User contributions
Jump to navigation
Jump to search
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2 2017.doc current
- 10:37, 8 June 2017 diff hist +6,789 m Category:134 Engineering Professional Services Per LPA, revised guidance for eAgreement (electronic vs wet signatures) workflow changes and to incorporate more-than-Taking Care of the System (TSCO) planning studies.
- 13:49, 7 June 2017 diff hist +13 m Main Page
- 13:31, 7 June 2017 diff hist -5 m Main Page EPG 903.15.3
- 12:13, 7 June 2017 diff hist +329 m 903.14 Memorial Signs →903.15.3 Heroes Way Interchange Program: Per TS, updated guidance to reflect current practice.
- 08:39, 7 June 2017 diff hist 0 N File:Main Page June 7, 2017.jpg current
- 08:39, 7 June 2017 diff hist -106 m Main Page
- 07:22, 7 June 2017 diff hist 0 N File:101 Workforce Pilot Program Employee Notification.pdf current
- 07:21, 7 June 2017 diff hist 0 N File:101 Sample Company Workforce Diversity Job Special Provision Action Plan.docx current
- 07:21, 7 June 2017 diff hist 0 N File:101 Contractor's Monthly New Employee Report.pdf current
- 07:21, 7 June 2017 diff hist -4 m Category:101 Standard Forms →External Civil Rights
- 07:20, 7 June 2017 diff hist +403 m Category:101 Standard Forms Three new forms from ECR
- 10:02, 6 June 2017 diff hist +296 m Category:900 TRAFFIC CONTROL
- 09:59, 6 June 2017 diff hist +300 m Category:1000 MATERIALS
- 09:57, 6 June 2017 diff hist +300 m Category:800 ROADSIDE DEVELOPMENT
- 09:54, 6 June 2017 diff hist +298 m Category:109 Measurement and Payment
- 09:53, 6 June 2017 diff hist +298 m Category:105 Control of Work
- 09:52, 6 June 2017 diff hist +301 m Category:101 Standard Forms
- 14:33, 5 June 2017 diff hist 0 m Main Page
- 09:27, 5 June 2017 diff hist -153 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): Per DE, updated language to current Agreements Review Group's process for reviewing DE10 and DE11
- 09:25, 5 June 2017 diff hist -346 m 153.9 Design Per DE, updated language to EPG 153.8 DE Table and EPG 235.2.3 to current Agreements Review Group process for reviewing DE10 and DE11.
- 13:06, 2 June 2017 diff hist -5 m LPA:136.4 Consultant Selection and Consultant Contract Management updated broken 23 CFR 172.3 link
- 12:21, 2 June 2017 diff hist +8 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group further clarified that Permitted Combination of Projects for lettings is no longer allowed.
- 08:25, 2 June 2017 diff hist +2 m Main Page EPG 103.1
- 08:23, 2 June 2017 diff hist -449 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group no longer allows Permitted Combination of Projects for lettings.
- 07:12, 2 June 2017 diff hist -7 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, updated link to MoDOT Workforce JSP Cumulative Workforce Hours Report
- 13:42, 1 June 2017 diff hist -51 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: updated link
- 13:20, 1 June 2017 diff hist +2 m Main Page
- 10:23, 1 June 2017 diff hist +8 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 10:44, 31 May 2017 diff hist +13 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, clarified Landscape Architects as "Professional Landscape Architects".
- 09:58, 31 May 2017 diff hist +4 m Category:101 Standard Forms →Construction and Materials
- 09:53, 31 May 2017 diff hist -466 m Category:108 Prosecution and Progress
- 09:51, 31 May 2017 diff hist +466 m Category:108 Prosecution and Progress Per CM, updated link to Final Acceptance Report (C-239)
- 09:45, 31 May 2017 diff hist +498 m Category:101 Standard Forms →Construction and Materials: Per CM, updated several links
- 15:09, 30 May 2017 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added link to Final Acceptance Report (C-239)
- 15:08, 30 May 2017 diff hist +62 m Category:108 Prosecution and Progress Per CM, added link to Final Acceptance Report (C-239)
- 13:28, 30 May 2017 diff hist 0 N File:108.16.2 Sample Final Inspection Letter 2017.pdf current
- 13:28, 30 May 2017 diff hist +5 m Category:108 Prosecution and Progress Per CM, updated Fig. 108.16.2, Sample Final Inspection letter, by adding a statement to remind contractors to upload any remaining QC documents.
- 12:55, 30 May 2017 diff hist +49 m Main Page EPG 101
- 12:30, 30 May 2017 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 11:31, 30 May 2017 diff hist +7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Envir'l, clarified Consent Decree Initial Set-Up QRG per no. of disturbed acres when adding a project to database as well as prerequisite dates for Insp.
- 14:29, 26 May 2017 diff hist -526 m Category:240 Maintenance and Emergency Crossovers
- 14:52, 25 May 2017 diff hist 0 m Main Page
- 13:33, 25 May 2017 diff hist +10 m Main Page
- 08:29, 24 May 2017 diff hist +29 m LPA:136.13 LPA Policy Changes
- 08:28, 24 May 2017 diff hist +94 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 N File:Fig.136.3.20 2017.docx
- 08:26, 24 May 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20, BEAP Project Tracking Form
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 3 May 22, 2017.jpg current