User contributions
Jump to navigation
Jump to search
- 15:37, 20 November 2017 diff hist +199 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions: Per Est and Review, updated file naming conventions
- 13:10, 20 November 2017 diff hist -103 m Category:153 Agreements and Contracts →153.1.6.2 eAgreements SharePoint Site Properties Page: Updated link
- 15:38, 17 November 2017 diff hist +73 m Main Page
- 14:47, 17 November 2017 diff hist 0 N File:Main Page Nov 17, 2017.jpg current
- 14:47, 17 November 2017 diff hist +84 m Main Page
- 13:13, 17 November 2017 diff hist 0 m 903.3 Ground-Mounted Sign Supports →Table 903.3.23 Incident Response Signing Plan: Per TS, corrected SCHOOL sign's priority to be "2" (not "3")
- 10:42, 14 November 2017 diff hist -377 m 750.3 Bridges →750.3.2.2.2 Bridge Survey: Per BR, omitted revision related to Nov 3, 2017 revision guidance for district submittal of request for valley section locations
- 09:55, 14 November 2017 diff hist +5 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, minor clarification
- 09:50, 14 November 2017 diff hist +2 m 237.9 Submission of Plans and Supporting Documents
- 15:52, 13 November 2017 diff hist +37 m Main Page
- 15:51, 13 November 2017 diff hist +49 m Main Page
- 15:23, 13 November 2017 diff hist 0 N File:Main Page Nov 13, 2017.jpg current
- 15:23, 13 November 2017 diff hist +43 m Main Page
- 14:44, 13 November 2017 diff hist +306 m LPA:136.13 LPA Policy Changes EPG 136.1.2.2
- 14:40, 13 November 2017 diff hist +1,383 m LPA:136.1 Introduction →136.1.2.2 Project Sponsor Eligibility: Per LPA, expanded guidance since FAST Act extended eligibility for some programs. KC, SL & S'fld MPOs asked us allow eligibility to nonprofits in their areas
- 11:05, 13 November 2017 diff hist -48 m Main Page
- 10:25, 13 November 2017 diff hist -2 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 10:22, 13 November 2017 diff hist +221 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2
- 10:21, 13 November 2017 diff hist +153 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 10:19, 13 November 2017 diff hist +170 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 10:15, 13 November 2017 diff hist -15 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing
- 10:13, 13 November 2017 diff hist -1 m 751.24 Retaining Walls →751.24.2.2 Excavation
- 09:26, 13 November 2017 diff hist -5 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, minor revision to Note A1.2 of E 751.50.
- 09:17, 13 November 2017 diff hist 0 N File:751.5.1.3.3 capitalization 2017.jpg current
- 09:15, 13 November 2017 diff hist +5 m 751.5 Structural Detailing Guidelines →751.5.1.3.3 Capitalization
- 09:14, 13 November 2017 diff hist 0 N File:751.5.1.3.3 capitalization.jpg current
- 09:13, 13 November 2017 diff hist +374 m 751.5 Structural Detailing Guidelines →751.5.1.3 Grammar and Punctuation: Per BR, updated capitalization rules and made minor additions to nomenclature
- 08:08, 13 November 2017 diff hist -13 m 642.10 Curb Ramp Applications
- 08:08, 13 November 2017 diff hist -13 m 642.10 Curb Ramp Applications
- 15:54, 9 November 2017 diff hist +108 m 236.7 Negotiation updated link
- 16:17, 8 November 2017 diff hist 0 N File:Main Page Nov 8, 2017.jpg current
- 16:16, 8 November 2017 diff hist -59 m Main Page
- 14:16, 8 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Joint System - Details
- 14:15, 8 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details
- 14:14, 8 November 2017 diff hist +15 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 14:11, 8 November 2017 diff hist +22 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 14:06, 8 November 2017 diff hist +8 m 751.13 Expansion Joint Systems →751.13.4.3 Strip Seal Expansion Joint System – Details
- 14:05, 8 November 2017 diff hist +71 m 751.13 Expansion Joint Systems →751.13.3.6 Drainage Details
- 14:04, 8 November 2017 diff hist -1 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2: minor correction
- 14:04, 8 November 2017 diff hist -2 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1: minor corrections
- 13:59, 8 November 2017 diff hist -25 m 236.1 General Information →236.1.3.3 Contract Procedures: Per RW, removed unecessary subtitle
- 16:08, 7 November 2017 diff hist 0 N File:236.7.3.3.1.docx current
- 16:08, 7 November 2017 diff hist -107 m 236.7 Negotiation Per RW, updated Form 236.7.3.3.1
- 15:25, 7 November 2017 diff hist +230 m 902.11 Traffic Control for Schools →902.11.3 School Signal at Driveway: Per TS, clarified where school signals will be allowed and how they should operate when schools or special events are not in session.
- 15:15, 7 November 2017 diff hist 0 153.21 Traffic updated link
- 11:45, 7 November 2017 diff hist -1 m 751.6 General Quantities Per BR, Tack Coat plan reporting accuracy revised from 10 gal. to 1 gal. to be in accord with standard specs and official bid item listing
- 09:26, 7 November 2017 diff hist +41 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution: Per DE, added "and please advise when we can give a NTP", per FS's request
- 15:43, 6 November 2017 diff hist +1 Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)
- 13:50, 6 November 2017 diff hist +145 m Main Page EPG 131.1
- 13:37, 6 November 2017 diff hist +48 m 131.1 Design Exception Process