User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:31, 19 February 2021 diff hist 0 LPA:136.9 Plans, Specs and Estimates (PSE) Per TS, updated ADA Checklist
- 14:30, 19 February 2021 diff hist 0 N File:136.9.4 2021.docx
- 14:29, 19 February 2021 diff hist -6 m Category:101 Standard Forms →Construction and Materials: Per TS, updated ADA Checklist
- 13:49, 19 February 2021 diff hist 0 N File:902.6.14.3.jpg current
- 13:49, 19 February 2021 diff hist 0 N File:902.6.14.1.jpg current
- 13:48, 19 February 2021 diff hist 0 N File:902.6.11.jpg current
- 13:47, 19 February 2021 diff hist +28,703 902.6 Pedestrian Control Features (MUTCD Chapter 4E) →902.6.9 Accessible Pedestrian Signals and Detectors – General (MUTCD Sections 4E.09 - 4E.13): Per TS, guidance for the visually impaired (Accessible Pedestrian Signals (APS)) has been expanded. A post-installation checklist has also been provided.
- 12:22, 19 February 2021 diff hist 0 N File:902.12.7 packet.pdf current
- 12:19, 19 February 2021 diff hist 0 m 903.18 Signing for School Areas →903.18.14 School Speed Limit Flasher Assembly (S5-1) and END SCHOOL SPEED LIMIT Sign (S5-3) (MUTCD Section 7B.15)
- 12:18, 19 February 2021 diff hist 0 N File:903.18.14.2 2021.jpg current
- 12:18, 19 February 2021 diff hist 0 N File:903.18.14.1 2021.jpg current
- 12:15, 19 February 2021 diff hist 0 N File:S5-1.jpg current
- 12:13, 19 February 2021 diff hist +1,748 903.18 Signing for School Areas Per TS, guidance for the SPEED LIMIT XX WHEN FLASHING sign is now available in EPG 903.18.14. New guidance about stopping for school buses loading or unloading children is available in EPG 903.18.16.
- 11:48, 19 February 2021 diff hist +498 902.12 Flashing Beacons (MUTCD Chapter 4L) Per TS, guidance for when to install a school speed limit flasher assembly has been updated
- 11:41, 19 February 2021 diff hist +181 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Sections 2B.53 and 2B.54)
- 09:53, 19 February 2021 diff hist +12 m Recent Policy Changes in the EPG EPG 236.4.5.5
- 09:44, 19 February 2021 diff hist +733 m 236.4 Description Writing and Titles →236.4.5 Highway Plans: Per RW, new Right of Entry guidance for when and how this agreement should be used.
- 09:12, 19 February 2021 diff hist +37 m Recent Policy Changes in the EPG EPG 238.2.17
- 09:09, 19 February 2021 diff hist +37 m 238.2 Land Surveying →238.2.17 Professional Land Surveyor Review: Per RW, updated guidance to meet legal requirement that permanent easements need to be signed and sealed by the PLS
- 13:18, 18 February 2021 diff hist 0 N File:751.0 district map.pdf current
- 13:18, 18 February 2021 diff hist +1 m 751.0 State Map current
- 13:17, 18 February 2021 diff hist -46 m 751.0 State Map updated link
- 11:23, 18 February 2021 diff hist +5 m LPA:136.13 LPA Policy Changes
- 11:07, 18 February 2021 diff hist +122 m LPA:136.13 LPA Policy Changes Fig. 136.3.20, BEAP Project Tracking Form
- 11:05, 18 February 2021 diff hist -5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20 BEAP Project Tracking Form
- 11:04, 18 February 2021 diff hist 0 N File:Fig.136.3.20 2021.docx
- 11:03, 18 February 2021 diff hist -10 m LPA:136.3 Federal Aid Basics Per BR, minor revisions for Fig. 136.3.20, BEAP Project Tracking Form
- 09:18, 18 February 2021 diff hist -61 m 147.3 Job Order Contracting (JOC) removed errant link
- 08:18, 18 February 2021 diff hist -197 m Recent Policy Changes in the EPG EPG 147.3
- 08:14, 18 February 2021 diff hist +325 m 147.3 Job Order Contracting (JOC) Per DE, FHWA has incorporated their Final Rule for ID/IQ projects into 23 CFR 635 Subpart F. JOCs are a procurement means for delivering ID/IQ projects.
- 13:15, 17 February 2021 diff hist +2 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor corrections
- 11:17, 17 February 2021 diff hist +74 m Recent Policy Changes in the EPG EPG 902.5.8.4
- 11:01, 17 February 2021 diff hist +42 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.4 Record Keeping
- 10:58, 17 February 2021 diff hist +144 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8 Responsibility for Operation and Maintenance (MUTCD Section 4D.02): Per TS, new Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist
- 10:22, 17 February 2021 diff hist 0 N File:902.5.8.3.1 checklist.xlsx current
- 10:20, 17 February 2021 diff hist +133 m Category:101 Standard Forms →Financial Services: Per TS, added Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist
- 10:16, 17 February 2021 diff hist 0 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.36.2 Yellow Change and Red Clearance Intervals (MUTCD Section 4D.26): Per TS, minor correction
- 09:46, 17 February 2021 diff hist +38 m Recent Policy Changes in the EPG EPG 237.13.1
- 09:38, 17 February 2021 diff hist 0 N File:237.13.1 no typical.jpg current
- 09:38, 17 February 2021 diff hist +655 m 237.13 Contract Plan File Name Convention →237.13.1 Design Contract Plans: Per Bid & Contracts, clarified how to name contract plan files when typical sections are not included in the plans
- 09:51, 16 February 2021 diff hist +149 m 231.2 Clear Zones →231.2.1 Introduction: Per TS, minor clarifications current
- 09:24, 11 February 2021 diff hist +60 m Recent Policy Changes in the EPG EPG 127.1.2.1
- 09:21, 11 February 2021 diff hist +23 m 127.1 Request for Environmental Services →127.1.2.1 Location/Conceptual Plan Stage: Per Env'l, clarified that NEPA can be approved at location/conceptual plan stage for simple projects but occurs later for more complicated projects.
- 08:15, 10 February 2021 diff hist -560 m Recent Policy Changes in the EPG EPG 134.3.2
- 15:40, 9 February 2021 diff hist +146 m 751.12 Barriers, Railings, Curbs and Fences →751.12.1.3.3 End of Barrier Reinforcement: Per BR, minor correction in the barbill guidance
- 08:32, 9 February 2021 diff hist -68 m 231.4 Shoulder Width →231.4.2.1 Rural Major Routes: updated link
- 15:54, 8 February 2021 diff hist -1 m 751.13 Expansion Joint Systems →751.13.3.1 General
- 15:53, 8 February 2021 diff hist 0 N File:751.13.3.1 2021.jpg current
- 15:52, 8 February 2021 diff hist +7,704 m 751.13 Expansion Joint Systems Per BR, implemented open cell foam joint seal and updated preformed compression seal for revised manufacturer data.
- 15:35, 8 February 2021 diff hist +865 m Recent Policy Changes in the EPG