Difference between revisions of "Category:756 Seismic Design"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (article construction)
Line 5: Line 5:
  
 
All new bridges on the state system include small details and design checks to resist earthquakes. In Seismic Performance Categories B, C and D, additional design and detailing work is needed because of the increased probability of damaging earthquakes.
 
All new bridges on the state system include small details and design checks to resist earthquakes. In Seismic Performance Categories B, C and D, additional design and detailing work is needed because of the increased probability of damaging earthquakes.
 +
{| style="margin: 1em auto 1em auto" align="left"
 +
|-
 +
|[[Image:756 Figure Seismic Performance Categories.gif|340 px|left|Seismic Performance Categories]]||[[Image:756 Figure St. Louis Area.gif|280 px|St. Louis Area]]
 +
|}
  
[[Image:756 Figure Seismic Performance Categories.gif|100 px|Seismic Performance Categories]]
 
[[Image:756 Figure St. Louis Area.gif|100 px|St. Louis Area]]
 
  
 
When existing bridges in SPC B, C and D are identified as needing repairs or maintenance, a decision on whether to include seismic retrofitting in the scope of the project should be made based on the location of the bridge, the extent of the rehabilitation work and the expected life of the of the bridge after the work. For example, if the bridge needs painting or deck patching, no retrofitting is recommended. However, redecking or widening the bridge indicates that MoDOT is planning to keep the bridge in the state system with an expected life of at least 30 more years.  In these instances, the project core team should consider cost effective methods of retrofitting the existing bridge.
 
When existing bridges in SPC B, C and D are identified as needing repairs or maintenance, a decision on whether to include seismic retrofitting in the scope of the project should be made based on the location of the bridge, the extent of the rehabilitation work and the expected life of the of the bridge after the work. For example, if the bridge needs painting or deck patching, no retrofitting is recommended. However, redecking or widening the bridge indicates that MoDOT is planning to keep the bridge in the state system with an expected life of at least 30 more years.  In these instances, the project core team should consider cost effective methods of retrofitting the existing bridge.

Revision as of 11:03, 21 September 2007

Key Points

All new bridges on the state system include small details and design checks to resist earthquakes. In Seismic Performance Categories B, C and D, additional design and detailing work is needed because of the increased probability of damaging earthquakes.

Seismic Performance Categories
St. Louis Area


When existing bridges in SPC B, C and D are identified as needing repairs or maintenance, a decision on whether to include seismic retrofitting in the scope of the project should be made based on the location of the bridge, the extent of the rehabilitation work and the expected life of the of the bridge after the work. For example, if the bridge needs painting or deck patching, no retrofitting is recommended. However, redecking or widening the bridge indicates that MoDOT is planning to keep the bridge in the state system with an expected life of at least 30 more years. In these instances, the project core team should consider cost effective methods of retrofitting the existing bridge.