User contributions
Jump to navigation
Jump to search
- 11:27, 27 March 2018 diff hist 0 N File:409 FY 2019 Seal Coat MoDOT.pdf current
- 11:26, 27 March 2018 diff hist 0 N File:409 FY 2019 Seal Coat Contractor.pdf current
- 11:26, 27 March 2018 diff hist +16 m Category:409 Seal Coat Per DE, the CLC and JSP packages were updated
- 11:23, 27 March 2018 diff hist 0 N File:402 CLC MoDOT 2018.pdf current
- 11:22, 27 March 2018 diff hist 0 N File:402 CLC Contractor 2018.pdf current
- 11:21, 27 March 2018 diff hist 0 N File:402 FY2019 Contract Leveling Coat Guidelines.docx current
- 11:19, 27 March 2018 diff hist +36 m Category:402 Bituminous Surface Leveling Per DE, the CLC and JSP packages were updated
- 08:41, 27 March 2018 diff hist +107 m 751.2 Loads →751.2.2 Transient Loads: Per BR, Wind Pressure on Vehicles, Braking force, and Centrifugal force are assumed to act horizontally at the roadway surface, per AASHTO agenda 2005
- 15:00, 26 March 2018 diff hist 0 N File:127.1 Instructions.doc
- 15:00, 26 March 2018 diff hist +3 m 127.1 Request for Environmental Services
- 14:59, 26 March 2018 diff hist -56 m 127.1 Request for Environmental Services Per Env'l, updated How to Complete the Request for Env'l Services (formerly "Instructions for the RES Form")
- 14:47, 26 March 2018 diff hist -1 LPA:136.13 LPA Policy Changes
- 14:46, 26 March 2018 diff hist +131 m LPA:136.13 LPA Policy Changes Fig. 136.6.4
- 14:45, 26 March 2018 diff hist +122 m LPA:136.12 Figures, Glossary and Other Useful Links Per Env'l, updated Fig. 136.6.4 How to Complete the Request for Env'l Review
- 14:42, 26 March 2018 diff hist 0 N File:136.6.4 instructions 2018.doc
- 14:42, 26 March 2018 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.4 How to Complete the Request for Env'l Review
- 12:56, 23 March 2018 diff hist 0 N File:823 Incarcerated Manual.pdf current
- 12:55, 23 March 2018 diff hist -96 m Category:823 Incarcerated Personnel Work Release Program Per MT, updated link to Incarcerated Personnel Work Release Program Manual current
- 12:08, 23 March 2018 diff hist 0 m 320.4 Procedure for Final Sounding Per BR, updated Soil Properties Request Form
- 12:06, 23 March 2018 diff hist 0 m 320.3 Drilling Operations Per BR, updated Soil Properties Request Form
- 12:05, 23 March 2018 diff hist +5 m Category:101 Standard Forms →Bridge
- 12:04, 23 March 2018 diff hist -10 m Category:101 Standard Forms →Bridge: Per BR, updated Soil Properties Request Form
- 11:32, 23 March 2018 diff hist 0 N File:751.1.2.20 Request 2018.xlsx current
- 11:32, 23 March 2018 diff hist -10 m 751.1 Preliminary Design Per BR, updated Soil Properties Request Form
- 15:04, 22 March 2018 diff hist +15 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated link
- 11:33, 22 March 2018 diff hist +47 m Category:121 Project Planning, Prioritization and STIP Commitments
- 11:06, 22 March 2018 diff hist 0 N File:121 Planning Framework.docx current
- 11:05, 22 March 2018 diff hist +261 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, added document, "The Planning Framework for Transportation Decision Making"
- 09:08, 21 March 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Mar 2018.xlsx
- 09:08, 21 March 2018 diff hist +8 m 606.1 Guardrail Two minor revisions to the Guardrail Length of Need Calculator
- 15:16, 20 March 2018 diff hist +5 m Category:756 Seismic Design
- 15:12, 20 March 2018 diff hist -92 m Category:756 Seismic Design Per BR, clarified seismic information.
- 15:06, 20 March 2018 diff hist 0 N File:756 LRFD flowchart.pdf
- 14:52, 20 March 2018 diff hist +304 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, clarified seismic information.
- 14:47, 20 March 2018 diff hist +1,990 m 751.1 Preliminary Design Per BR, clarified seismic information.
- 11:17, 20 March 2018 diff hist +213 m 751.5 Structural Detailing Guidelines →751.5.9.2.2 Epoxy Coated Reinforcement Requirements: Per BR, clarified Feb 2017 policy expanding the use of epoxy coated reinforcement in bridge structures
- 10:53, 20 March 2018 diff hist +40 m Main Page EPG 103.1.6.6.1.2
- 10:50, 20 March 2018 diff hist +638 m 103.1 Bid Opening and Award Process →103.1.6.6.1.2 File Naming Convention for Plan Sheet Changes: Per Bidding and Contracts, updated guidance for ProjectWise
- 10:17, 16 March 2018 diff hist -13 m Main Page EPG 237.14
- 09:57, 16 March 2018 diff hist 0 N File:237.14.2.8.jpg current
- 09:57, 16 March 2018 diff hist +30,027 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, article completely rewritten
- 09:36, 16 March 2018 diff hist +1,087 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.3 Electronic Deliverables File: "Electronic Deliverables" used to be some of the files to be included. Now each file is named and collected in a ZIP file called "Electronic Deliverables"
- 13:47, 14 March 2018 diff hist +33 m 236.3 Administration Per RW, in EPG 236.3.5.2, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:39, 14 March 2018 diff hist -1 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation
- 13:39, 14 March 2018 diff hist +34 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation: Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:21, 14 March 2018 diff hist -9 m 238.2 Land Surveying Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 12:45, 14 March 2018 diff hist -30 m Category:Safe and Sound →Schedule: updated PS&E Due Date chart link
- 12:42, 14 March 2018 diff hist -44 m 237.9 Submission of Plans and Supporting Documents updated PS&E Due Date chart link
- 12:40, 14 March 2018 diff hist -42 m 103.1 Bid Opening and Award Process updated PS&E Due Date chart link
- 11:44, 9 March 2018 diff hist -62 m Main Page EPG 751.1.2.21