User contributions
Jump to navigation
Jump to search
- 10:14, 15 December 2017 diff hist +449 m Help Article →EPG Ballot Cycles: Per EPS, ballot schedule table updated
- 13:04, 14 December 2017 diff hist +63 m 153.9 Design
- 12:15, 14 December 2017 diff hist -15 m 153.9 Design Per DE, removed redundant reference to DLEs
- 10:17, 14 December 2017 diff hist -132 m LPA:136.13 LPA Policy Changes
- 10:16, 14 December 2017 diff hist +315 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 10:13, 14 December 2017 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 10:12, 14 December 2017 diff hist 0 N File:Fig.136.3.20 Dec 2017.docx
- 10:12, 14 December 2017 diff hist +92 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20 and contact info
- 10:53, 13 December 2017 diff hist +159 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per BR, guidance updated with lap length revisions inadvertently not included in original submission
- 10:15, 13 December 2017 diff hist 0 N File:751.12.2.3 continuous 2 2017.jpg current
- 10:15, 13 December 2017 diff hist 0 N File:751.12.2.3 Non-integral 2 2017.jpg current
- 10:14, 13 December 2017 diff hist 0 N File:751.12.2.3 Integral 2 2017.jpg current
- 10:14, 13 December 2017 diff hist +431 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2 Safety Barrier Bridge Curbs (NJ Shape): Per BR, guidance updated with lap length revisions inadvertently not included in original submission
- 16:05, 12 December 2017 diff hist +2 m Category:1048 Pavement Marking Material Per TS, updated EPG labels of three documents
- 15:46, 12 December 2017 diff hist -121 m Other Aspects of Pavement Design →Thickness Determination: Per EPG, deleted most recent revision. Proposed revision to go into effect in April 2018.
- 15:02, 12 December 2017 diff hist +122 m Other Aspects of Pavement Design →Minor Roads: Per DE, clarification about pavement thicknesses/types sometimes not included on typical sections
- 13:21, 11 December 2017 diff hist +2 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, corrected pay item
- 13:13, 11 December 2017 diff hist -1 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings): Per BR, minor correction
- 09:55, 11 December 2017 diff hist +423 m 750.6 Erosion Control and Energy Dissipation →750.6.3.3 Rock Ditch Liner: Per BR, table from Sec 609.50 added for clarity/convenience to highway designers
- 09:38, 11 December 2017 diff hist +105 m 147.3 Job Order Contracting (JOC) Per EPG, updated JSP link
- 10:50, 6 December 2017 diff hist -37 m Category:108 Prosecution and Progress →108.7.3 Table for Contracts with Time Exclusion
- 15:46, 5 December 2017 diff hist -171 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced two forms (2017 Statewide Rail Cable Fence Spreadsheet - Grading and No Grading} with "2017 Statewide Rail Cable Fence Spreadsheet"
- 14:56, 5 December 2017 diff hist -2 m Category:101 Standard Forms →Bridge
- 14:55, 5 December 2017 diff hist -56 m Category:101 Standard Forms →Bridge: Per DE, updated Vertical Clearance Design Exception Coordination with SDDCTEA form
- 14:54, 5 December 2017 diff hist 0 N File:131.1.7 Vertical Clearance Design Exception Coordination with SDDCTEA.pdf current
- 14:54, 5 December 2017 diff hist -116 m 131.1 Design Exception Process Per DE, updated Vertical Clearance Design Exception Coordination with SDDCTEA form
- 14:42, 5 December 2017 diff hist +6 m 751.50 Standard Detailing Notes →G5a Closed Ended Cast-in Place (CECIP) Concrete Pile: Per BR, minor clarification
- 11:37, 5 December 2017 diff hist -27 m 131.1 Design Exception Process →131.1.7 Deficient Vertical Clearances on Interstates: removed archaic link
- 16:13, 4 December 2017 diff hist +2 m Main Page
- 08:55, 1 December 2017 diff hist +204 m 751.1 Preliminary Design →751.1.2.19.2 Content: Per BR, minor clarification
- 08:19, 1 December 2017 diff hist -1 m Category:101 Standard Forms Per DE, updated Fig. 134.2.2.2
- 08:18, 1 December 2017 diff hist 0 N File:134.2.2.2 Nov 2017.docx current
- 08:18, 1 December 2017 diff hist -4 m Category:134 Engineering Professional Services Per DE, updated Fig. 134.2.2.2
- 15:50, 30 November 2017 diff hist +78 m Category:101 Standard Forms →Design Forms: Form 806.8.2 Project-Specific SWPPP Info
- 15:47, 30 November 2017 diff hist 0 N File:Form 806.8.2.pdf current
- 15:47, 30 November 2017 diff hist -7 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per DE, updated Form 806.8.2 Project-Specific SWPPP Info
- 14:09, 30 November 2017 diff hist +1 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor clarification
- 13:17, 30 November 2017 diff hist +32 m LPA:136.3 Federal Aid Basics →136.3.15.2 Audit and Final Reimbursement: Per AI, further clarification
- 12:27, 30 November 2017 diff hist +230 m LPA:136.13 LPA Policy Changes EPG 136.3.15.2
- 12:25, 30 November 2017 diff hist -100 m LPA:136.3 Federal Aid Basics →136.3.15.2 Audit and Final Reimbursement: Per AI, removed sentence stating the LPAs must supply a copy of the final audit report to the MPOs.
- 15:49, 29 November 2017 diff hist -2 m 751.50 Standard Detailing Notes →H10a. Safety, Median, Type C & D: Per BR, revised lap lengths to coordinate with standard drawings
- 15:50, 28 November 2017 diff hist -10 m Category:108 Prosecution and Progress →108.7.1 Extensions or Adjustments of Time: minor correction
- 16:11, 21 November 2017 diff hist -6 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel
- 15:15, 21 November 2017 diff hist -7 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, further clarified Note H1.45
- 13:56, 21 November 2017 diff hist +40 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, in H1.51, reduced showing redundant deck thickness on plans since changing thickness on details can get missed.
- 13:46, 21 November 2017 diff hist -31 m 751.50 Standard Detailing Notes Per BR, minor clarifications
- 09:56, 21 November 2017 diff hist +3 m 237.11 Signing and Sealing Per CADD, minor clarifications
- 15:37, 20 November 2017 diff hist +199 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions: Per Est and Review, updated file naming conventions
- 13:10, 20 November 2017 diff hist -103 m Category:153 Agreements and Contracts →153.1.6.2 eAgreements SharePoint Site Properties Page: Updated link
- 15:38, 17 November 2017 diff hist +73 m Main Page