106.8 Material Furnished by the Commission

From Engineering_Policy_Guide
Revision as of 10:53, 1 July 2010 by Smithk (talk | contribs) (Per CM, for greater clarity,old EPG 106.8 (1047 hits) was moved to EPG 106.19 to align with Sec 106.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Sec 106.8 provides information regarding material furnished by the Commission. The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.