Category:941 Permitting Process for Access Management

From Engineering Policy Guide

Jump to: navigation, search

The Access Management Guidelines are the physical description of how Access Management goals will be attained. Equally important, however, is the method in which the program is administered.

This article includes discussions on:

- Legal Authority for Access Management in Missouri

- Coordination between MoDOT and Local Entities

- Urban/Rural Designations

- Pre-Application Process

- Traffic Impact Study Requirements

- Approval Process Timetable

- Driveways within Limited Access

- Changes in Access within Limited Access Right of Way

- Compliant Changes in Access

- Application Fee

- Change in Access Agreements

- Reversionary Clause

- Agreement Process

- Deeds

- Diamond Interchange Policy

- Limited Access Permit Submittal

- Removal of Usage Restrictions

- Appeals Process

- Sight Distance for Driveways

- Sight Distance

- Surface Drainage

- Storm Water Regulations

- Obstructions

- Inspection of Driveways

- Construction Time

- Default of Permit Requirements

- Deposit Requirements

- Pipe Extensions for Widening Existing Type I, II, III, IV or V Driveways

- Maintenance of Residential, Commercial and Public Road Entrances (Driveway Maintenance)

- Joint Use Driveways

- Permits within the Limits of a Proposed Project on the Right of Way and Construction Program

- Permits within Active Construction Limits

- Sidewalks

- Driveway Lighting

- Barrier Materials

- Material Specifications