User contributions
Jump to navigation
Jump to search
- 12:39, 11 April 2017 diff hist 0 N File:751.22.3.10 part plan skewed.jpg current
- 12:38, 11 April 2017 diff hist -62 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per BR, clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders.
- 12:28, 11 April 2017 diff hist -35 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 12:27, 11 April 2017 diff hist +19 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 12:25, 11 April 2017 diff hist 0 N File:751.11.3.6 side 2017.jpg current
- 12:24, 11 April 2017 diff hist 0 N File:751.11.3.6 beam chair.jpg current
- 12:24, 11 April 2017 diff hist 0 N File:751.11.3.6 front elevation 2017.jpg current
- 12:24, 11 April 2017 diff hist +150 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs: Per BR, clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders.
- 12:22, 11 April 2017 diff hist +24 m 751.50 Standard Detailing Notes →G1. Concrete Bents
- 11:12, 11 April 2017 diff hist +3 m LPA:136.13 LPA Policy Changes
- 11:12, 11 April 2017 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:11, 11 April 2017 diff hist 0 N File:136.9.3 April 11 2017.docx
- 11:11, 11 April 2017 diff hist +21 m LPA:136.9 Plans, Specs and Estimates (PSE) Fig 136.9.3 further corrected
- 11:02, 11 April 2017 diff hist +18 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.3 WORK ZONE NO PHONE ZONE Sign: Per CM, minor clarification
- 10:57, 11 April 2017 diff hist +6 m LPA:136.13 LPA Policy Changes
- 10:56, 11 April 2017 diff hist +6 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 10:56, 11 April 2017 diff hist 0 N File:136.9.3 April 2017.docx
- 10:55, 11 April 2017 diff hist +42 m LPA:136.9 Plans, Specs and Estimates (PSE) minor correction for Fig. 136.9.3
- 13:22, 10 April 2017 diff hist +63 m Main Page EPG 750.7.3
- 12:53, 10 April 2017 diff hist +1 m 750.7 Non-Hydraulic Considerations →750.7.3.2 Hydraulic Requirements
- 12:46, 10 April 2017 diff hist 0 m 750.7 Non-Hydraulic Considerations →750.7.3.2 Hydraulic Requirements
- 12:45, 10 April 2017 diff hist 0 N File:750.7.3.2.jpg current
- 12:45, 10 April 2017 diff hist -539 m 750.7 Non-Hydraulic Considerations →750.7.3 Environmental Requirements: Per BR, updated with the new Corps of Engineers Regional Condition, which affects culvert design.
- 15:21, 7 April 2017 diff hist -2 m 620.3 Roundabout Markings (MUTCD Chapter 3C) →620.3.1 General (MUTCD Section 3C.1)
- 15:16, 7 April 2017 diff hist -4 m 748.2 Roadway Design Criteria →748.2.2.4 Replacement Structures
- 15:14, 7 April 2017 diff hist -2 m 104.13 Construction Inspection Guidance for Sec 104 →Concept Proposal
- 15:10, 7 April 2017 diff hist -2 m 751.22 Prestressed Concrete I Girders
- 15:08, 7 April 2017 diff hist -2 m Category:126 Location Study and Alternatives Analysis
- 15:07, 7 April 2017 diff hist -2 m Category:747 Bridge Reports and Layouts
- 15:05, 7 April 2017 diff hist -3 m 321.2 Geotechnical Guidelines →321.2.3.5 Practical Considerations
- 15:04, 7 April 2017 diff hist -6 m 751.38 Spread Footings
- 15:02, 7 April 2017 diff hist -8 m Category:806 Pollution, Erosion and Sediment Control
- 14:59, 7 April 2017 diff hist -4 m Category:105 Control of Work
- 14:50, 7 April 2017 diff hist -2 m Category:703 Concrete Masonry Construction →703.1.11.1 Form Construction
- 14:47, 7 April 2017 diff hist -4 m Category:123 Federal-Aid Highway Program
- 14:45, 7 April 2017 diff hist -4 m Category:1029 Fabricating Prestressed Concrete Members for Bridges
- 14:43, 7 April 2017 diff hist -4 m Category:239 Construction Inspection Guidelines for Final Plans →239.14 Roadway Cross-sections
- 14:42, 7 April 2017 diff hist -2 m Category:108 Prosecution and Progress →108.11 Termination of Contract for Convenience of the Commission
- 14:41, 7 April 2017 diff hist -2 m Category:774 Cathodic Protection →774.1.3 Design Guidelines
- 14:39, 7 April 2017 diff hist -2 m 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation →Commentary on EPG 321.3.5 Uncertainty Modifiers to Account for Quantity of Tests
- 14:37, 7 April 2017 diff hist -4 m 320.1 Preliminary Geotechnical Report (PGR)
- 14:35, 7 April 2017 diff hist -12 m 616.5 Flagger Control (MUTCD Chapter 6E)
- 14:33, 7 April 2017 diff hist -3 m 750.1 Open Channels →750.1.4.3.2 Step-Backwater Analysis
- 14:32, 7 April 2017 diff hist -2 m 147.1 Alternative Technical Concepts →147.1.2 Cons of ATCs
- 14:30, 7 April 2017 diff hist -6 m 910.3 Dynamic Message Signs (DMS)
- 14:28, 7 April 2017 diff hist -4 m Category:409 Seal Coat
- 14:26, 7 April 2017 diff hist -4 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation
- 14:25, 7 April 2017 diff hist -2 m Category:235 Preliminary Plans →235.8.1 Exemptions
- 14:23, 7 April 2017 diff hist -2 m 620.1 General (MUTCD Chapter 3A) →620.1.4.2 Contrast Marking
- 14:23, 7 April 2017 diff hist -3 m 620.12 Construction Inspection for Sec 620 →620.12.7.2 Construction Requirements (Sec 620.90.3)