User contributions
Jump to navigation
Jump to search
- 13:10, 14 May 2018 diff hist -34 m Main Page EPG 153.8
- 13:02, 14 May 2018 diff hist +21 m 153.9 Design
- 08:49, 14 May 2018 diff hist +882 m 153.9 Design Per DE, modified the reviewer column for DE43, DE44, DE46-49
- 12:05, 11 May 2018 diff hist -267 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, removed the associated numbers from the posters
- 12:03, 11 May 2018 diff hist +15 m Main Page
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Vegetation Permit 2018.pdf current
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Reject Vegetation Cover 2018.pdf current
- 11:22, 11 May 2018 diff hist -252 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated two correspondence forms
- 11:05, 11 May 2018 diff hist -2 m Main Page
- 10:41, 11 May 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 10:39, 11 May 2018 diff hist +268 m Main Page EPG 110.2
- 10:30, 11 May 2018 diff hist +406 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, added three Federal Aid Projects posters
- 14:56, 10 May 2018 diff hist +22 m 751.14 Steel Superstructure →751.14.5.9 Weathering Steel
- 14:54, 10 May 2018 diff hist 0 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements
- 08:07, 10 May 2018 diff hist 0 N File:101 Floodplain Development Permit Application May 2018.pdf current
- 08:07, 10 May 2018 diff hist +4 m Category:101 Standard Forms Per BR, minor correction to Floodplain Development Permit Application
- 13:24, 9 May 2018 diff hist -1 m Category:110 State and Federal Wage Rates and Other Requirements
- 13:23, 9 May 2018 diff hist -1,251 m Main Page EPG 110.3.4
- 12:29, 9 May 2018 diff hist +920 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, new guidance about the DOL's PW-2 form agreed to by DOL
- 08:48, 9 May 2018 diff hist -34 m Main Page EPG 231.4
- 08:46, 9 May 2018 diff hist +421 m 231.4 Shoulder Width →231.4.1 Introduction: Per DE, revised guidance about guardrail placement from the edge of the shoulder to bring guidance in line with Std Plan 606.00.
- 12:38, 7 May 2018 diff hist 0 m Main Page
- 11:16, 7 May 2018 diff hist 0 N File:Main Page May 7, 2018.jpg current
- 11:16, 7 May 2018 diff hist -35 m Main Page
- 08:17, 4 May 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.5 Electronic Information for Bidder’s Automation: Per Bidding and Contracts, minor correction
- 07:25, 4 May 2018 diff hist 0 N File:910 TSMO.pdf current
- 07:24, 4 May 2018 diff hist +43 m Category:910 Intelligent Transportation Systems Per TS, added TSM&O info
- 15:22, 3 May 2018 diff hist -1 m 751.1 Preliminary Design →751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating
- 13:36, 3 May 2018 diff hist +34 m Main Page
- 13:33, 3 May 2018 diff hist 0 N File:Main Page Apr 3, 2018.gif current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3a, 2018.jpg current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3b, 2018.jpg current
- 13:32, 3 May 2018 diff hist +752 m Main Page
- 10:51, 3 May 2018 diff hist +179 m Main Page EPG 751.1.3.9
- 10:30, 3 May 2018 diff hist +2,950 m 751.1 Preliminary Design Per BR, new bridge preliminary design guidance for how to assess asbestos and lead considerations for structure removal, rehabs and recoatings and how to address these considerations on Bridge Memo
- 11:16, 2 May 2018 diff hist -355 m Main Page EPG 237.14.3.6
- 07:33, 2 May 2018 diff hist +810 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.6 Electronic Design Data for MoDOT Construction: Per CADD, clarified guidance
- 12:06, 1 May 2018 diff hist +152 m 238.3 Route Surveying →238.3.36.3.3 Field Notebooks: Per BR, corrected error
- 11:17, 1 May 2018 diff hist -1 m Main Page
- 09:21, 1 May 2018 diff hist +150 m Category:747 Bridge Reports and Layouts
- 13:45, 30 April 2018 diff hist 0 m 751.36 Driven Piles →751.36.3 Design Procedure: Per BR, minor correction
- 13:39, 30 April 2018 diff hist -238 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated links
- 09:10, 30 April 2018 diff hist +346 m Main Page EPG 236.16
- 09:04, 30 April 2018 diff hist -2,351 m 236.16 Outdoor Advertising Per Outdoor Advertising, several revisions due to Administrative Rule Revisions
- 08:30, 30 April 2018 diff hist -7 m Category:747 Bridge Reports and Layouts →747.2.2.4 GEO Files for Stream Crossings: Per CADD, minor updates
- 11:24, 27 April 2018 diff hist -149 Main Page
- 11:19, 27 April 2018 diff hist 0 N File:Main Page Apr 27, 2018.jpg current
- 11:18, 27 April 2018 diff hist -116 m Main Page
- 10:29, 27 April 2018 diff hist +99 m 102.2 Contractor Performance Rating System →102.2.7 Performance Discussion: Per CM, guidance for when certified mail is necessary for the Contractor Performance Rating replaced older guidance.
- 13:34, 26 April 2018 diff hist -643 m Main Page