Category talk:203 Roadway and Drainage Excavation, Embankment and Compaction
Jump to navigation
Jump to search
203.2.3.1.2 Borrow or Excess Material States:
The plans shall designate commission furnished borrow areas for all projects where suitable borrow areas can be provided.
Is this correct? I thought the department had moved toward contractor furnished borrow.
--Martik2 13:06, 25 February 2009 (CST)