- 10:53, 10 October 2018 diff hist 0 File:106.3.2.88.jpg Smithk uploaded a new version of File:106.3.2.88.jpg current
- 10:53, 10 October 2018 diff hist 0 N File:106.3.2.88.jpg
- 10:52, 10 October 2018 diff hist +3,175 N 106.3.2.88 TM-88 Bond Strength Test for Tack Coat Per CM, new article
- 10:46, 10 October 2018 diff hist 0 m 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats Smithk moved page 106.3.2.87, No-Pick-Up Time for Tack Coats to 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats current
- 10:46, 10 October 2018 diff hist +61 N 106.3.2.87, No-Pick-Up Time for Tack Coats Smithk moved page 106.3.2.87, No-Pick-Up Time for Tack Coats to 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats current
- 10:30, 10 October 2018 diff hist -78 m 642.10 Curb Ramp Applications updated links
- 10:29, 10 October 2018 diff hist -322 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria updated links
- 10:04, 10 October 2018 diff hist -7 m 616.16 Law Enforcement Services
- 09:59, 10 October 2018 diff hist -21 m 616.14 Work Zone Safety and Mobility Policy updated links
- 09:46, 10 October 2018 diff hist 0 N File:751.1.2.8.3.3.pdf current
- 09:46, 10 October 2018 diff hist +6 m 751.1 Preliminary Design →751.1.2.8.3.3 Roadway Fill
- 09:45, 10 October 2018 diff hist -39 m 751.1 Preliminary Design →751.1.2.8.3.3 Roadway Fill: uploaded former file
- 09:09, 10 October 2018 diff hist +157 m Main Page EPG 771.1
- 09:07, 10 October 2018 diff hist +88 m Category:503 Bridge Approach Slabs →503.6 Maintenance Activities: updated link
- 09:06, 10 October 2018 diff hist +5,068 m 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking) Per BR, re-titled EPG 771.1 Mud Jacking Bridge Approach. The requirement for the formed underseal access hole for the concrete bridge approach slabs has been eliminated. current
- 08:49, 10 October 2018 diff hist 0 m 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking) Smithk moved page 771.1 Mud Jacking Bridge Approach to 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking): Re-titled by Bridge
- 08:49, 10 October 2018 diff hist +86 N 771.1 Mud Jacking Bridge Approach Smithk moved page 771.1 Mud Jacking Bridge Approach to 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking): Re-titled by Bridge current
- 14:15, 9 October 2018 diff hist +9 m 751.1 Preliminary Design →751.1.3.4 Railing Type, Height and Guidelines for Curb Blockouts: Per BR, updated link
- 14:04, 9 October 2018 diff hist +68 m 751.40 LFD Widening and Repair →751.40.8.9.1.4 Slab Cross Section and Section Properties
- 12:34, 9 October 2018 diff hist -41 m 903.6 Warning Signs →903.6.3 Design of Warning Signs (MUTCD Section 2C.03): Per TS, correction of guidance previously copied directly from the MUTCD, but doesn’t reflect our direction. MoDOT reserves yellow green for schools only.
- 10:32, 9 October 2018 diff hist +89 m 236.16 Outdoor Advertising updated numerous links
- 09:51, 9 October 2018 diff hist -127 m 236.17 Junkyards updated numerous links
- 09:26, 9 October 2018 diff hist -1 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel: updated link
- 15:24, 28 September 2018 diff hist 0 File:Form C-239.pdf Smithk uploaded a new version of File:Form C-239.pdf current
- 15:23, 28 September 2018 diff hist 0 File:Form C 236.pdf Smithk uploaded a new version of File:Form C 236.pdf current
- 15:23, 28 September 2018 diff hist 0 File:Form 901.14.pdf Smithk uploaded a new version of File:Form 901.14.pdf current
- 15:21, 28 September 2018 diff hist 0 File:Form 901.14.3.pdf Smithk uploaded a new version of File:Form 901.14.3.pdf current
- 15:20, 28 September 2018 diff hist 0 File:Form 236.8.13.5.pdf Smithk uploaded a new version of File:Form 236.8.13.5.pdf current
- 15:19, 28 September 2018 diff hist 0 File:Form 236.8.12.5(a).pdf Smithk uploaded a new version of File:Form 236.8.12.5(a).pdf current
- 15:19, 28 September 2018 diff hist 0 File:Form 236.8.12.3(b).pdf Smithk uploaded a new version of File:Form 236.8.12.3(b).pdf current
- 15:18, 28 September 2018 diff hist 0 File:Form 236.8.12.3(b)(s).pdf Smithk uploaded a new version of File:Form 236.8.12.3(b)(s).pdf current
- 14:25, 28 September 2018 diff hist -78 m 646.1 Manholes current
- 14:22, 28 September 2018 diff hist -39 m 903.17 Delineation and Object Markers
- 14:20, 28 September 2018 diff hist -39 m 234.4 Single Point Urban Interchanges (SPUIs) →234.4.1.3 Ramp and Preliminary Plan Criteria
- 14:19, 28 September 2018 diff hist -39 m 234.2 Diamond Interchanges
- 14:16, 28 September 2018 diff hist -39 m 234.5 Cloverleaf Interchanges
- 14:14, 28 September 2018 diff hist -39 m 234.3 Directional Interchanges
- 13:56, 28 September 2018 diff hist -39 m 901.10 Preparation of Plans
- 13:55, 28 September 2018 diff hist -109 m 233.2 At-Grade Intersections with Stop and Yield Control
- 13:50, 28 September 2018 diff hist -39 m 606.2 Guard Cable
- 13:38, 28 September 2018 diff hist -36 m 606.1 Guardrail
- 13:29, 28 September 2018 diff hist -38 m Category:350 Design for Bases and Aggregate Surfaces current
- 13:26, 28 September 2018 diff hist -70 m Category:613 Pavement Repair
- 13:03, 28 September 2018 diff hist -117 m Category:240 Maintenance and Emergency Crossovers
- 13:00, 28 September 2018 diff hist -117 m 614.2 Material Inspection for Sec 614
- 12:56, 28 September 2018 diff hist -36 m Category:732 Flared End Sections
- 12:54, 28 September 2018 diff hist -117 m 1020.5 Corrugated Metal Pipe (CMP) Inspection Guide current
- 12:52, 28 September 2018 diff hist -39 m Category:706 Reinforcing Steel for Concrete Structures →706.1 Construction Inspection for Sec 706
- 12:50, 28 September 2018 diff hist -171 m Category:604 Miscellaneous Drainage
- 12:23, 28 September 2018 diff hist -78 m Category:1044 Posts for Markers and Delineators