Difference between revisions of "Category:618 Mobilization"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (article construction)
m (article construction)
Line 1: Line 1:
 
[[image:618 Mobilization.jpg|right|300px]]
 
[[image:618 Mobilization.jpg|right|300px]]
Mobilization includes the movement and preparation of facilities, equipment, supplies and personnel for work on the project.  Mobilization costs are included on every project and may be estimated at 4% of the project's total construction cost.  This figure will be more carefully analyzed and adjusted by Design Division.
+
Mobilization includes the movement and preparation of facilities, equipment, supplies and personnel for work on the project.  Mobilization costs are included on every project and may be estimated at 4% of the project's total construction cost.  This figure will be more carefully analyzed and adjusted by Design.
  
 
No standard plans are associated with mobilization, but the [http://www.modot.state.mo.us/business/standards_and_specs/Sec0618.pdf Mobilization standard spec] is included in the ''Missouri Standard Specification for Highway Construction''.
 
No standard plans are associated with mobilization, but the [http://www.modot.state.mo.us/business/standards_and_specs/Sec0618.pdf Mobilization standard spec] is included in the ''Missouri Standard Specification for Highway Construction''.

Revision as of 12:57, 17 August 2007

618 Mobilization.jpg

Mobilization includes the movement and preparation of facilities, equipment, supplies and personnel for work on the project. Mobilization costs are included on every project and may be estimated at 4% of the project's total construction cost. This figure will be more carefully analyzed and adjusted by Design.

No standard plans are associated with mobilization, but the Mobilization standard spec is included in the Missouri Standard Specification for Highway Construction.