat Gutter Maintenance current
- 09:57, 22 November 2016 diff hist -2 m 771.6 Channel Work - Gabion Installation current
- 09:56, 22 November 2016 diff hist -2 m 771.7 Channel Work - Rock Blanket current
- 09:56, 22 November 2016 diff hist -2 m 771.8 Remove Drift current
- 09:56, 22 November 2016 diff hist -2 m 771.9 Temporary Bridge Deck Repair
- 09:55, 22 November 2016 diff hist -2 m 771.10 Bridge Joint Sealing - Hot Pour current
- 09:55, 22 November 2016 diff hist -2 m 771.11 Bridge Joint Sealing - Silicone
- 09:54, 22 November 2016 diff hist -2 m 771.12 Bridge Joint Sealing - Polytite current
- 09:54, 22 November 2016 diff hist -2 m 771.13 Sealing Abutment and Pier Caps current
- 09:54, 22 November 2016 diff hist -2 m 771.14 Spot Painting of Bearings and Piling
- 09:53, 22 November 2016 diff hist -2 m 771.15 Concrete Bridge Deck Sealer Selection Matrix current
- 09:53, 22 November 2016 diff hist -2 m 771.16 Penetrating Concrete Sealer - Silane current
- 09:52, 22 November 2016 diff hist -2 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) current
- 09:52, 22 November 2016 diff hist -2 m 771.18 In-Deck Bridge Deck Crack Filler current
- 09:51, 22 November 2016 diff hist -2 m 771.19 Chip Seal to Entire Deck
- 09:50, 22 November 2016 diff hist -2 m 771.20 Cut and Spray Brush and Vines current
- 09:50, 22 November 2016 diff hist -2 m 771.21 Rainy Day Bridge Activities current
- 09:24, 22 November 2016 diff hist -290 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per BR, clarified hairpin guidance
- 09:17, 22 November 2016 diff hist 0 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details
- 09:16, 22 November 2016 diff hist +177 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per BR, hairpin guidance clarified
- 09:11, 22 November 2016 diff hist 0 N File:751.14.4.5.jpg current
- 09:09, 22 November 2016 diff hist -34 m 751.5 Structural Detailing Guidelines updated link
- 09:07, 22 November 2016 diff hist +12 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement
- 09:05, 22 November 2016 diff hist 0 N File:751.10.1.14 shape 10.jpg current
- 09:04, 22 November 2016 diff hist 0 N File:751.10.1.14 example.jpg current
- 09:04, 22 November 2016 diff hist 0 N File:751.10.1.14 part section.jpg current
- 09:04, 22 November 2016 diff hist +2,248 m 751.10 General Superstructure Per BR, expanded and clarified hairpin guidance especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel.
- 08:31, 22 November 2016 diff hist +28 m 751.5 Structural Detailing Guidelines updated link
- 16:14, 21 November 2016 diff hist +1 m Main Page
- 13:43, 21 November 2016 diff hist -94 m 751.5 Structural Detailing Guidelines →751.5.9.2.8.4 Notes: Per BR, further clarified revision from 7/10/14 about mechanical bar splices
- 13:42, 21 November 2016 diff hist +118 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per BR, further clarified revision from 7/10/14 about mechanical bar splices by updating MBS example figure
- 16:05, 18 November 2016 diff hist 0 m Main Page
- 14:17, 18 November 2016 diff hist 0 N File:751.5.9.2.8 example.pdf
- 14:17, 18 November 2016 diff hist -22 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Updated Mechanical Bar Splice Ex. figure
- 14:12, 18 November 2016 diff hist +147 m 751.6 General Quantities Per Bridge, clarified revision from 7/10/14 about mechanical bar splices.
- 14:10, 18 November 2016 diff hist -660 m 751.50 Standard Detailing Notes Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Note B1.9.7 removed.
- 11:23, 18 November 2016 diff hist 0 m 103.1 Bid Opening and Award Process Per DE, updated due dates chart link
- 11:21, 18 November 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines: Per DE, updated due dates chart link
- 08:54, 18 November 2016 diff hist 0 m Category:703 Concrete Masonry Construction →703.2.10 Cold Weather Placement: Per CM, revised to conform with the specs.
- 08:14, 18 November 2016 diff hist -172 m 236.4 Description Writing and Titles Per RW, removed archaic RW43, Request for Proposals - Title Company Services (Form 4-4.5b)
- 15:29, 17 November 2016 diff hist +178 LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 15:28, 17 November 2016 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 15:27, 17 November 2016 diff hist 0 N File:136.9.3 2016.docx
- 15:27, 17 November 2016 diff hist +7 m LPA:136.9 Plans, Specs and Estimates (PSE) Per EPG, updated Fig. 136.9.3 to reflect the current versions of specs and standard plans
- 09:22, 17 November 2016 diff hist 0 N File:134.2.4 Nov 17 2016.docx
- 09:21, 17 November 2016 diff hist +9 m Category:134 Engineering Professional Services Fig. 134.2.4, minor update
- 08:49, 17 November 2016 diff hist 0 N File:134.2.4 Nov 2016.docx