User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:31, 13 November 2020 diff hist 0 m 903.2 Extent of Signing updated links
- 14:30, 13 November 2020 diff hist 0 m 903.7 Conventional Road Guide Signs updated links
- 14:29, 13 November 2020 diff hist +186 m 903.8 Freeway and Expressway Guide Signs updated links
- 14:19, 13 November 2020 diff hist 0 m 903.5 Regulatory Signs updated links
- 13:01, 13 November 2020 diff hist +5 m Category:108 Prosecution and Progress →108.7.1.1 Assessment of Liquidated Damages and Exceptions
- 12:20, 13 November 2020 diff hist +56 m Category:108 Prosecution and Progress Per CM, updated link
- 15:55, 12 November 2020 diff hist -9 m Category:501 Concrete →501.1.1 Material (Sec 501.2): Per CM, updated "Site Manger" to "AWP"
- 15:54, 12 November 2020 diff hist +26 m 321.2 Geotechnical Guidelines →321.2.4.4 Light Towers: Per CM, updated "Site Manger" to "AWP"
- 15:52, 12 November 2020 diff hist -9 m Category:1015 Bituminous Material Per CM, updated "Site Manger" to "AWP"
- 15:52, 12 November 2020 diff hist -9 m Category:1019 Cement →1019.5.2 Procedure: Per CM, updated "Site Manger" to "AWP"
- 15:32, 12 November 2020 diff hist -27 m 147.3 Job Order Contracting (JOC) Per CM, updated Site Manager to AWP
- 14:40, 12 November 2020 diff hist +23 m Recent Policy Changes in the EPG EPG 147.3.6
- 14:23, 12 November 2020 diff hist +59 m 147.3 Job Order Contracting (JOC) →147.3.6 Closing JOC Contracts: Per CM, clarification that materials summary is not needed for Job Order Contracts
- 13:43, 12 November 2020 diff hist +1 m 626.4 Transverse Rumble Strips Per TS, minor clarification current
- 13:23, 12 November 2020 diff hist -9 m 626.3 Construction Inspection Guidelines for Sec 626 Per TS, minor clarification
- 13:11, 12 November 2020 diff hist -21 m 626.2 Centerline Rumble Strips Per TS, minor clarificaiton
- 12:23, 12 November 2020 diff hist +136 m 626.1 Edgeline Rumble Strips Per TS, minor clarifications
- 12:01, 12 November 2020 diff hist +23 m Category:626 Rumble Strips Per TS, minor clarifications
- 09:16, 12 November 2020 diff hist +139 m Recent Policy Changes in the EPG EPG 751.1.2.2 and EPG 751.12.1.2.1
- 09:05, 12 November 2020 diff hist +307 m 751.12 Barriers, Railings, Curbs and Fences →751.12.1.2.1 Slip Forming: Per BR, replaced guidance about determining C bars lengths with actual length of C bars.
- 08:59, 12 November 2020 diff hist +181 m 751.1 Preliminary Design →751.1.2.2 Wing Lengths: Per BR, added guidance to consider making short turned-back wings sufficiently long so that the Type D barrier end section does not require extensive modification
- 10:09, 10 November 2020 diff hist +104 m Recent Policy Changes in the EPG EPG 616.8
- 10:02, 10 November 2020 diff hist 0 N File:616.8.10 interim.pdf current
- 10:02, 10 November 2020 diff hist +373 m 616.8 Typical Applications (MUTCD 6H) Per TS, interim guidance available for TMA flagger
- 16:25, 9 November 2020 diff hist +40 m Recent Policy Changes in the EPG EPG 751.5
- 15:54, 9 November 2020 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.1.3.2 Symbols
- 15:53, 9 November 2020 diff hist 0 N File:751.5.1.3.2 s.jpg current
- 15:51, 9 November 2020 diff hist +3,249 m 751.5 Structural Detailing Guidelines Per BR, added guidance standardizing the format for reinforcing callouts
- 11:00, 9 November 2020 diff hist -339 m Recent Policy Changes in the EPG EPG 121.3
- 10:59, 9 November 2020 diff hist +420 m 121.3 The Statewide Transportation Improvement Program (STIP) Per TP, STIP information and the annual process to update the STIP were updated to current practice. current
- 12:14, 5 November 2020 diff hist -420 m 121.3 The Statewide Transportation Improvement Program (STIP) Per EPS, reversed most recent revision to this article
- 12:13, 5 November 2020 diff hist +339 m Recent Policy Changes in the EPG Per EPG, reversed the revision to EPG 121.3
- 10:15, 5 November 2020 diff hist -307 m Recent Policy Changes in the EPG
- 10:06, 5 November 2020 diff hist -32 m Recent Policy Changes in the EPG EPG 121.3
- 09:46, 5 November 2020 diff hist 0 N File:121.3 2020.jpg current
- 09:46, 5 November 2020 diff hist +420 m 121.3 The Statewide Transportation Improvement Program (STIP) Per TP, STIP information and the annual process to update the STIP was updated to current practice.
- 13:17, 4 November 2020 diff hist +33 m Category:232 Facility Selection Per TS, numerous minor clarifications
- 12:06, 4 November 2020 diff hist -35 m 232.5 Freeways Per TS, minor clarification current
- 11:54, 4 November 2020 diff hist -1 m 232.3 Two - Way Left - Turn Lanes Per TS, minor clarifications
- 11:30, 4 November 2020 diff hist -1,231 m 232.2 Passing Lanes Per TS, minor clarifications
- 11:00, 4 November 2020 diff hist +9 m 232.1 Climbing Lanes Per TS, minor clarifications current
- 14:30, 3 November 2020 diff hist +2 m 903.7 Conventional Road Guide Signs →Table 903.7.4 Guide Sign Sizes
- 10:06, 3 November 2020 diff hist -5 m 751.10 General Superstructure
- 10:00, 3 November 2020 diff hist 0 m 751.10 General Superstructure →751.10.1.7.2 Standard Partial Depth Precast Prestressed Panel Bridge Deck Slabs Using SIP P/C P/S Panel Forms
- 13:29, 2 November 2020 diff hist -9 m 903.15 Signing Agreements updated link
- 13:28, 2 November 2020 diff hist +3 m 903.14 Memorial Signs updated link
- 13:26, 2 November 2020 diff hist +45 m Where to Find PDM Information in the EPG updated link
- 11:36, 2 November 2020 diff hist +36 m Recent Policy Changes in the EPG EPG 751.50
- 11:30, 2 November 2020 diff hist +14 m 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: Per BR, updated "subsurface drainage" to "separation" to match new wording on Standard Plans.
- 13:56, 30 October 2020 diff hist -9 m Recent Policy Changes in the EPG