User contributions
Jump to navigation
Jump to search
- 12:05, 23 March 2018 diff hist +5 m Category:101 Standard Forms →Bridge
- 12:04, 23 March 2018 diff hist -10 m Category:101 Standard Forms →Bridge: Per BR, updated Soil Properties Request Form
- 11:32, 23 March 2018 diff hist 0 N File:751.1.2.20 Request 2018.xlsx current
- 11:32, 23 March 2018 diff hist -10 m 751.1 Preliminary Design Per BR, updated Soil Properties Request Form
- 15:04, 22 March 2018 diff hist +15 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated link
- 11:33, 22 March 2018 diff hist +47 m Category:121 Project Planning, Prioritization and STIP Commitments
- 11:06, 22 March 2018 diff hist 0 N File:121 Planning Framework.docx current
- 11:05, 22 March 2018 diff hist +261 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, added document, "The Planning Framework for Transportation Decision Making"
- 09:08, 21 March 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Mar 2018.xlsx
- 09:08, 21 March 2018 diff hist +8 m 606.1 Guardrail Two minor revisions to the Guardrail Length of Need Calculator
- 15:16, 20 March 2018 diff hist +5 m Category:756 Seismic Design
- 15:12, 20 March 2018 diff hist -92 m Category:756 Seismic Design Per BR, clarified seismic information.
- 15:06, 20 March 2018 diff hist 0 N File:756 LRFD flowchart.pdf
- 14:52, 20 March 2018 diff hist +304 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, clarified seismic information.
- 14:47, 20 March 2018 diff hist +1,990 m 751.1 Preliminary Design Per BR, clarified seismic information.
- 11:17, 20 March 2018 diff hist +213 m 751.5 Structural Detailing Guidelines →751.5.9.2.2 Epoxy Coated Reinforcement Requirements: Per BR, clarified Feb 2017 policy expanding the use of epoxy coated reinforcement in bridge structures
- 10:53, 20 March 2018 diff hist +40 m Main Page EPG 103.1.6.6.1.2
- 10:50, 20 March 2018 diff hist +638 m 103.1 Bid Opening and Award Process →103.1.6.6.1.2 File Naming Convention for Plan Sheet Changes: Per Bidding and Contracts, updated guidance for ProjectWise
- 10:17, 16 March 2018 diff hist -13 m Main Page EPG 237.14
- 09:57, 16 March 2018 diff hist 0 N File:237.14.2.8.jpg current
- 09:57, 16 March 2018 diff hist +30,027 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, article completely rewritten
- 09:36, 16 March 2018 diff hist +1,087 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.3 Electronic Deliverables File: "Electronic Deliverables" used to be some of the files to be included. Now each file is named and collected in a ZIP file called "Electronic Deliverables"
- 13:47, 14 March 2018 diff hist +33 m 236.3 Administration Per RW, in EPG 236.3.5.2, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:39, 14 March 2018 diff hist -1 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation
- 13:39, 14 March 2018 diff hist +34 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation: Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:21, 14 March 2018 diff hist -9 m 238.2 Land Surveying Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 12:45, 14 March 2018 diff hist -30 m Category:Safe and Sound →Schedule: updated PS&E Due Date chart link
- 12:42, 14 March 2018 diff hist -44 m 237.9 Submission of Plans and Supporting Documents updated PS&E Due Date chart link
- 12:40, 14 March 2018 diff hist -42 m 103.1 Bid Opening and Award Process updated PS&E Due Date chart link
- 11:44, 9 March 2018 diff hist -62 m Main Page EPG 751.1.2.21
- 11:42, 9 March 2018 diff hist +410 m 751.1 Preliminary Design →751.1.2.21 Substructure Type: Per BR, min galvanized penetration guidance added for retaining wall piles supported on piles & bridge end bents on piles with embankments supported by MSE walls
- 16:12, 8 March 2018 diff hist 0 m 127.16 Wetland and Stream Mitigation
- 15:54, 8 March 2018 diff hist +125 m Main Page
- 15:32, 8 March 2018 diff hist -10 m Category:101 Standard Forms →Utility or Right of Way Related: Updated link to Permit for Work on Right of Way
- 14:52, 8 March 2018 diff hist +3 m Main Page
- 13:58, 8 March 2018 diff hist -6 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines
- 13:46, 8 March 2018 diff hist -103 m Category:101 Standard Forms Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 13:45, 8 March 2018 diff hist -110 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 12:39, 8 March 2018 diff hist +51 m Main Page EPG 612, EPG 616.8
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35d MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35c MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35b MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35a MT 2018.pdf current
- 12:09, 8 March 2018 diff hist 0 N File:616.8.35 MT 2018.pdf current
- 12:09, 8 March 2018 diff hist +25 m 616.8 Typical Applications (MUTCD 6H) Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use. TA 35 MT and TAs 35a-d MT
- 11:49, 8 March 2018 diff hist +228 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines: Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use.
- 16:27, 7 March 2018 diff hist -70 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 16:22, 7 March 2018 diff hist +49 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 16:14, 7 March 2018 diff hist +198 m 751.12 Barriers, Railings, Curbs and Fences →751.12.4 Chain Link Fence: Per BR, clarified wind load and dead load for chain link fence.
- 16:06, 5 March 2018 diff hist +766 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →Table 1040.2.1.1 List of Prequalified Guardrail Fabricators Brand Registration and Guarantee on File: Per CM, added manufacturer