609.4 Maintenance Planning Guidelines for Cleaning and Reshaping Paved Ditches

From Engineering_Policy_Guide
Revision as of 12:09, 3 January 2008 by Smithk (talk | contribs) (Maintenance planning guidelines from Maintenance)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

These Maintenance planning guidelines apply to minor roads.

Code: R316

Purpose To fill voids and realign settled sections of paved ditches.

Scheduling As needed when the temperature is above freezing.

Recommended Equipment

  • Dump truck
  • Water truck
  • Mudjack
  • Air compressor
  • Pavement Drill
  • Traffic control equipment, as needed.

Recommended Material

  • Water
  • Portland cement
  • Agricultural lime

Recommended Procedure

1. Call Dig Rite and check for MoDOT utilities.

2. Place traffic control devices as needed.

3. Wet paved ditch.

4. Pump and plug predrilled holes. Begin pumping at low end of section.

5. Clean work area and equipment.

6. Remove traffic control devices.

Safety Wear all appropriate Personal Protection Equip (PPE). Refer to Safety Policies, Rules & Regulations-Employee Handbook .

Other Considerations Production can be increased by drilling in advance.

Reference Sec 609