User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:48, 6 December 2016 diff hist -1,545 m 153.16 Maintenance Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 09:44, 6 December 2016 diff hist -171 m 153.15 Information Systems Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 09:42, 6 December 2016 diff hist 0 m 153.13 Highway Safety
- 09:41, 6 December 2016 diff hist -394 m 153.14 Human Resources Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 09:38, 6 December 2016 diff hist +142 m 153.13 Highway Safety Per Brandi Baldwin, readers are to go through eAgreements site to produce agreements.
- 09:36, 6 December 2016 diff hist -2,773 m 153.12 General Services Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 09:29, 6 December 2016 diff hist -2,905 m 153.11 Financial Services Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 09:18, 6 December 2016 diff hist -1,845 m 153.10 Design – Escrow Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 09:12, 6 December 2016 diff hist -3,601 m 153.9 Design Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 09:05, 6 December 2016 diff hist -356 m 153.8 Customer Relations Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 09:00, 6 December 2016 diff hist -2,343 m 153.7 Construction and Materials removed links
- 08:54, 6 December 2016 diff hist +143 m 153.7 Construction and Materials Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 14:45, 5 December 2016 diff hist -1,629 m 153.5 Bridge Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.
- 14:22, 5 December 2016 diff hist -213 m Main Page EPG 460.3.13
- 14:17, 5 December 2016 diff hist +132 460.3 Plant Inspection →460.3.13 Asphalt Binder Sampling: Per CM, submission of Initial Daily Binder Sample
- 12:08, 5 December 2016 diff hist +33 m 236.3 Administration
- 12:07, 5 December 2016 diff hist 0 N File:236.3.4.4 Advance Aquisition Certification.doc current
- 12:06, 5 December 2016 diff hist +100 m 236.3 Administration Per RW, added Advance Acquisition Certification
- 11:58, 5 December 2016 diff hist +45 m Main Page EPG 236.3.4.4
- 11:40, 5 December 2016 diff hist +2,869 m 236.3 Administration →236.3.4.4 Advance Acquisition - Hardship and Protective Buying: Per RW, added guidance and certification memo for Federally Funded Early ROW Acquisitions
- 11:21, 5 December 2016 diff hist -133 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, archaic QRG Digital Signature Frequently Asked Questions deleted.
- 11:14, 5 December 2016 diff hist 0 N File:616.13 WZ Impact Dec 2016.xlsm current
- 11:14, 5 December 2016 diff hist +12 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated MoDOT Work Zone Impact Analysis Spreadsheet
- 09:47, 5 December 2016 diff hist +88 m 147.3 Job Order Contracting (JOC) Per EPG, updated link
- 09:19, 5 December 2016 diff hist +234 m Main Page EPG 751.1, EPG 751.24
- 09:12, 5 December 2016 diff hist -50 751.24 Retaining Walls →751.24.2 Mechanically Stabilized Earth (MSE) Walls: Per BR, clarified form liner requirements for large block wall.
- 08:52, 5 December 2016 diff hist +774 751.1 Preliminary Design Per BR, clarified form liner requirements for large block wall.
- 08:39, 5 December 2016 diff hist +1,400 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: Per BR, clarified form liner requirements for large block wall.
- 15:48, 23 November 2016 diff hist 0 N File:123.1.1 Podi list 2016.xlsm
- 15:48, 23 November 2016 diff hist -437 m 237.9 Submission of Plans and Supporting Documents Per Bidding, updated PODI list
- 15:46, 23 November 2016 diff hist -428 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding, updated PODI list
- 15:43, 23 November 2016 diff hist -414 m Category:101 Standard Forms Per Bidding, updated D-12 link
- 15:42, 23 November 2016 diff hist -414 m 643.2 Local Utility Adjustments - Public and Private Per Bidding, updated D-12 link
- 15:41, 23 November 2016 diff hist 0 N File:237.9 D-12.docx
- 15:41, 23 November 2016 diff hist -828 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding, updated D-12 link
- 15:39, 23 November 2016 diff hist -828 m 237.9 Submission of Plans and Supporting Documents Per Bidding, updated D-12 link
- 10:53, 23 November 2016 diff hist -39 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, corrected (6) to remove a reference to avoiding angled hairpins for CIP decks
- 10:49, 23 November 2016 diff hist +29 m Main Page
- 09:09, 23 November 2016 diff hist -1 m 236.4 Description Writing and Titles →236.4.4.5 Agreements Between Commission and Abstractor or Title Companies: Per RW, provided clarification for Title Services Agreements
- 09:00, 23 November 2016 diff hist +1,009 m Category:142 Missouri One Call System Per Geotechnical, updated to fit current dig-rite rules, regulations and procedures
- 08:08, 23 November 2016 diff hist +35 m 127.1 Request for Environmental Services updated link
- 14:32, 22 November 2016 diff hist +2 m Main Page
- 14:31, 22 November 2016 diff hist -149 m Main Page EPG 751.50
- 14:28, 22 November 2016 diff hist +279 m 751.50 Standard Detailing Notes →J1. General: Per BR, clarified responsibility of MSE wall designer/manufacturer to show range of acceptable ɵ angle for slope excavation line on drawings to be consistent w/ design computations
- 13:58, 22 November 2016 diff hist -77 m Main Page EPG 751.10, EPG 751.22
- 13:29, 22 November 2016 diff hist -19 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP): updated link
- 11:21, 22 November 2016 diff hist +2,566 m 751.22 Prestressed Concrete I Girders Per BR, updated guidance for shear reinforcement to current practice and preferences of manufacturers and reinforcement suppliers. A1 reinforcement will not use WWR located in the flange of NU girders
- 10:05, 22 November 2016 diff hist -2 m Category:700 STRUCTURES AND HYDRAULICS
- 10:05, 22 November 2016 diff hist +2,215 Nm Category:771 Bridge Preventive Maintenance Guidelines Per BR, EPG 771's "Preventative" updated to "Preventive". EPG 771 was originally set up Dec 21, 2007. There were absolutely no changes to this page since 2007. current
- 09:58, 22 November 2016 diff hist -2 m 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)