User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:54, 6 March 2017 diff hist +3,579 m 751.1 Preliminary Design Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 15:03, 3 March 2017 diff hist -98 m 616.22 Advanced Work Zone Training Per CM and TS, removed references of training courses to coordinate with Sec 616
- 14:24, 3 March 2017 diff hist 0 m Main Page
- 15:43, 2 March 2017 diff hist -3 m 751.10 General Superstructure →751.10.4 Conduit Systems: minor correction
- 13:53, 2 March 2017 diff hist -3 m Main Page
- 14:39, 1 March 2017 diff hist 0 N File:1040.2 Guardrail Inspection Guide.docx current
- 14:38, 1 March 2017 diff hist 0 N File:1040.2 Guardrail Inspection.ppt current
- 14:38, 1 March 2017 diff hist +224 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material Per CM, added links to a PowerPoint, a guide document and checklist for guardrail inspection.
- 12:14, 1 March 2017 diff hist +80 m 751.10 General Superstructure →751.10.4 Conduit Systems: Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 12:11, 1 March 2017 diff hist +18 m 751.8 Concrete Box Culverts Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 12:10, 1 March 2017 diff hist +18 m 751.5 Structural Detailing Guidelines →751.5.9.2.7 Length Calculations: Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 14:30, 28 February 2017 diff hist +13 m 751.12 Barriers, Railings, Curbs and Fences →751.12.1.1 Standard Safety Barrier Curbs used in Missouri: Per BR, corrected TL level for the Type D Std Safety Barrier Curb
- 14:23, 28 February 2017 diff hist 0 N File:Main Page February 28, 2017.jpg current
- 14:22, 28 February 2017 diff hist +34 m Main Page
- 16:23, 27 February 2017 diff hist 0 N File:616.8.50 Feb 27 2017.pdf
- 16:23, 27 February 2017 diff hist +6 m 616.8 Typical Applications (MUTCD 6H) Per TS and CM, further clarification of TA 50
- 15:40, 27 February 2017 diff hist 0 m Main Page
- 14:26, 27 February 2017 diff hist +13 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.3 WORK ZONE NO PHONE ZONE Sign: Per TS and CM, clarification of placement of the WZ No Phone sign
- 14:22, 27 February 2017 diff hist 0 N File:616.8.50 Feb 2017.pdf current
- 14:22, 27 February 2017 diff hist +8 m 616.8 Typical Applications (MUTCD 6H) Per TS and CM, clarification of TA 50
- 13:06, 27 February 2017 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:08, 27 February 2017 diff hist +2 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:08, 27 February 2017 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:07, 27 February 2017 diff hist +28 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign: inserted link
- 11:06, 27 February 2017 diff hist +45 m 616.8 Typical Applications (MUTCD 6H) inserted link
- 08:14, 27 February 2017 diff hist +517 m Talk:231.1 Median Width current
- 08:13, 27 February 2017 diff hist +517 m Category talk:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches current
- 14:55, 24 February 2017 diff hist -121 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Project Signs: Per TS, further clarification to the revision from earlier this month
- 14:37, 24 February 2017 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.1 Types of Devices (MUTCD 6F.01)
- 14:05, 23 February 2017 diff hist -121 m Main Page EPG 821
- 13:40, 23 February 2017 diff hist 0 N File:821.25 krenite.jpg current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Vastlan General Information.doc current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Perspective General Information 2017.docx current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Plateau General Information 2017.doc current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Outrider General Information 2017.doc current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Milestone General Information 2017.docx current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Method.docx current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Krenite S General Information 2017.doc current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Escort XP General Information 2017.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 2,4-D General Information 2017.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 Total Vegetative Control Custom Mix.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 Basal Bark General Information 2017.doc current
- 13:36, 23 February 2017 diff hist 0 N File:821.25 Aquatic Glyphosate General Information 2017.doc current
- 13:36, 23 February 2017 diff hist +918 m 821.25 Products Per MT, new products with the new 2017 bid have replaced old products current
- 13:23, 23 February 2017 diff hist -196 m 821.23 Additives and Adjuvants Per MT, new products with the new 2017 bid have replaced old products current
- 11:36, 23 February 2017 diff hist -1 m 821.22 Weed Control in Landscaped Areas current
- 11:36, 23 February 2017 diff hist -709 m 821.22 Weed Control in Landscaped Areas Per MT, new products with the new 2017 bid have replaced old products
- 11:21, 23 February 2017 diff hist +57 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: Per TS and CM, updated LOGO tel number contact
- 10:43, 23 February 2017 diff hist +23 m 821.20 Woody Plant Control Per MT, new products with the new 2017 bid have replaced old products current
- 10:39, 23 February 2017 diff hist -11 m 821.19 Problem Weeds Per MT, new products with the new 2017 bid have replaced old products current