User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:57, 30 October 2020 diff hist +465 m Recent Policy Changes in the EPG EPG 129 and EPG 127.14.3
- 12:49, 30 October 2020 diff hist +1,007 m Category:101 Standard Forms →Design: Per Env'l, several same forms about public hearings provided. New forms grouped with former "Hearing" forms under new "Public Involvement" heading
- 11:28, 30 October 2020 diff hist +1,186 127.14 National Environmental Policy Act (NEPA) Classification and Documents Per Env'l, updated Programmatic Categorical Exclusion (PCE) and “virtual” public involvement requirements to bring policy into compliance with the federal NEPA regulations.
- 11:16, 30 October 2020 diff hist 0 N File:129.6.4.jpg current
- 11:15, 30 October 2020 diff hist 0 N File:129.6.2.jpg current
- 11:15, 30 October 2020 diff hist 0 N File:129.6.jpg current
- 11:14, 30 October 2020 diff hist 0 N File:129.5.1.jpg
- 11:14, 30 October 2020 diff hist 0 N File:129.4.6.jpg current
- 11:14, 30 October 2020 diff hist 0 N File:129.4.3.jpg current
- 11:13, 30 October 2020 diff hist 0 N File:129.4.jpg current
- 11:13, 30 October 2020 diff hist 0 N File:129.1.jpg current
- 11:12, 30 October 2020 diff hist 0 N File:129.jpg current
- 11:09, 30 October 2020 diff hist +43,072 Category:129 Public Involvement Per Env'l, updated Programmatic Categorical Exclusion (PCE) and “virtual” public involvement requirements to bring policy into compliance with the federal NEPA regulations.
- 08:47, 30 October 2020 diff hist +1 m Recent Policy Changes in the EPG
- 08:47, 30 October 2020 diff hist +207 m Recent Policy Changes in the EPG EPG 751.1.2.22 and EPG 751.24.2.1
- 08:36, 30 October 2020 diff hist +696 m 751.24 Retaining Walls →751.24.2.1 Design: Per BR, guidance updated to clarify pile spacer embedment requirement when rock is anticipated within 5 ft and 10 ft zone below the MSE wall leveling pad.
- 08:27, 30 October 2020 diff hist +76 m 751.6 General Quantities →751.6.2.3 Pre-bore for Piling: Per BR, added link
- 08:24, 30 October 2020 diff hist +96 m 751.1 Preliminary Design →751.1.2.22 Types of Piling: Per BR, guidance updated to clarify pile spacer embedment requirement when rock is anticipated within 5 ft and 10 ft zone below the MSE wall leveling pad.
- 10:56, 29 October 2020 diff hist 0 N File:751.35.4.2.3 Oct 2020.jpg current
- 10:55, 29 October 2020 diff hist +4 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.2 Prestressed I-Girders, Bulb-Tee Girders and NU-Girders: Per BR, minor correction to Alternate Section A-A figure
- 07:24, 29 October 2020 diff hist +61 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: added link
- 13:48, 28 October 2020 diff hist +127 m Recent Policy Changes in the EPG EPG 612.2, EPG 612.3
- 13:38, 28 October 2020 diff hist +52 m Category:612 Impact Attenuators →612.3 Construction Inspection Guidelines
- 13:15, 28 October 2020 diff hist +531 m Category:612 Impact Attenuators Per EPS, update to clarify how the sand barrel impact attenuator arrays are paid for and used in work zones.
- 11:27, 28 October 2020 diff hist +281 m 751.14 Steel Superstructure →751.14.3.1 Field Bolted Splice Design: Per BR, added link to BR's online Structural Engineering Guidance for design of galvanized bolted connections.
