User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:30, 17 May 2022 diff hist +176 m 751.9 Bridge Seismic Design →751.9.3.1.4 Concrete Shear Blocks
- 15:30, 16 May 2022 diff hist +3 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.15 Disadvantaged Business Enterprise (DBE) (49 CFR Part 26)
- 10:59, 16 May 2022 diff hist -280 m Recent Policy Changes in the EPG EPG 402 and EPG 409
- 10:50, 16 May 2022 diff hist 0 N File:409 Seal Coat Contractor Striping 2023.pdf current
- 10:48, 16 May 2022 diff hist 0 N File:409 FY2023 Contract Seal Coat Guidelines.docx current
- 10:48, 16 May 2022 diff hist 0 N File:409 FY2023 Contract Seal Coat Book Job Guidelines.docx current
- 10:47, 16 May 2022 diff hist +11 m Category:409 Seal Coat Per EPS, the Seal Coat and JSP package were updated.
- 10:39, 16 May 2022 diff hist +3 m Category:402 Bituminous Surface Leveling
- 10:32, 16 May 2022 diff hist 0 N File:402 CLC Contactor Striping 2023.pdf current
- 10:32, 16 May 2022 diff hist 0 N File:402 FY2023 Contract Leveling Course Book Job Guidelines.docx current
- 10:32, 16 May 2022 diff hist 0 N File:402 FY2023 Contract Leveling Course Guidelines.docx current
- 10:28, 16 May 2022 diff hist +78 m Category:402 Bituminous Surface Leveling Per EPS, the CLC and JSP package were updated.
- 09:55, 16 May 2022 diff hist -68 m Category:941 Permits and Access Requests Per TS, updated link
- 07:47, 13 May 2022 diff hist +94 m Category:134 Engineering Professional Services →134.3.4 Basis of Payment: Per DE Prof'l Services, updated link
- 15:14, 11 May 2022 diff hist +413 m Recent Policy Changes in the EPG EPG 751
- 14:53, 11 May 2022 diff hist 0 N File:751.22.3.14 plan.jpg current
- 14:53, 11 May 2022 diff hist 0 N File:751.22.3.14 elevation.jpg current
- 14:50, 11 May 2022 diff hist +6,094 m 751.22 Prestressed Concrete I Girders Per BR, clarified and expanded bearing anchor bolt, dowel bar, and shear block design.
- 14:40, 11 May 2022 diff hist +11,295 m 751.11 Bearings Per BR, clarified bearing anchor bolt, dowel bar, and shear block design.
- 14:28, 11 May 2022 diff hist +1,083 m 751.9 Bridge Seismic Design →751.9.3.1 Connection Design: Per BR, clarified bearing anchor bolt, dowel bar, and shear block design.
- 13:45, 10 May 2022 diff hist +65 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.11 Dowel Bars and Shear Blocks: Per BR
- 13:01, 10 May 2022 diff hist -33 m 132.2 Construction Inspection Guidelines for Safety Precautions →132.2.2 Traffic Control: Per CM current
- 13:00, 10 May 2022 diff hist -35 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.1 Construction Inspection Guidance for Sec 203: Per CM current
- 12:59, 10 May 2022 diff hist -33 m 616.18 Construction Inspection Guidelines for Sec 616 →Construction Requirements (for Sec 616.4): Per CM current
- 12:28, 10 May 2022 diff hist +56 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction Per CM, updated links and references from archaic Documentation Records QRG to current AWP CP Documentation Records
- 12:23, 10 May 2022 diff hist +18 m 616.18 Construction Inspection Guidelines for Sec 616 →Construction Requirements (for Sec 616.4): Per CM, updated links and references from archaic Documentation Records QRG to current AWP CP Documentation Records
- 12:22, 10 May 2022 diff hist +46 m 132.2 Construction Inspection Guidelines for Safety Precautions →132.2.2 Traffic Control: Per CM, updated links and references from archaic Documentation Records QRG to current AWP CP Documentation Records
- 08:48, 6 May 2022 diff hist +22 m Category:403 Asphaltic Concrete Pavement Per IS, updated CM link
- 08:48, 6 May 2022 diff hist +22 m Category:401 Bituminous Base and Pavement Per IS, updated CM link
- 08:47, 6 May 2022 diff hist +22 m 104.7 Scoping Estimates →Maintenance of Traffic Operations During Construction (Sec 104.7.3): Per IS, updated CM link
- 14:34, 3 May 2022 diff hist 0 N File:127.2.6 brochure.pdf current
- 14:33, 3 May 2022 diff hist 0 N File:127.2.6 sample letter.docx
- 14:33, 3 May 2022 diff hist -40 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated broken links
- 08:17, 3 May 2022 diff hist +16 m LPA:136.11 Local Public Agency Construction Per LPA, updated links
- 08:14, 3 May 2022 diff hist +2 m LPA:136.10 Advertisement for Bid and Project Award Per LPA, updated link
- 08:13, 3 May 2022 diff hist +2 m LPA:136.7 Design Per LPA, updated link
- 08:12, 3 May 2022 diff hist +2 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated link
- 07:57, 3 May 2022 diff hist +2 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated link
- 07:56, 3 May 2022 diff hist +2 m LPA:136.1 Introduction Per LPA, updated link
- 07:54, 3 May 2022 diff hist +2 m LPA:136 Local Public Agency (LPA) Policy Per LPA, updated link
- 07:38, 3 May 2022 diff hist +10 m Category:108 Prosecution and Progress →108.16.1 Informational Dates: updated link
- 15:05, 29 April 2022 diff hist +100 m Recent Policy Changes in the EPG
- 14:56, 29 April 2022 diff hist -49 m Recent Policy Changes in the EPG EPG 105, EPG 109.8
- 13:52, 29 April 2022 diff hist +3 m Category:105 Control of Work →105.15.2.1 Contractor Delays in Submittal of Final Acceptance Documents
- 13:45, 29 April 2022 diff hist +2 m Category:105 Control of Work →105.15.1.4 Acceptance for Maintenance (Final Inspection)
- 13:42, 29 April 2022 diff hist +268 m Category:105 Control of Work →105.15 Project Acceptance: inserted links
- 13:36, 29 April 2022 diff hist +6 m Category:105 Control of Work →105.15 Project Acceptance
- 13:36, 29 April 2022 diff hist +68 m Category:105 Control of Work →105.15 Project Acceptance: inserted link
- 13:31, 29 April 2022 diff hist +89 m Category:105 Control of Work →105.15.2.1 Contractor Delays in Submittal of Final Acceptance Documents: inserted link
- 13:20, 29 April 2022 diff hist -1,461 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, clarified and updated project acceptance guidance to current practice by deleting "Sample Letters to Address Final Paperwork Requirements for Contractors"