User contributions
Jump to navigation
Jump to search
- 08:45, 4 April 2017 diff hist +98 m 153.22 Transportation Planning Per TP and Commission, provided guidance for TP04
- 13:33, 3 April 2017 diff hist +48 m 237.5 Special Provisions →237.5.1 Job Special Provisions: updated link
- 13:32, 3 April 2017 diff hist -11 m 237.5 Special Provisions updated JSP link
- 12:53, 3 April 2017 diff hist +1 m Main Page
- 11:47, 30 March 2017 diff hist -53 m Category:101 Standard Forms →Checklist: Per LPA and CM, updated D-12 link
- 11:46, 30 March 2017 diff hist 0 N File:D-12 Form.docx current
- 11:45, 30 March 2017 diff hist -106 m 237.9 Submission of Plans and Supporting Documents Per LPA and CM, updated D-12 link
- 14:59, 29 March 2017 diff hist -13 m Category:747 Bridge Reports and Layouts Per BR, updated link
- 11:05, 29 March 2017 diff hist 0 m Main Page
- 10:45, 29 March 2017 diff hist -2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 10:43, 29 March 2017 diff hist -544 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, updated A1.3
- 10:36, 29 March 2017 diff hist 0 m 751.36 Driven Piles →751.36.2 Steel Pile
- 10:35, 29 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2.1 Sway Bracing
- 08:41, 29 March 2017 diff hist +418 m Main Page Figs. 616.6.87.1 and .2
- 08:39, 29 March 2017 diff hist -351 m 153.5 Bridge Per Commission, removed unused BR14
- 08:29, 29 March 2017 diff hist 0 N File:Fig 616.6.87.2 2017.jpg current
- 08:29, 29 March 2017 diff hist +10 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per CM, revised two location notes and the color of the rumbles in the legend to aid designers in completing temporary traffic control plans.
- 08:27, 29 March 2017 diff hist 0 N File:Fig 616.6.87.1 2017.jpg current
- 08:25, 29 March 2017 diff hist 0 N File:Fig 616.6.87.1 2017.pdf
- 15:38, 28 March 2017 diff hist +216 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 15:36, 28 March 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.3
- 15:35, 28 March 2017 diff hist 0 N File:136.9.3 2017.docx
- 15:35, 28 March 2017 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, amended Fig 136.3.9 to reflect changes made to EPG on Wage Rate. Deleted State Only Prevailing wage option in section 9.
- 12:32, 28 March 2017 diff hist -8 m 153.23 Utility updated links
- 12:25, 28 March 2017 diff hist +53 m 153.23 Utility updated links
- 12:18, 28 March 2017 diff hist -13 m 153.19 Multimodal Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan, Jenni Jones and Comm Secr, updated tables to relfect current contract listings
- 14:29, 27 March 2017 diff hist 0 N File:153.8 DE07 Instr 2017.pdf current
- 14:29, 27 March 2017 diff hist +5 m 153.9 Design
- 14:29, 27 March 2017 diff hist 0 N File:153.10 FS08 Instr 2017.pdf current
- 14:28, 27 March 2017 diff hist +5 m 153.11 Financial Services
- 13:46, 27 March 2017 diff hist +203 m Main Page E 153
- 09:40, 27 March 2017 diff hist -6 m 153.10 Design – Escrow
- 09:37, 27 March 2017 diff hist +18 m 153.10 Design – Escrow
- 09:37, 27 March 2017 diff hist +18 m 153.9 Design
- 09:36, 27 March 2017 diff hist +18 m 153.8 Customer Relations
- 09:35, 27 March 2017 diff hist +18 m 153.7 Construction and Materials
- 09:34, 27 March 2017 diff hist +6 m 153.5 Bridge
- 09:23, 27 March 2017 diff hist +351 m 153.5 Bridge Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:05, 27 March 2017 diff hist +222 m 153.7 Construction and Materials Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:51, 27 March 2017 diff hist +763 m 153.9 Design Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:19, 27 March 2017 diff hist -15 m 153.10 Design – Escrow Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:14, 27 March 2017 diff hist -470 m 153.11 Financial Services Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 12:34, 24 March 2017 diff hist +226 m 153.12 General Services Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 10:14, 24 March 2017 diff hist +371 m 153.13 Highway Safety Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 10:09, 24 March 2017 diff hist -329 m 153.14 Human Resources Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:56, 24 March 2017 diff hist -331 m 153.21 Traffic Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:53, 24 March 2017 diff hist +327 m 153.22 Transportation Planning Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:31, 24 March 2017 diff hist +355 m 153.23 Utility Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:11, 24 March 2017 diff hist -1 m 606.1 Guardrail minor correction
- 08:05, 24 March 2017 diff hist -375 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)