User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:58, 26 October 2018 diff hist -12 m 233.4 At-Grade Intersections with Signal Control →233.4.5 Length of Auxiliary Lanes: minor revision
- 07:49, 26 October 2018 diff hist -39 m 233.4 At-Grade Intersections with Signal Control updated link
- 07:35, 26 October 2018 diff hist +2 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.6 Type 4: Directional Median Opening with Downstream U-Turns
- 07:34, 26 October 2018 diff hist -124 m 233.2 At-Grade Intersections with Stop and Yield Control
- 07:31, 26 October 2018 diff hist -1 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.3 Type 1: Median Opening Without Left Turn Lanes
- 07:30, 26 October 2018 diff hist +13 m 233.2 At-Grade Intersections with Stop and Yield Control updated links
- 15:23, 25 October 2018 diff hist +1 233.2 At-Grade Intersections with Stop and Yield Control →233.2.5 Type 3: Offset Left Turn Lanes
- 15:22, 25 October 2018 diff hist -39 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.4 Type 2: Median Opening with Left Turn Lanes
- 15:22, 25 October 2018 diff hist -39 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.3 Type 1: Median Opening Without Left Turn Lanes: updated link
- 15:19, 25 October 2018 diff hist -1 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.3 Type 1: Median Opening Without Left Turn Lanes
- 15:18, 25 October 2018 diff hist +2 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.3 Type 1: Median Opening Without Left Turn Lanes
- 15:15, 25 October 2018 diff hist -113 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.16 Stop and Yield Lines (MUTCD Section 3B.16): Per TS, deleted reference to archaic pay item
- 12:56, 25 October 2018 diff hist -64 m 751.22 Prestressed Concrete I Girders →751.22.3.9.1 Dimensions for Expansion Intermediate Bent with Continuous Slab: minor correction
- 12:41, 25 October 2018 diff hist +17 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, minor correction
- 12:37, 25 October 2018 diff hist +87 m 751.22 Prestressed Concrete I Girders →751.22.3.9 Open Intermediate Bent Diaphragms: minor correction
- 12:31, 25 October 2018 diff hist -76 m 751.22 Prestressed Concrete I Girders →751.22.3.9.3 Reinforcement Details for Type 2, 3, 4 and 6 Girders Using Expansion Intermediate Bent with Continuous Slab: minor correction
- 12:15, 25 October 2018 diff hist 0 File:R225 - Pothole Patching.pdf Smithk uploaded a new version of File:R225 - Pothole Patching.pdf current
- 12:14, 25 October 2018 diff hist 0 File:R225 - Fly Coating.pdf Smithk uploaded a new version of File:R225 - Fly Coating.pdf current
- 12:13, 25 October 2018 diff hist 0 File:R225 - Edge Ribbon.pdf Smithk uploaded a new version of File:R225 - Edge Ribbon.pdf current
- 12:12, 25 October 2018 diff hist 0 File:R225 - Chip Seal.pdf Smithk uploaded a new version of File:R225 - Chip Seal.pdf current
- 12:11, 25 October 2018 diff hist 0 File:R225 - Blade Patching.pdf Smithk uploaded a new version of File:R225 - Blade Patching.pdf current
- 11:27, 25 October 2018 diff hist 0 File:R31C - Chip Sealing - Scrub Seals.pdf Smithk uploaded a new version of File:R31C - Chip Sealing - Scrub Seals.pdf current
- 11:26, 25 October 2018 diff hist 0 File:R31C - Chip Sealing - Fine Aggregate.pdf Smithk uploaded a new version of File:R31C - Chip Sealing - Fine Aggregate.pdf current
- 11:25, 25 October 2018 diff hist 0 File:R31B - Sweeping.pdf Smithk uploaded a new version of File:R31B - Sweeping.pdf current
