User contributions
Jump to navigation
Jump to search
- 14:40, 10 October 2017 diff hist +7 m Main Page EPG 237.13.2
- 14:38, 10 October 2017 diff hist -345 m 237.13 Contract Plan File Name Convention →237.13.2 Electronic Design Data: Per CADD, updated list of electronic design data files generated from GEOPAK for Roadway Contract Plans
- 12:35, 29 September 2017 diff hist +289 m Main Page EPG 751
- 08:09, 29 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.1.3 Boring Locations
- 08:08, 29 September 2017 diff hist 0 N File:751.5.2.1.1.3.jpg current
- 08:08, 29 September 2017 diff hist -3 m 751.5 Structural Detailing Guidelines →751.5.2.1.1.3 Boring Locations: Per BR, minor correction on boring location figure
- 15:09, 28 September 2017 diff hist -1 m 751.10 General Superstructure →751.10.1.10 Slab Offsets for Curved Bridges
- 15:07, 28 September 2017 diff hist 0 N File:751.10.1.10 2017.jpg current
- 15:06, 28 September 2017 diff hist -1 m 751.50 Standard Detailing Notes →B3c. Slabs on Steel, Concrete and Semi-Deep Abutment, and Reinforced Concrete Slab Overlays
- 15:06, 28 September 2017 diff hist +200 m 751.50 Standard Detailing Notes →B3c. Slabs on Steel, Concrete and Semi-Deep Abutment, and Reinforced Concrete Slab Overlays: Per BR, clarified how to estimate slab quantities when expansion joint systems are present.
- 15:02, 28 September 2017 diff hist +1,541 m 751.10 General Superstructure →751.10.1 Slab on Girder: Per BR, Clarified how to show and identify the end of slab in a plan of slab detail when expansion joint systems are located at the end bents
- 15:00, 28 September 2017 diff hist -1 m 751.6 General Quantities →751.6.2.10 Bridge Slabs
- 14:44, 28 September 2017 diff hist +306 m 751.6 General Quantities →751.6.2.10 Bridge Slabs: Per BR, clarified how to estimate slab quantities when expansion joint systems are present
- 14:42, 28 September 2017 diff hist +23 m 751.50 Standard Detailing Notes →B. Estimated Quantities Notes: inserted link
- 09:19, 28 September 2017 diff hist 0 N File:751.5.1.4 file names.pdf current
- 09:18, 28 September 2017 diff hist +177 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes
- 09:13, 28 September 2017 diff hist -415 m Main Page EPG 751.5.1.4
- 09:10, 28 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes
- 09:09, 28 September 2017 diff hist 0 N File:751.5.1.4 file names 2017.jpg current
- 09:09, 28 September 2017 diff hist +631 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per BR, clarified guidance for change orders to bridge plans
- 07:53, 28 September 2017 diff hist +572 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4)
- 07:49, 28 September 2017 diff hist -11 620.1 General (MUTCD Chapter 3A) →620.1.4 Materials (MUTCD Section 3A.04)
- 10:04, 27 September 2017 diff hist +6 m Category:101 Standard Forms →Construction and Materials
- 09:58, 27 September 2017 diff hist +9 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link
- 09:00, 27 September 2017 diff hist -413 m Main Page
- 08:54, 27 September 2017 diff hist +421 m Main Page EPG 616.14
- 08:37, 27 September 2017 diff hist +124 m 616.14 Work Zone Safety and Mobility Policy Per DE, updates regarding Work Zone Transportation Management Plan. Revised definition of "significant project" in E 616.14.8. Requirements for TCP revised in E 616.14.10.
- 07:16, 27 September 2017 diff hist -35 m 751.50 Standard Detailing Notes →B3. Estimated Quantities Tables: Per BR, minor removal of unnecessary instruction. Minor correction of terminology.
- 08:55, 26 September 2017 diff hist -156 m 238.3 Route Surveying
- 09:29, 22 September 2017 diff hist +2 m Main Page
- 11:22, 20 September 2017 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:21, 20 September 2017 diff hist +21 m LPA:136.9 Plans, Specs and Estimates (PSE)
- 11:20, 20 September 2017 diff hist 0 N File:136.9.3 Sept 20 2017.docx
- 11:20, 20 September 2017 diff hist +3 m LPA:136.13 LPA Policy Changes
- 11:17, 20 September 2017 diff hist +42 m LPA:136.13 LPA Policy Changes
- 11:17, 20 September 2017 diff hist +192 m LPA:136.13 LPA Policy Changes Fig 136.9.3
- 11:15, 20 September 2017 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.3
- 11:15, 20 September 2017 diff hist 0 N File:136.9.3 Sept 2017.docx
- 11:15, 20 September 2017 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per DE, updated the Subcontractor Disclosure in Fig. 136.9.3 to reflect the current section of the Missouri Standard Specification for Highway Construction.
- 10:54, 20 September 2017 diff hist +15 m 821.18 Noxious Weeds →Table 821.18.2 Musk, Canada and Scotch Thistle: Per MT, added "and Marijuana" to table title
- 13:55, 19 September 2017 diff hist 0 N File:Main Page Sep 19, 2017.jpg current
- 13:55, 19 September 2017 diff hist -68 Main Page EPG 236.5.19
- 13:31, 19 September 2017 diff hist +305 m 236.5 Property Management →236.5.19 Survey Requirements: Per RW, clarified who may prepare legal descriptions since SB828 enabled Title Companies and Legal Counsel to prepare legal descriptions
- 12:31, 19 September 2017 diff hist +26 m 751.50 Standard Detailing Notes →J1. General: added link
- 14:28, 18 September 2017 diff hist +158 m LPA:136.13 LPA Policy Changes
- 14:25, 18 September 2017 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1
- 14:25, 18 September 2017 diff hist 0 N File:136.3.1 Sept 2017.doc current
- 14:24, 18 September 2017 diff hist +30 m LPA:136.3 Federal Aid Basics Per LPA, clarified Fig. 136.3.1
- 11:16, 18 September 2017 diff hist -2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: minor correction, per BR
- 08:04, 18 September 2017 diff hist +118 m Main Page EPG 616.8