Revision history of "106.4 Plant Inspections"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 12:48, 8 June 2016Smithk (Talk | contribs)m . . (15,410 bytes) (+8). . (updated link)
  • (cur | prev) 14:18, 18 March 2016Smithk (Talk | contribs)m . . (15,402 bytes) (+2,543). . (106.4.2.6 Bituminous distributors: Per CM, updated to align w/ spec book. Updated to achieve proper application & coverage of tack coat material to improve bond strength between pavement layers.)
  • (cur | prev) 14:56, 5 June 2014Smithk (Talk | contribs)m . . (12,859 bytes) (-59). . (Per CM, guidance revised to explain QC/QA roles for concrete plant inspections. This is a clarification of the broader QM initiative that we’ve been implementing over the past 2 yrs.)
  • (cur | prev) 11:47, 5 March 2012Smithk (Talk | contribs)m . . (12,918 bytes) (-21). . (106.4.2.6 Bituminous distributors: Per CM, the contractor/supplier is now allowed to calibrate equipment.)
  • (cur | prev) 09:57, 1 July 2010Smithk (Talk | contribs)m . . (12,939 bytes) (+12,939). . (EPG 106.4 renamed to match title of Sec 106.4, per CM. Old 106.4 had 1384 hits. 3/1/10: Ready-mix plants to be calibrated annually and other minor updates, per CM)