User contributions
Jump to navigation
Jump to search
- 11:28, 23 June 2017 diff hist -133 m Category:402 Bituminous Surface Leveling Per CM, removed archaic "Asphalt Cement Price Index Example Calculations"
- 11:26, 23 June 2017 diff hist -117 m Category:401 Bituminous Base and Pavement Per CM, removed archaic "Asphalt Cement Price Index Example Calculations"
- 10:59, 23 June 2017 diff hist +322 m Category:625 Slab Stabilization →625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing: Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:55, 23 June 2017 diff hist +369 m Category:409 Seal Coat Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:43, 23 June 2017 diff hist +163 m Category:402 Bituminous Surface Leveling →402.1 Design of Contract Leveling Course Projects: Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:40, 23 June 2017 diff hist +166 m Category:401 Bituminous Base and Pavement Per CM, added "Guidance for Asphalt Cement Price Index Adjustments".
- 10:38, 23 June 2017 diff hist -81 m Category:403 Asphaltic Concrete Pavement Per CM, deleted archaic "Asphalt Cement Price Adjustment (for Square Yard Items)".
- 10:36, 23 June 2017 diff hist -156 m 413.3 Ultrathin Bonded Asphalt Wearing Surface
- 10:36, 23 June 2017 diff hist -99 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per CM, deleted archaic "Asphalt Cement Price Adjustment (for Square Yard Items)".
- 08:08, 23 June 2017 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments.docx current
- 08:08, 23 June 2017 diff hist +305 m Category:403 Asphaltic Concrete Pavement Per CM, added "Guidance for Asphalt Cement Price Index Adjustments". Also moved Asphalt Cement Price Adjustment (for Square Yard Items) from EPG 413
- 15:26, 22 June 2017 diff hist -100 m Category:101 Standard Forms →Construction and Materials: Per CM, removed "UBAWS AC Membrane Adjustment" link since it was already replaced with other forms
- 10:27, 21 June 2017 diff hist -4 m Main Page
- 08:20, 21 June 2017 diff hist +176 m Main Page EPG 751.31, EPG 751.32
- 08:17, 21 June 2017 diff hist +26 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent
- 08:15, 21 June 2017 diff hist +29 m 751.31 Open Concrete Intermediate Bents
- 08:47, 20 June 2017 diff hist 0 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 08:45, 20 June 2017 diff hist +36 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 12:08, 19 June 2017 diff hist -16 m 153.9 Design
- 15:12, 16 June 2017 diff hist +314 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent: Per BR, clarified and corrected foundation data
- 15:05, 16 June 2017 diff hist 0 N File:751.31.3.1 Longitudinal Beam Steps.jpg current
- 15:04, 16 June 2017 diff hist +281 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap: BR, clarified reinforcement details for longitudinal beam step.
- 14:59, 16 June 2017 diff hist 0 N File:Main Page June 16, 2017.jpg current
- 14:58, 16 June 2017 diff hist +92 m Main Page
- 14:52, 16 June 2017 diff hist -8 m 751.6 General Quantities →751.6.2.17 Excavation
- 14:29, 16 June 2017 diff hist -3 m Main Page
- 14:27, 16 June 2017 diff hist +36 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:41, 16 June 2017 diff hist -5 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 12:33, 16 June 2017 diff hist +11 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:32, 16 June 2017 diff hist -66 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:30, 16 June 2017 diff hist +57 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:03, 16 June 2017 diff hist +125 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified and corrected foundation data
- 10:42, 16 June 2017 diff hist -33 m Main Page EPG 751.22.3.15
- 10:38, 16 June 2017 diff hist +222 m 751.9 Bridge Seismic Design Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 10:32, 16 June 2017 diff hist 0 m 751.9 Bridge Seismic Design
- 10:28, 16 June 2017 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods)
- 10:23, 16 June 2017 diff hist 0 N File:751.22.3.15.jpg current
- 10:22, 16 June 2017 diff hist -33 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods): Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 08:58, 16 June 2017 diff hist -9 m Main Page EPG 606.1
- 08:58, 16 June 2017 diff hist +32 m 606.1 Guardrail
- 08:50, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xlsx
- 08:49, 16 June 2017 diff hist +2 m 606.1 Guardrail
- 08:46, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xls
- 08:46, 16 June 2017 diff hist +547 m 606.1 Guardrail Per CADD, added Guardrail Length of Need Calculator
- 14:40, 15 June 2017 diff hist +65 m 153.9 Design Per LPA, updated some contract titles and a few other items
- 14:02, 15 June 2017 diff hist 0 N File:902.5.29 Flashing Yellow Arrow brochure.pdf current
- 14:02, 15 June 2017 diff hist -11 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.29 Guidelines for Use of the Flashing Yellow Left Arrow: Updated link
- 13:44, 15 June 2017 diff hist +210 m Main Page EPG 751.6.2.17, EPG 747.1.6.2
- 13:38, 15 June 2017 diff hist +425 751.50 Standard Detailing Notes →J. MSE Wall Notes (Notes for Bridge Standard Drawings): Per BR, new J1.30 notes the revision of Bridge standard drawings for MSE wall for excavation
- 13:34, 15 June 2017 diff hist +427 751.24 Retaining Walls →751.24.2.2 Details: Per BR, Cross-reference added for excavation and division responsibilities for preparing MSE wall plans, computing excavation class and quantities.