Category:208 Interception Ditch

From Engineering_Policy_Guide
Revision as of 11:28, 25 July 2007 by Mastes (talk | contribs) (add new article)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

208.1 Construction Inspection Guidance for Sec 208

On projects where erosion is expected to be a serious problem, interception ditches, or levees, or both may be shown on the plans.

Description (Sec 208.1)

As specified.

Construction Requirements (Sec 208.2)

As specified.

Method of Measurement (Sec 208.3)

Measurement of interception ditches is to be made along the flow line of the ditch and recorded in a bound field book.

Basis of Payment (Sec 208.4)

As specified.