Revision history of "570.3 Repair of Buckled Pavement"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 13:16, 29 November 2007Tschid (Talk | contribs). . (1,933 bytes) (+1,933). . (New page: "Blowups" or buckled pavement occurs when the compressive stress due to high temperatures exceed the strength of the concrete at some locations in the pavement. These blow-ups usually occu...)