User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:55, 21 May 2019 diff hist +24 m Category:702 Load-Bearing Piles minor clarification
- 13:53, 21 May 2019 diff hist +297 m 751.36 Driven Piles minor clarifications
- 13:26, 21 May 2019 diff hist +1 m 751.36 Driven Piles →751.36.1.2 Probe Pile
- 12:36, 21 May 2019 diff hist -79 m Main Page EPG 237.6
- 12:25, 21 May 2019 diff hist 0 N File:Fig 237.6.docx current
- 12:25, 21 May 2019 diff hist -13 m 237.6 Project Estimates Per Bidding, updated "Costs for Non-Contractual Items" and added an invisible (white font) link for "noncontractual" so misspellers can locate non-contractual info.
- 09:44, 21 May 2019 diff hist +1 m Main Page
- 09:23, 21 May 2019 diff hist -31 m MediaWiki:Sidebar
- 09:22, 21 May 2019 diff hist +22 m MediaWiki:Sidebar
- 09:21, 21 May 2019 diff hist +12 m MediaWiki:Sidebar
- 09:18, 21 May 2019 diff hist +5 m Main Page
- 09:12, 21 May 2019 diff hist +275 m Main Page Per EPS, updated "welcome" and added mission banner
- 09:25, 20 May 2019 diff hist +5 m LPA:136.13 LPA Policy Changes
- 09:24, 20 May 2019 diff hist +752 m LPA:136.13 LPA Policy Changes EPG 136.6.4.5
- 09:22, 20 May 2019 diff hist +186 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per Env'l, updated Fig. 136.6.18 Threatened and Endangered Species Federal Aid Transportation Submittal Checklist, and added Fig. 136.19 August 2018 MoDOT USFWS Threatened and Endangered Species Habitats
- 08:58, 20 May 2019 diff hist +85 m 751.36 Driven Piles →751.36.5.4 Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction (kips), LRFD 10.7.3.6, 10.7.3.7, and AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS) 6.8
- 08:54, 20 May 2019 diff hist +74 m 751.36 Driven Piles →751.36.5.2 Structural Resistance Factor (ϕc and ϕf) for Strength Limit State, LRFD 6.5.4.2
- 08:51, 20 May 2019 diff hist +76 m 751.36 Driven Piles →751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn), LRFD Table 10.5.5.2.3-1
- 08:46, 20 May 2019 diff hist -16 m 751.36 Driven Piles →751.36.5.3 Geotechnical Resistance Factor ( \phi_{stat}) and Driving Resistance Factor ( \phi_{dyn}), LRFD Table 10.5.5.2.3-1
- 08:45, 20 May 2019 diff hist -84 m 751.36 Driven Piles →751.36.5.2 Structural Resistance Factor (\phi_c and \phi_f) for Strength Limit State, LRFD 6.5.4.2
- 08:10, 20 May 2019 diff hist 0 LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.3 Migratory Birds
- 08:05, 20 May 2019 diff hist 0 File:136.6.4.5.2.1.jpg Smithk uploaded a new version of File:136.6.4.5.2.1.jpg current
- 07:59, 20 May 2019 diff hist 0 N File:136.6.4.5.3.2.1.jpg current
- 07:58, 20 May 2019 diff hist 0 N File:136.6.4.5.3.2.jpg current
- 07:58, 20 May 2019 diff hist 0 N File:136.6.4.5.3.jpg current
- 07:57, 20 May 2019 diff hist +5 LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 07:55, 20 May 2019 diff hist 0 N File:136.6.4.5.2.1.jpg
- 07:53, 20 May 2019 diff hist 0 File:Fig. 136.6.18.pdf Smithk uploaded a new version of File:Fig. 136.6.18.pdf current
- 07:49, 20 May 2019 diff hist 0 N File:Fig. 136.6.19.pdf current
- 07:34, 20 May 2019 diff hist 0 N File:Fig. 136.6.18.pdf
- 07:29, 20 May 2019 diff hist +6,782 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, clarified T&E process and added new (but currently used) guidance about migratory birds
- 12:28, 17 May 2019 diff hist -1 m LPA:136.6 Environmental and Cultural Requirements
- 12:09, 17 May 2019 diff hist +166 m Main Page EPG 702, EPG 751.1.2, EPG 751.36
- 11:25, 17 May 2019 diff hist +348 m 751.3 Structural Steel Design Properties Per BR, clarified pile design procedure.
- 11:17, 17 May 2019 diff hist -183 m 751.50 Standard Detailing Notes →G5. CIP Concrete Piles (Notes for Bridge Standard Drawings): Per BR, clarified pile design procedure.
- 11:12, 17 May 2019 diff hist -207 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified pile design procedure.
- 11:08, 17 May 2019 diff hist +200 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, clarified pile design procedure.
- 10:47, 17 May 2019 diff hist 0 N File:751.36.4.1.jpg current
- 10:45, 17 May 2019 diff hist +24,952 m 751.36 Driven Piles Per BR, clarified pile design procedure.
- 10:42, 17 May 2019 diff hist +73 m 751.9 Bridge Seismic Design updated link
- 10:13, 17 May 2019 diff hist +10 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, clarified pile design procedure.
- 10:09, 17 May 2019 diff hist +229 m 751.1 Preliminary Design →751.1.2.32 Finishing Up Design Layout: Per BR, clarified pile design procedure.
- 10:07, 17 May 2019 diff hist +417 m 751.1 Preliminary Design →751.1.2.23 Types of Piling: Per BR, clarified pile design procedure.
- 09:27, 17 May 2019 diff hist +1,355 m Category:702 Load-Bearing Piles Per BR, clarified pile design procedure.
- 13:36, 16 May 2019 diff hist +1 m Category:138 Project Development Chronology
- 13:20, 14 May 2019 diff hist +229 m LPA:136.13 LPA Policy Changes EPG 136.6.4.3
- 13:18, 14 May 2019 diff hist +116 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.3 Section 404 Permits for Wetlands and Streams: Per Env'l, clarified guidance to attach to RER for documentation purposes.
- 09:29, 14 May 2019 diff hist -6 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity: minor correction
- 09:13, 14 May 2019 diff hist 0 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination →901.11.1 Iso-Footcandle Diagram: minor correction
- 13:17, 13 May 2019 diff hist -100 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination →901.11.1 Iso-Footcandle Diagram: Per TS, updated link to currently existing link