User contributions
Jump to navigation
Jump to search
- 13:55, 16 August 2017 diff hist 0 m Main Page
- 14:53, 15 August 2017 diff hist 0 m Main Page
- 12:20, 14 August 2017 diff hist +2 m 751.36 Driven Piles →751.36.2 Steel Pile
- 11:12, 14 August 2017 diff hist -2 m Category:Safe and Sound →General: Per TS, updated "Type III" barricade to "Type 3"
- 11:10, 14 August 2017 diff hist -6 m 616.18 Construction Inspection Guidelines for Sec 616 →For Sec. 616.3.2: Per TS, updated "Type III" barricade to "Type 3"
- 11:09, 14 August 2017 diff hist -6 m 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation Per TS, updated "Type III" barricade to "Type 3"
- 11:08, 14 August 2017 diff hist +34 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices
- 11:01, 14 August 2017 diff hist -6 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per TS, updated "Type III" barricade to "Type 3"
- 10:37, 14 August 2017 diff hist +153 m Main Page EPG 751.36.2
- 10:20, 14 August 2017 diff hist +2 751.50 Standard Detailing Notes →G7. HP Pile
- 10:20, 14 August 2017 diff hist +330 m 751.50 Standard Detailing Notes →G7. Steel HP Pile: Per BR, revised and added std detailing notes for the anchorage of pile for seismic jobs
- 10:04, 14 August 2017 diff hist +206 m 751.9 Bridge Seismic Design →751.9.3.1.7 T- Joint Connections: Per BR, added link to revised info about anchorage of pile for seismic jobs
- 09:54, 14 August 2017 diff hist +19 m 751.36 Driven Piles →751.36.2 Steel Pile
- 09:53, 14 August 2017 diff hist 0 N File:751.36.2.jpg current
- 09:52, 14 August 2017 diff hist +947 m 751.36 Driven Piles →751.36.2 Steel Pile: Per BR, revised the anchorage of pile for seismic jobs
- 08:39, 14 August 2017 diff hist +318 m Category:138 Project Development Chronology added 2017 map
- 07:38, 14 August 2017 diff hist 0 236.5 Property Management
- 14:46, 11 August 2017 diff hist -2 m Main Page
- 13:52, 11 August 2017 diff hist +296 m 236.15 Requests from Cities for Annexations Per RW, updated links to form 39
- 13:47, 11 August 2017 diff hist -1,128 m 236.11 Mediation Per RW, updated links to forms
- 12:49, 11 August 2017 diff hist -12,818 m 236.7 Negotiation Per RW, updated links to forms
- 11:29, 11 August 2017 diff hist -3,848 m 236.6 Appraisal and Appraisal Review updated links to forms
- 11:15, 11 August 2017 diff hist -363 m 236.5 Property Management
- 11:10, 11 August 2017 diff hist -158 m 236.5 Property Management
- 11:09, 11 August 2017 diff hist -8,484 m 236.5 Property Management updated links to forms
- 10:23, 11 August 2017 diff hist -5 m 236.4 Description Writing and Titles
- 10:08, 11 August 2017 diff hist -1,580 m 236.4 Description Writing and Titles Per RW, updated form links
- 10:57, 10 August 2017 diff hist -8 m Main Page EPG 625.1.2
- 10:55, 10 August 2017 diff hist +298 m Category:625 Slab Stabilization →625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing: Per CM, clarified measurement of liquid asphalt cement
- 09:27, 10 August 2017 diff hist -46 m Main Page EPG 760.1
- 09:23, 10 August 2017 diff hist +672 m Category:760 General Construction Inspection for Structures →760.1 Preparation For Inspection: Per CM and BR, clarified overhead work on bridges safety guidance
- 09:10, 10 August 2017 diff hist 0 m Category:950 Automated Traffic Enforcement
- 09:09, 10 August 2017 diff hist 0 m 907.3 Travel Safe Zones updated division's name
- 09:07, 10 August 2017 diff hist +8 m 907.1 Safety Program Guidelines
- 09:06, 10 August 2017 diff hist -1 m 907.1 Safety Program Guidelines →907.1.3 District Safety Plans and Project Reporting
- 09:05, 10 August 2017 diff hist +4 m 907.1 Safety Program Guidelines updated division's name
- 09:03, 10 August 2017 diff hist +100 m 153.21 Traffic Updated division's name
- 08:06, 10 August 2017 diff hist +1,609 m 237.11 Signing and Sealing Per CADD, moved slightly updated guidance from a link into the "Additional Information" box.
- 07:44, 10 August 2017 diff hist +15 m 237.11 Signing and Sealing updated archaic Design link
- 15:14, 9 August 2017 diff hist 0 m Main Page
- 13:40, 9 August 2017 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:40, 9 August 2017 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:39, 9 August 2017 diff hist 0 N File:D-12 Aug 9 2017.docx current
- 13:39, 9 August 2017 diff hist +4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:38, 9 August 2017 diff hist +2 m Category:101 Standard Forms →Design: Per Bidding and Est'g, further updated D-12
- 12:06, 9 August 2017 diff hist 0 N File:756 flow chart 2017.pdf current
- 12:06, 9 August 2017 diff hist +5 m Category:756 Seismic Design Per BR, minor updates to Bridge Seismic Design Process Flowchart
- 13:31, 8 August 2017 diff hist +34 m Main Page
- 13:30, 8 August 2017 diff hist +1 m Main Page
- 13:29, 8 August 2017 diff hist +44 m Main Page EPG 240