User contributions
Jump to navigation
Jump to search
- 10:28, 31 January 2018 diff hist +1 m Category:718 Temporary Bridge →718.1 Construction Inspection for Sec 718 current
- 16:07, 30 January 2018 diff hist 0 m 751.50 Standard Detailing Notes →B3a. Bridges
- 14:59, 30 January 2018 diff hist -9 751.50 Standard Detailing Notes →B3a. Bridges
- 14:57, 30 January 2018 diff hist +51 m 751.50 Standard Detailing Notes →B3a. Bridges: Per BR, updated Note B3.2
- 10:07, 30 January 2018 diff hist -1 m Category:101 Standard Forms
- 10:06, 30 January 2018 diff hist 0 N File:747 Bridge Survey Checklist 2018.doc current
- 10:06, 30 January 2018 diff hist -2 m Category:747 Bridge Reports and Layouts
- 11:03, 29 January 2018 diff hist +125 m Category:101 Standard Forms Per BR, updated Bridge Survey Checklist. Also added the Bridge Survey Location Request form to two Design locations
- 10:52, 29 January 2018 diff hist 0 N File:747 Bridge Survey Checklist 2018.docx current
- 10:52, 29 January 2018 diff hist -82 m Category:747 Bridge Reports and Layouts Per BR, updated Bridge Survey Checklist
- 15:57, 26 January 2018 diff hist -3 m 131.1 Design Exception Process →131.1.4 The Design Exception Process
- 14:30, 26 January 2018 diff hist -542 m Main Page EPG 131.1.4
- 14:14, 26 January 2018 diff hist +610 m 131.1 Design Exception Process →131.1.4 The Design Exception Process: Per DE, Design Exceptions to be stored electronically in eProjects after CO DE/BR have reviewed & approved. Guidance is now up-to-date with current practice
- 12:25, 26 January 2018 diff hist +16 m Category:132 Safety
- 12:23, 26 January 2018 diff hist +33 m Category:132 Safety updated links to various PPE guidance
- 12:16, 26 January 2018 diff hist -17 m Category:132 Safety Updated link to USDOT Emergency Response Guide
- 09:25, 26 January 2018 diff hist 0 N File:123.1.1 PoDI 2018.xlsx
- 09:24, 26 January 2018 diff hist -98 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per DE, updated PoDI list
- 15:03, 25 January 2018 diff hist +1 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: Per BR, updated link
- 14:58, 25 January 2018 diff hist -1 m 751.5 Structural Detailing Guidelines →751.5.4.5 Bridge Decks: Per BR, updated link
- 11:46, 25 January 2018 diff hist 0 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils current
- 11:46, 25 January 2018 diff hist 0 N File:106.3.2.40.jpg current
- 11:45, 25 January 2018 diff hist +2 m 106.3.2.40 TM-40, A One-Point Moisture-Density Relations Test for Soils Per CM, minor correction to figure.
- 11:37, 24 January 2018 diff hist +1 m LPA:136.2 Certification and Training
- 11:21, 24 January 2018 diff hist +166 m LPA:136.13 LPA Policy Changes EPG 136.2
- 11:18, 24 January 2018 diff hist +1 m LPA:136.2 Certification and Training
- 11:18, 24 January 2018 diff hist -67 m LPA:136.2 Certification and Training Per CM, updated the contact information for the Technician Certification Program
- 10:51, 24 January 2018 diff hist +181 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per CM, updated the 5th bullet pt. CCO requested that CM no longer submit hard copies of the new performance bond, but send them email links
- 08:14, 22 January 2018 diff hist +3 m 171.12 Maintenance Policy History →DRN(A4) Plastic Pipe
- 14:24, 19 January 2018 diff hist 0 m Category:702 Load-Bearing Piles →702.1.4.4 DFI Documents on Pile Driving and Hammers
- 14:20, 19 January 2018 diff hist 0 N File:103.1.6 Reviewers Checklist.docx current
- 14:19, 19 January 2018 diff hist -152 m 103.1 Bid Opening and Award Process Per Bidding and Est, replaced Reviewer's Checklist link with an uploaded form
- 11:30, 19 January 2018 diff hist -51 m LPA:136.13 LPA Policy Changes
- 11:24, 19 January 2018 diff hist -4 m LPA:136.13 LPA Policy Changes minor cosmetic update to Fig. 136.9.3
- 11:24, 19 January 2018 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links minor cosmetic update to Fig. 136.9.3
- 11:23, 19 January 2018 diff hist 0 N File:136.9.3 2018.docx
- 11:23, 19 January 2018 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) minor cosmetic update to Fig. 136.9.3
- 12:22, 18 January 2018 diff hist 0 N File:101 Floodplain Development Permit Application 2018.pdf current
- 12:22, 18 January 2018 diff hist -7 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” form with minor changes made at the request of SEMA.
- 11:54, 18 January 2018 diff hist +75 m Main Page EPG 106.3.2.87, EPG 402
- 10:31, 18 January 2018 diff hist +5 m 147.3 Job Order Contracting (JOC) Per EPS, updated Fence JOC link
- 09:53, 18 January 2018 diff hist +5 m Category:625 Slab Stabilization Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:409 Seal Coat Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:402 Bituminous Surface Leveling Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist +5 m Category:401 Bituminous Base and Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments 2018.docx current
- 09:51, 18 January 2018 diff hist +5 m Category:403 Asphaltic Concrete Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 08:56, 18 January 2018 diff hist +1,259 Nm 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats Per CM, new TM for determining no pick-up-time for tack coat
- 11:51, 17 January 2018 diff hist +160 m Main Page EPG 236.3
- 11:27, 17 January 2018 diff hist +1,311 m 236.3 Administration →236.3.4 Right of Way Acquisition Authority and Project Funding: Per RW, to align w/ CFR reg, updated RW activities that can be coded to the PE number prior to receiving FHWA's "A" date approval