- 08:23, 28 October 2020 diff hist +66 m Recent Policy Changes in the EPG EPG 134.2.4
- 08:07, 28 October 2020 diff hist -31 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, updated on-call consultant information
- 14:21, 27 October 2020 diff hist +5 751.5 Structural Detailing Guidelines →751.5.2.1.3.1 Structure Description: Per BR, clarified instructions for structure description on front sheet
- 13:55, 27 October 2020 diff hist +60 751.5 Structural Detailing Guidelines →751.5.2.1.3.1 Structure Description
- 12:34, 27 October 2020 diff hist +98 751.5 Structural Detailing Guidelines →751.5.2.1.3.1 Structure Description: Per BR, clarified instructions for structure description on front sheet
- 09:18, 27 October 2020 diff hist -3,136 m 903.15 Signing Agreements Per TS, numerous minor clarifications
- 09:17, 27 October 2020 diff hist 0 m 903.15 Signing Agreements Smithk moved page 903.16 Signing Agreements to 903.15 Signing Agreements: This article and subsequent EPG 903 articles (EPG 903.15 - EPG 903.24) were renumbered (became EPG 903.14 - 903.23) when TS deleted EPG 903.14 Emergency Management Signing.
- 09:17, 27 October 2020 diff hist +39 N 903.16 Signing Agreements Smithk moved page 903.16 Signing Agreements to 903.15 Signing Agreements: This article and subsequent EPG 903 articles (EPG 903.15 - EPG 903.24) were renumbered (became EPG 903.14 - 903.23) when TS deleted EPG 903.14 Emergency Management Signing. current Tag: New redirect
- 13:36, 26 October 2020 diff hist -154 m Recent Policy Changes in the EPG EPG 237.8.2
- 13:17, 26 October 2020 diff hist +273 m 237.8 Contract Time Per Bid & Contract, clarified guidance to include needed justification on higher LDs.
- 12:37, 26 October 2020 diff hist -1 m 147.2 Add Alternate Bidding Per Bidding, updated link current
- 09:18, 26 October 2020 diff hist -800 m 903.14 Memorial Signs Per TS, numerous minor clarifications
- 09:10, 26 October 2020 diff hist 0 m 903.14 Memorial Signs Smithk moved page 903.15 Memorial Signs to 903.14 Memorial Signs: This article and subsequent EPG 903 articles were renumbered when TS deleted EPG 903.14 Emergency Management Signing.)
- 09:10, 26 October 2020 diff hist +35 N 903.15 Memorial Signs Smithk moved page 903.15 Memorial Signs to 903.14 Memorial Signs: This article and subsequent EPG 903 articles were renumbered when TS deleted EPG 903.14 Emergency Management Signing.) current Tag: New redirect
- 08:59, 26 October 2020 diff hist -15,647 m 903.14 Emergency Management Signing Per TS, deleted this article. current Tag: Replaced
- 15:16, 23 October 2020 diff hist 0 N File:903.13 rustic.jpg current
- 15:16, 23 October 2020 diff hist 0 N File:D9-3a.jpg current
- 15:16, 23 October 2020 diff hist 0 N File:D9-3.jpg current
- 15:15, 23 October 2020 diff hist -11,952 m 903.13 State and Federal Recreation and Historic Site Signing Per TS, article updated to established practice. Significant re-write. current
- 15:12, 23 October 2020 diff hist -39 m 903.8 Freeway and Expressway Guide Signs →903.8.58 Supplemental Guide Signs for Lakes: updated link
- 15:10, 23 October 2020 diff hist 0 m 903.13 State and Federal Recreation and Historic Site Signing Smithk moved page 903.13 Recreational and Cultural Interest Area Signs to 903.13 State and Federal Recreation and Historic Site Signing: re-titled by TS
- 15:10, 23 October 2020 diff hist +75 N 903.13 Recreational and Cultural Interest Area Signs Smithk moved page 903.13 Recreational and Cultural Interest Area Signs to 903.13 State and Federal Recreation and Historic Site Signing: re-titled by TS current Tag: New redirect
- 14:46, 23 October 2020 diff hist -339 m 903.2 Extent of Signing →903.2.14 Symbols (MUTCD Section 2A.12): Per TS, deleted archaic support statement
- 14:28, 23 October 2020 diff hist +4,071 m Category:941 Permits and Access Requests Per TS, numerous minor clarifications
- 15:17, 22 October 2020 diff hist +27 m Recent Policy Changes in the EPG EPG 1048.2.7