- 11:24, 25 October 2018 diff hist 0 File:R22E - Edge Rut.pdf Smithk uploaded a new version of File:R22E - Edge Rut.pdf current
- 08:44, 25 October 2018 diff hist 0 m Main Page EPG 703.2.8
- 08:39, 25 October 2018 diff hist 0 m Category:703 Concrete Masonry Construction →703.2.8 Concrete Placement
- 08:31, 25 October 2018 diff hist +2 m Category:703 Concrete Masonry Construction →703.2.8 Concrete Placement
- 08:30, 25 October 2018 diff hist 0 N File:703.2.8 Placing Diaphragm Concrete.pdf current
- 08:29, 25 October 2018 diff hist 0 m Category:703 Concrete Masonry Construction →703.2.8 Concrete Placement
- 08:20, 25 October 2018 diff hist -1 m Category:703 Concrete Masonry Construction →703.2.8 Concrete Placement
- 08:18, 25 October 2018 diff hist +294 m Category:703 Concrete Masonry Construction →703.2.8 Concrete Placement: Per CM, added a PowerPoint to explain MoDOT best practice for placing diaphragm concrete
- 07:02, 25 October 2018 diff hist +2 m 626.1 Edgeline Rumble Strips Per CM, minor clarification
- 12:12, 24 October 2018 diff hist 0 File:136.6 How to Document a Historic Bridge for Mitigation.pdf Smithk uploaded a new version of File:136.6 How to Document a Historic Bridge for Mitigation.pdf current
- 10:36, 24 October 2018 diff hist 0 N File:134.2.2.2.docx
- 10:35, 24 October 2018 diff hist -9 m Category:101 Standard Forms Minor update to Fig. 134.2.2.2, Submittal to Professional Services Committee
- 10:34, 24 October 2018 diff hist -36 m Category:134 Engineering Professional Services Minor update to Fig. 134.2.2.2, Solicitation and Request Letter
- 08:17, 24 October 2018 diff hist 0 N File:237.8 Production Rates 2017.xlsx current
- 08:17, 24 October 2018 diff hist +69 m 237.8 Contract Time Per EPG, added "2017 Production Rates"
- 07:51, 24 October 2018 diff hist 0 File:237.8 Contract Time Determination.pdf Smithk uploaded a new version of File:237.8 Contract Time Determination.pdf current
- 14:03, 23 October 2018 diff hist 0 751.6 General Quantities →751.6.1 Index of Quantities: Per CM, "High Early Strength'' renamed "Very Early Strength..."
- 13:46, 23 October 2018 diff hist +66 m Main Page EPG 626
- 13:42, 23 October 2018 diff hist -39 m 232.2 Passing Lanes →232.2.3 Passing Lane Design: updated link
- 13:36, 23 October 2018 diff hist -56 m 232.2 Passing Lanes updated links
- 13:33, 23 October 2018 diff hist +2,579 N 626.2 Centerline Rumble Strips Per CM, clarified the location of the rumbles strips and pavement markings for differing shoulder and pavement conditions. It also revised the minimum pavement thickness from 1 3/4" to 1".
- 13:33, 23 October 2018 diff hist +5,001 N 626.1 Edgeline Rumble Strips Per CM, clarified the location of the rumbles strips and pavement markings for differing shoulder and pavement conditions. It also revised the minimum pavement thickness from 1 3/4" to 1".
- 13:32, 23 October 2018 diff hist -5,180 Category:626 Rumble Strips Per CM, clarified the location of the rumbles strips and pavement markings for differing shoulder and pavement conditions. It also revised the minimum pavement thickness from 1 3/4" to 1".
- 13:27, 23 October 2018 diff hist +119 m Main Page EPG 106.3.2.7
- 13:25, 23 October 2018 diff hist +4,213 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs Per CM, new test method corresponding to spec change in Sec 613.10.2.4.3 that allows this alternate test method current
- 13:15, 23 October 2018 diff hist +388 m Main Page EPG 751.22