User contributions
Jump to navigation
Jump to search
- 12:37, 12 May 2017 diff hist 0 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, increased the minimum offer of prompt offer of just compensation from $300 to $500
- 08:53, 12 May 2017 diff hist -1 m Main Page
- 08:19, 12 May 2017 diff hist 0 N File:616.13.7.1 2017.xlsx current
- 08:19, 12 May 2017 diff hist +10 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated Traffic Pacing Worksheet
- 09:46, 11 May 2017 diff hist -14 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.6.3 Work Zone Intelligent Transportation Systems (WZITS): updated jsp link
- 08:47, 10 May 2017 diff hist -13 m Main Page EPG 402 and EPG 409
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC MoDOT 2017.pdf current
- 08:30, 10 May 2017 diff hist 0 N File:402 CLC Contractor 2017.pdf current
- 08:29, 10 May 2017 diff hist +10 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the MoDOT/Contractor files were further updated
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat MoDOT.pdf current
- 07:33, 10 May 2017 diff hist 0 N File:409 Seal Coat Contractor.pdf
- 07:32, 10 May 2017 diff hist 0 File:409 FY2018 Contract Seal Coat Guidelines.docx uploaded a new version of "Image:409 FY2018 Contract Seal Coat Guidelines.docx" current
- 07:30, 10 May 2017 diff hist 0 N File:409 FY2018 Contract Seal Coat Guidelines.docx
- 07:30, 10 May 2017 diff hist -1,223 m Category:409 Seal Coat Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC MoDOT.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 CLC Contractor.pdf current
- 07:19, 10 May 2017 diff hist 0 N File:402 FY2018 Contract Leveling Coat Guidelines.docx current
- 07:19, 10 May 2017 diff hist -1,085 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 14:49, 5 May 2017 diff hist 0 m Main Page
- 14:33, 4 May 2017 diff hist +265 m 171.5 Drainage Added link to Culvert Pipe Replacement video
- 12:38, 3 May 2017 diff hist 0 m Main Page
- 09:02, 3 May 2017 diff hist -107 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.2 No-Passing Zone Pavement Markings and Warrants (MUTCD Section 3B.02): Per TR, removed an MUTCD clause since we do not use the NO PASSING ZONE sign on a statewide basis
- 08:12, 3 May 2017 diff hist +1,440 m 153.19 Multimodal Per MO, updated tables to relfect current contract listings
- 12:12, 2 May 2017 diff hist +302 m Category:101 Standard Forms →Construction and Materials: Per CM, added to links: 2017 Statewide Rail Cable Fence Spreadsheets (Grading and No Grading)
- 11:19, 2 May 2017 diff hist +8 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention: Per CM, dashes allowed
- 11:04, 1 May 2017 diff hist +61 m Main Page EPG 137
- 10:12, 1 May 2017 diff hist -1 m Category:137 Construction Inspection Guidance for Records to be Maintained
- 10:10, 1 May 2017 diff hist -18 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 10:09, 1 May 2017 diff hist 0 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 10:08, 1 May 2017 diff hist 0 N File:137.3 good 2017.jpg current
- 10:07, 1 May 2017 diff hist -4,885 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, updated terminology for storing project documents, which are now stored in eProjects rather than the CIA (V drive)
- 08:45, 1 May 2017 diff hist -1 m Main Page
- 15:27, 28 April 2017 diff hist -1 m Help Article →Division Contacts
- 14:20, 28 April 2017 diff hist -90 m 236.15 Requests from Cities for Annexations
- 14:20, 28 April 2017 diff hist -2,004 m 236.15 Requests from Cities for Annexations Per CCO, updated link to Voluntary Annexation Petition
- 12:34, 28 April 2017 diff hist 0 m Main Page
- 14:30, 27 April 2017 diff hist +179 m 751.8 Concrete Box Culverts →751.8.1.5 Precast Culvert: Per BR, minor clarification for precast box culvert pay item and quantity tabulations
- 12:11, 27 April 2017 diff hist +211 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 12:09, 27 April 2017 diff hist -59 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per LPA, removed archaic statement requiring MoDOT to approve subcontracts.
- 14:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 26 2017.doc current
- 14:50, 26 April 2017 diff hist +3 m Category:101 Standard Forms Per LPA, updated Fig. 134.2.2.5.1
- 14:49, 26 April 2017 diff hist +12 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.2.2.5.1
- 14:42, 26 April 2017 diff hist +37 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:34, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:33, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 10:50, 26 April 2017 diff hist +12 m Category:101 Standard Forms Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 2017.doc current
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.2 April 2017.docx current
- 10:49, 26 April 2017 diff hist +42 m Category:134 Engineering Professional Services Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:34, 26 April 2017 diff hist 0 N File:134.2.2.5.1 2017.doc current