User contributions
Jump to navigation
Jump to search
- 13:13, 8 August 2017 diff hist +133 m Category:240 Maintenance and Emergency Crossovers Per TS, revised the standard for Emergency Vehicle Crossovers to 20' wide with 10' radius to allow fire/EMS responders to utilized the emergency crossovers.
- 14:59, 7 August 2017 diff hist -86 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per EPG, updated JSP links
- 14:40, 7 August 2017 diff hist 0 m Main Page
- 13:27, 7 August 2017 diff hist +4 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:26, 7 August 2017 diff hist +8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 13:26, 7 August 2017 diff hist +4 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:25, 7 August 2017 diff hist 0 N File:D-12 Aug 2017.docx current
- 13:25, 7 August 2017 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 11:19, 7 August 2017 diff hist -230 m Main Page
- 15:30, 4 August 2017 diff hist +59 m Category:610 Pavement Smoothness →610.7 Dispute Resolution (Sec 610.5.5)
- 15:26, 4 August 2017 diff hist +48 Category:610 Pavement Smoothness →610.7 Dispute Resolution (Sec 610.5.5)
- 15:22, 4 August 2017 diff hist +11 m Category:610 Pavement Smoothness →610.4 Smoothness Increments (Sec 610.4.1)
- 14:48, 4 August 2017 diff hist -31 m Category:600 INCIDENTAL CONSTRUCTION
- 14:46, 4 August 2017 diff hist +6 m Category:610 Pavement Smoothness →610.2 Inertial Profilers (Sec 610.2.1)
- 14:44, 4 August 2017 diff hist 0 m Category:610 Pavement Smoothness
- 14:41, 4 August 2017 diff hist 0 N File:610.7.jpg current
- 14:41, 4 August 2017 diff hist 0 N File:610.2 inertial profilers.jpg current
- 14:40, 4 August 2017 diff hist 0 N File:610.2.jpg current
- 14:40, 4 August 2017 diff hist 0 N File:610.2 rod and level.jpg current
- 14:39, 4 August 2017 diff hist 0 N File:610.1.jpg current
- 14:38, 4 August 2017 diff hist +313 Category:610 Pavement Smoothness Per CM, guidance for the new Sec 610
- 13:17, 4 August 2017 diff hist +10,224 N Category:610 Pavement Smoothness Per CM, new guidance for the new spec
- 11:04, 4 August 2017 diff hist -211 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per BR, deleted archaic note H10.84
- 08:04, 4 August 2017 diff hist -18 m Help Article →Division Contacts
- 08:04, 4 August 2017 diff hist -18 m Help Article →Division Contacts
- 08:52, 3 August 2017 diff hist +204 m 230.1 Horizontal Alignment →230.1.5 Spiral Transition Curves: Per DE, clarified spiral transition curves guidance and bring them into compliance with standard plans
- 08:42, 3 August 2017 diff hist -50 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per EPG, updated JSP links
- 09:17, 2 August 2017 diff hist 0 N File:237.9 MHTC Agenda Item Checklist 2017.docx
- 09:17, 2 August 2017 diff hist -10 m 237.9 Submission of Plans and Supporting Documents Per MHTC, updated MHTC Agenda Item Checklist
- 12:41, 1 August 2017 diff hist 0 N File:Main Page 2 Aug 1, 2017.jpg current
- 12:41, 1 August 2017 diff hist 0 N File:Main Page Aug 1, 2017.jpg current
- 12:41, 1 August 2017 diff hist +182 m Main Page
- 14:26, 31 July 2017 diff hist 0 N File:134.5.2 2017.docx
- 14:25, 31 July 2017 diff hist 0 m Category:134 Engineering Professional Services Per LPA, updated the fiscal years in the cost area of PSC Approval to Execute Supplemental Agreement, Fig. 134.5.2
- 11:33, 31 July 2017 diff hist +5 m Main Page
- 09:52, 31 July 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2017.xlsx
- 09:52, 31 July 2017 diff hist +10 m 606.1 Guardrail Per Charles Schumann (original creator of the G'rail LON Calculator), minor corrections to the spreadsheet.
- 10:42, 28 July 2017 diff hist +119 m Category:173 Erosion Control for Maintenance Operations Per MT, Per MT, clarification reflecting actual field activities was added at the request of FEMA
- 10:11, 28 July 2017 diff hist 0 N File:903.17.23 2017.jpg current
- 10:11, 28 July 2017 diff hist +3 m 903.16 Typical Signing Applications →Figure 903.17.23 Location of Yield and Lane Ends Sign for Acceleration Ramps: Per Traffic, fig corrected to be in compliance with written guidance
- 15:22, 25 July 2017 diff hist 0 m Main Page
- 15:06, 25 July 2017 diff hist +12 m Main Page EPG 751.50
- 14:57, 25 July 2017 diff hist +51 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, combined and revised notes H2c.1.10 and H2c.1.11 and revised note H2c1.38 to clarify the location of the coil tie being referenced.
- 08:40, 25 July 2017 diff hist 0 N File:D-12 2017.docx current
- 08:40, 25 July 2017 diff hist -53 m 643.2 Local Utility Adjustments - Public and Private Per EPG, minor update to D-12
- 08:39, 25 July 2017 diff hist 0 m 237.9 Submission of Plans and Supporting Documents Per EPG, minor update to D-12
- 08:38, 25 July 2017 diff hist 0 m Category:101 Standard Forms Per EPG, minor update to D-12
- 08:37, 25 July 2017 diff hist -106 m Category:124 Quality Control / Quality Assurance (QC/QA) Per EPG, minor update to D-12
- 12:48, 24 July 2017 diff hist -748 m Main Page
- 12:46, 24 July 2017 diff hist -24 m 643.1 Utilities - Status Letter →643.1.2 Utility Status: minor improvement