User contributions
Jump to navigation
Jump to search
- 14:34, 6 April 2018 diff hist +739 m Main Page
- 12:28, 6 April 2018 diff hist +16 m 320.4 Procedure for Final Sounding Per BR, updated Request for Final Soundings for Structures Form
- 12:27, 6 April 2018 diff hist +8 m 320.3 Drilling Operations Per BR, updated Request for Final Soundings for Structures Form
- 12:25, 6 April 2018 diff hist 0 N File:751.1.2.19 Guidance 2018.xlsx
- 12:24, 6 April 2018 diff hist -2 m 751.1 Preliminary Design Per BR, updated Request for Final Soundings for Structures Form and Guidance for Request for Final Soundings of Structures
- 12:21, 6 April 2018 diff hist 0 N File:751.1.2.20 Request Apr 2018.xlsx current
- 12:20, 6 April 2018 diff hist +4 m Category:101 Standard Forms Per BR, updated Request for Final Soundings for Structures Form
- 13:29, 5 April 2018 diff hist -93 m Main Page EPG 110.2
- 13:26, 5 April 2018 diff hist +1 Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, revised the bulletin board inspection rate from every two months to every three months.
- 09:37, 5 April 2018 diff hist +101 m Main Page EPG 749.5
- 09:07, 5 April 2018 diff hist +2,610 Category:749 Hydrologic Analysis Per BR, revised Time of Concentration equation guidance by providing optional combination of Kirby-Hathaway & Kirpich equations and adding the optional low slope factor presented in the new research.
- 15:26, 4 April 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 15:19, 4 April 2018 diff hist +53 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms: Per CADD, minor revisions to glossary terms
- 15:10, 4 April 2018 diff hist +12 m Category:747 Bridge Reports and Layouts Per BR, Bridge Survey Report further edited
- 15:09, 4 April 2018 diff hist +6 m 238.3 Route Surveying
- 15:08, 4 April 2018 diff hist +6 m Category:101 Standard Forms
- 15:07, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report April 2018.docx current
- 15:07, 4 April 2018 diff hist +6 m Main Page
- 14:34, 4 April 2018 diff hist -311 m Main Page Bridge Survey Report
- 14:29, 4 April 2018 diff hist -41 m Category:101 Standard Forms →Bridge: Per BR, updated Bridge Survey Report
- 14:28, 4 April 2018 diff hist -42 m 238.3 Route Surveying Per BR, updated Bridge Survey Report
- 14:26, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report 2018.docx current
- 14:25, 4 April 2018 diff hist -78 m Category:747 Bridge Reports and Layouts Per BR, updated Bridge Survey Report
- 12:55, 4 April 2018 diff hist +7 m 127.29 Stormwater →127.29.7 Post-Construction Stormwater Management in New Development and Redevelopment
- 10:17, 4 April 2018 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition
- 08:43, 4 April 2018 diff hist -93 m 751.50 Standard Detailing Notes Per BR, several minor clarifications
- 08:15, 4 April 2018 diff hist 0 N File:751.50 E3.2 boring.jpg current
- 12:53, 3 April 2018 diff hist -163 m Main Page EPG 237.13.5
- 12:49, 3 April 2018 diff hist -62 m 237.13 Contract Plan File Name Convention →237.13.5 Example Set of Electronic Design Data: Per CADD, updated the chart with current examples
- 11:23, 3 April 2018 diff hist -3 m Category:756 Seismic Design
- 11:21, 3 April 2018 diff hist -3 m Category:756 Seismic Design
- 11:20, 3 April 2018 diff hist +46 m Category:756 Seismic Design
- 11:18, 3 April 2018 diff hist +64 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, minor clarification
- 10:36, 3 April 2018 diff hist 0 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 10:36, 3 April 2018 diff hist +353 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 10:18, 3 April 2018 diff hist +3 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 10:14, 3 April 2018 diff hist +68 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 10:00, 3 April 2018 diff hist +1 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 12:08, 2 April 2018 diff hist 0 N File:Main Page Apr 2, 2018.jpg current
- 12:08, 2 April 2018 diff hist -208 m Main Page EPG 236.5.16
- 10:45, 2 April 2018 diff hist +672 m 236.5 Property Management →236.5.16 Legal Opinion of Title: Per RW, clarified the legal title of opinion for excess property appraised for $25,000 or less that include any references to RW in the acquisition deed.
- 09:49, 2 April 2018 diff hist +292 m Main Page EPG 616.8, EPG 616.27
- 09:33, 2 April 2018 diff hist +24 m 616.27 MoDOT Fleet Lighting
- 09:22, 2 April 2018 diff hist 0 N File:616.8.35d MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35c MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35b MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35a MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35 MT Apr 2018.pdf current
- 09:20, 2 April 2018 diff hist +20 m 616.8 Typical Applications (MUTCD 6H) Per TS, clarified light bar policy in TA-35 and TAs 35a-d by adding "SEE NOTE".
- 09:07, 2 April 2018 diff hist +494 m 616.27 MoDOT Fleet Lighting TS, updated light bar guidance to bring in line with TAs