User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:28, 4 September 2019 diff hist 0 m 237.13 Contract Plan File Name Convention →237.13.3 Bridge Contract Plans
- 13:39, 4 September 2019 diff hist -447 m 237.13 Contract Plan File Name Convention →237.13.3 Bridge Contract Plans: Per BR, moved EPG 237.13.3 to 751.5.1.4 Contract Plan File Name Convention and referenced EPG 751.5.1.4 from 237.13.3. The existing EPG 751.1.4 became new EPG 751.1.7.
- 13:35, 4 September 2019 diff hist +722 m 751.5 Structural Detailing Guidelines →751.5.1 General Detailing: Per BR, moved EPG 237.13.3 to 751.5.1.4 Contract Plan File Name Convention and referenced EPG 751.5.1.4 from 237.13.3. The existing EPG 751.1.4 became new EPG 751.1.7.
- 07:35, 4 September 2019 diff hist +18 m 751.50 Standard Detailing Notes Corrected format problem
- 12:34, 3 September 2019 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.5 Applying Engineer’s Seal to JSPs
- 09:26, 3 September 2019 diff hist +360 m 748.8 Development in Floodplains current
- 09:23, 3 September 2019 diff hist +360 m 127.9 Floodplain Management →127.9.3 Floodplain Development Permits
- 07:52, 3 September 2019 diff hist +1 127.9 Floodplain Management →127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification
- 07:51, 3 September 2019 diff hist +13 m 127.9 Floodplain Management →127.9.3.4 Completing a Floodplain Development Permit Application and “No-Rise” Certification
- 07:24, 3 September 2019 diff hist +1 m 237.6 Project Estimates →237.6.2.1 Bid History
- 15:19, 30 August 2019 diff hist -127 m 236.7 Negotiation Per RW, Property Owner Opinion Survey removed because it is no longer used.
- 15:11, 30 August 2019 diff hist +21 m Main Page EPG 103.1.8, EPG 104.7, EPG 121.7, EPG 237.6
- 15:04, 30 August 2019 diff hist -2,234 m 237.6 Project Estimates Per BCS and TP, estimate guidance was clarified to reflect current practice in estimating.
- 15:02, 30 August 2019 diff hist 0 m 237.6 Project Estimates Smithk moved page 237.6 Estimates to 237.6 Project Estimates: Per Bidding and TP
- 15:02, 30 August 2019 diff hist +37 N 237.6 Estimates Smithk moved page 237.6 Estimates to 237.6 Project Estimates: Per Bidding and TP current
- 14:56, 30 August 2019 diff hist 0 m 121.7 Program Estimates
- 14:51, 30 August 2019 diff hist +3,789 N 121.7 Program Estimates Per Bidding and TP, estimate guidance was clarified to reflect current practice in estimating. This new article is clarified info removed from EPG 104.7
- 14:18, 30 August 2019 diff hist 0 N File:Fig 104.7.docx
- 14:17, 30 August 2019 diff hist -3,430 m 104.7 Scoping Estimates Per Bidding and TP, estimate guidance was clarified to reflect current practice in estimating.
- 14:16, 30 August 2019 diff hist 0 m 104.7 Scoping Estimates Smithk moved page 104.7 Estimates to 104.7 Scoping Estimates: Per Bidding and TP
- 14:16, 30 August 2019 diff hist +37 N 104.7 Estimates Smithk moved page 104.7 Estimates to 104.7 Scoping Estimates: Per Bidding and TP current
- 14:16, 30 August 2019 diff hist 0 m Talk:104.7 Scoping Estimates Smithk moved page Talk:104.7 Estimates to Talk:104.7 Scoping Estimates: Per Bidding and TP current
- 14:16, 30 August 2019 diff hist +42 N Talk:104.7 Estimates Smithk moved page Talk:104.7 Estimates to Talk:104.7 Scoping Estimates: Per Bidding and TP current
- 14:15, 30 August 2019 diff hist -251 m 103.1 Bid Opening and Award Process →103.1.8 Engineer's Estimate: Per BCS and TP, estimate guidance was clarified to reflect current practice in estimating.
