- 13:10, 29 May 2019 diff hist 0 File:751.36.1 Waterjeting.docx Smithk uploaded a new version of File:751.36.1 Waterjeting.docx current
- 13:02, 29 May 2019 diff hist -647 m 236.3 Administration →236.3.11.2 Affirmative Proof: Per RW, deleted archaic directions to access an affidavit
- 12:54, 29 May 2019 diff hist +1 m 236.3 Administration →236.3.11.2 Affirmative Proof
- 12:53, 29 May 2019 diff hist -18 m 236.3 Administration →236.3.10 Notice of Intent to Acquire: updated link
- 12:50, 29 May 2019 diff hist +15 m 236.3 Administration →236.3.7.3 Contents of Clearance Certification
- 12:48, 29 May 2019 diff hist -173 m 236.3 Administration →236.3.7.3 Contents of Clearance Certification: updated links
- 12:45, 29 May 2019 diff hist -247 m 236.3 Administration →236.3.6 Federal - Aid to Local Public Agency
- 12:36, 29 May 2019 diff hist +16 m 751.50 Standard Detailing Notes →G5. CIP Concrete Piles (Notes for Bridge Standard Drawings): Per BR, minor clarifications to standard detailing notes
- 12:15, 29 May 2019 diff hist +3 m 236.3 Administration →236.3.6.5 Determination of Local Agency’s Capabilities to Assist in the Acquisition of Right of Way
- 12:14, 29 May 2019 diff hist -19 m 236.3 Administration →236.3.6.1 General: updated link
- 12:06, 29 May 2019 diff hist -37 m Category:236 Right of Way updated link
- 11:14, 29 May 2019 diff hist -781 m 236.3 Administration →236.3.6 Federal - Aid to Local Public Agency: updated links
- 11:08, 29 May 2019 diff hist +99 m 236.3 Administration →236.3.4.10 Hardship and Protective Approval
- 11:05, 29 May 2019 diff hist -2 m 236.3 Administration →236.3.4.1 General
- 11:04, 29 May 2019 diff hist +78 m 236.3 Administration →236.3.3.3 Preparation of Right of Way Cost Estimate Forms
- 11:02, 29 May 2019 diff hist +55 m 236.3 Administration →236.3.2.2 Yearly Review of Program
- 11:02, 29 May 2019 diff hist -44 m 236.3 Administration →236.3.2.1 Programming
- 11:01, 29 May 2019 diff hist -32 m 236.3 Administration updated link
- 10:59, 29 May 2019 diff hist -16 m 236.3 Administration →236.3.1.1 Administration responsibilities: updated link
- 10:57, 29 May 2019 diff hist -299 m 236.3 Administration updated link
- 10:55, 29 May 2019 diff hist +8 m 236.2 Right of Way Organization and Personnel →236.2.4 Job Specifications: updated link
- 10:53, 29 May 2019 diff hist +14 m 236.2 Right of Way Organization and Personnel →236.2.2 Organization of the Right of Way Section: updated link
- 10:52, 29 May 2019 diff hist -6 m 236.2 Right of Way Organization and Personnel →236.2.1 Principle of Organization: updated link
- 10:49, 29 May 2019 diff hist +142 m 236.1 General Information →236.1.1.14 Personal Conduct: updated link
- 10:48, 29 May 2019 diff hist +154 m 236.1 General Information →236.1.1.13 Political Activities: updated link
- 10:40, 29 May 2019 diff hist -148 m Category:236 Right of Way updated links
- 10:32, 29 May 2019 diff hist -10 m Category:236 Right of Way
- 10:23, 29 May 2019 diff hist +50 m 236.14 Change in Route Status Report →236.14.5 Implementation of Approved Changes in Route Status: Updated Commission's Execution of Documents Policy link
- 13:50, 28 May 2019 diff hist +78 m Main Page
- 12:27, 28 May 2019 diff hist +151 m Main Page EPG 130, EPG 616.6.87, EPG 616.8
- 11:18, 28 May 2019 diff hist 0 N File:616.8.39 Sheet 1 DECM 2019.pdf current
- 11:18, 28 May 2019 diff hist 0 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials
- 11:12, 28 May 2019 diff hist 0 File:616.8.39 Sheet 2 DECM 2016.pdf Smithk uploaded a new version of File:616.8.39 Sheet 2 DECM 2016.pdf current
- 11:12, 28 May 2019 diff hist 0 File:616.8.39 Sheet 1 DECM 2016.pdf Smithk uploaded a new version of File:616.8.39 Sheet 1 DECM 2016.pdf current
- 10:57, 28 May 2019 diff hist 0 N File:Fig 616.6.87.2.2.pdf current
- 10:57, 28 May 2019 diff hist 0 N File:Fig 616.6.87.2.1.pdf current
- 10:56, 28 May 2019 diff hist +36 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway: Per TS, the spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness in Fig. 616.6.87.1 and Fig. 616.6.87.2.
- 10:51, 28 May 2019 diff hist 0 N File:Fig 616.6.87.1.2.pdf current
- 10:51, 28 May 2019 diff hist 0 N File:Fig 616.6.87.1.1.pdf current
- 10:50, 28 May 2019 diff hist +41 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations
- 10:38, 28 May 2019 diff hist 0 N File:Fig 616.6.87.1 2019.pdf current
- 10:37, 28 May 2019 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations: Per TS, the spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness in Fig. 616.6.87.1 and Fig. 616.6.87.2.
- 10:34, 28 May 2019 diff hist 0 File:Fig 616.6.87.1 2017.pdf Smithk uploaded a new version of File:Fig 616.6.87.1 2017.pdf current
- 10:11, 28 May 2019 diff hist 0 m 130.7 Value Engineering Team Leader Guide Smithk moved page 130.4 Value Engineering Team Leader Guide to 130.7 Value Engineering Team Leader Guide: re-numbered article current
- 10:11, 28 May 2019 diff hist +55 N 130.4 Value Engineering Team Leader Guide Smithk moved page 130.4 Value Engineering Team Leader Guide to 130.7 Value Engineering Team Leader Guide: re-numbered article current
- 10:10, 28 May 2019 diff hist +45 N 130.3 Project Manager’s Guide Smithk moved page 130.3 Project Manager’s Guide to 130.6 Project Manager’s Guide: re-numbered article current
- 10:10, 28 May 2019 diff hist 0 m 130.6 Project Manager’s Guide Smithk moved page 130.3 Project Manager’s Guide to 130.6 Project Manager’s Guide: re-numbered article current
- 10:10, 28 May 2019 diff hist 0 m Category:130 Value Engineering →130.3.2 PAVE Study Process
- 10:08, 28 May 2019 diff hist +563 Category:130 Value Engineering Per EPS, new guidance for Post-Award Value Engineering (PAVE) workshops, processes and project selections and reorganization of guidance.
- 15:14, 21 May 2019 diff hist +1 m 237.6 Project Estimates