- 07:52, 30 August 2019 diff hist +12 m Where to Find PDM Information in the EPG updated link
- 11:09, 29 August 2019 diff hist +151 m Main Page EPG 127.9 and EPG 748.8
- 10:55, 29 August 2019 diff hist -96 m Main Page EPG 147.3.9
- 10:48, 29 August 2019 diff hist 0 N File:748.9 Floodplain.jpg current
- 10:47, 29 August 2019 diff hist +6,459 m 748.8 Development in Floodplains Per BR, guidance for determining the need for a Floodplain Development Permit contained contradictiong info and was clarified. EPG 748.8 re-titled "Development in Floodplains".
- 10:46, 29 August 2019 diff hist +46 N 748.8 National Flood Insurance Program (NFIP) Smithk moved page 748.8 National Flood Insurance Program (NFIP) to 748.8 Development in Floodplains: Per BR current
- 10:46, 29 August 2019 diff hist 0 m 748.8 Development in Floodplains Smithk moved page 748.8 National Flood Insurance Program (NFIP) to 748.8 Development in Floodplains: Per BR
- 10:40, 29 August 2019 diff hist 0 N File:127.9.3.1.jpg current
- 10:39, 29 August 2019 diff hist +2,769 m 127.9 Floodplain Management Per BR, guidance for determining the need for a Floodplain Development Permit contained contradictiong info and was clarified. EPG 127.9 re-titled "Floodplain Management".
- 10:37, 29 August 2019 diff hist 0 m 127.9 Floodplain Management Smithk moved page 127.9 Floodplain Management and the Regulatory Floodway to 127.9 Floodplain Management: Per BR
- 10:37, 29 August 2019 diff hist +41 N 127.9 Floodplain Management and the Regulatory Floodway Smithk moved page 127.9 Floodplain Management and the Regulatory Floodway to 127.9 Floodplain Management: Per BR current
- 10:37, 29 August 2019 diff hist 0 m Talk:127.9 Floodplain Management Smithk moved page Talk:127.9 Floodplain Management and the Regulatory Floodway to Talk:127.9 Floodplain Management: Per BR current
- 10:37, 29 August 2019 diff hist +46 N Talk:127.9 Floodplain Management and the Regulatory Floodway Smithk moved page Talk:127.9 Floodplain Management and the Regulatory Floodway to Talk:127.9 Floodplain Management: Per BR current
- 09:53, 29 August 2019 diff hist +36 m 147.3 Job Order Contracting (JOC) →147.3.9 Change Order Approvals
- 09:50, 29 August 2019 diff hist +149 m 147.3 Job Order Contracting (JOC) →147.3.9 Change Order Approvals: Per CM, minor clarification. A sentence to be used explaining the reason for the final change order has been added to the guidance.
- 14:00, 28 August 2019 diff hist +34 m Main Page EPG 134.5.3
- 13:58, 28 August 2019 diff hist +23 m Category:134 Engineering Professional Services In EPG 134.5.3, per LPA and ECR, added External Civil Rights to the notification list that currently includes DE and FS
- 12:30, 28 August 2019 diff hist +36 Category:101 Standard Forms →Bridge
- 14:44, 27 August 2019 diff hist 0 File:Digital Signature for Adobe Pro 10 (MoDOT).docx Smithk uploaded a new version of File:Digital Signature for Adobe Pro 10 (MoDOT).docx current
- 13:05, 27 August 2019 diff hist -40 m Main Page EPG 616.6.58
- 12:57, 27 August 2019 diff hist +320 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a) (MUTCD 6F.58): Per TS, provided guidance reflecting current practice for the two sized of the GO20-4a sign.
- 08:31, 27 August 2019 diff hist +4 m 907.7 Highway Safety Manual
- 08:29, 27 August 2019 diff hist 0 N File:907.7 2014.jpg current
- 08:29, 27 August 2019 diff hist 0 m 907.7 Highway Safety Manual →907.7.1 What is the Highway Safety Manual?
- 08:24, 27 August 2019 diff hist 0 N File:907.7 2019.jpg current
- 08:24, 27 August 2019 diff hist +5 m 907.7 Highway Safety Manual →907.7.1 What is the Highway Safety Manual?