Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m
(46 intermediate revisions by 3 users not shown)
Line 4: Line 4:
 
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3C87E" width="1030px" align="center"  
 
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3C87E" width="1030px" align="center"  
 
|-
 
|-
|rowspan="2" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white"> ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Help Finding EPG Info.wmv|•Finding Info in the EPG]]</i></font color="white">'''
+
|colspan="4" align="center"|'''<Big><font color = "white"><i>Useful information on how to search for info in the EPG: [[media:Searching the Engineering Policy Guide.docx|Searching the Engineering Policy Guide]]'''</i></font color="white">
|-
 
| ||align="left" colspan="2"|''' <Big><font color = "white"><i>[[media:Article History and Receiving.wmv|•Article History & How to Receive EMails When Articles are Revised]]</i></font color="white">
 
|-
 
|colspan="4" align="center"| <sup>'''___________'''</sup>
 
 
|-
 
|-
 
|colspan="4" align="center"| '''<Big><font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">
 
|colspan="4" align="center"| '''<Big><font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">
Line 26: Line 22:
 
|-
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
{| style="margin: 1em auto 1em auto"
 
|-
 
|[[image:Main Page May 18, 2018.jpg|center|400px|thumb|''' <center>  The new [http://www.modot.org/northeast/newsandinformation/District3Release.shtml?action=displaySSI&newsId=215953 I-70 interchange at Warrenton] will include three roundabouts. The $8.5 million project is expected to be completed this fall.  </center>''']]
 
|-
 
|[[image:Main Page May 7, 2018.jpg|center|400px|thumb|''' <center>  [https://paceconstructionstl.com/ Pace Construction] crews work on the final preparations to complete a [http://www.modot.org/stlouis/major_projects/I-44atRoute141DesignBuild.htm new flyover ramp between Rte. 141 and I-44] in Valley Park. The ramp is one portion of a [http://epg.modot.org/index.php?title=Category:139_Design_-_Build design-build construction project] to be completed by July 15 that reduces congestion and improves traffic flow through and in the vicinity of the interchange.  </center>''']]
 
|-
 
|[[image:Main Page May 3b, 2018.jpg|center|400px|thumb|''' <center>  Sr. Maint. Worker Ryan Horvatic (L) is recognized by Dist. Eng. Travis Koestner with the Meritorious Safety Award for rescuing a motorist.  Ryan was treating Rte. 13 just north of the Henry/Johnson county line Feb. 22 when he saw a pickup on its top in a ditch. In the truck a woman, still in her seatbelt, hung upside down with her leg caught in the steering wheel. Removing the woman from the pickup, he determined she was not seriously hurt. Ryan got her into his truck to await the arrival of law enforcement and an ambulance.  </center>''']]
 
|}
 
  
 
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised.  Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry.   
 
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised.  Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry.   
Line 39: Line 27:
 
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] and [http://sharepoint/systemdelivery/mt/default.aspx Maintenance] manuals.   
 
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] and [http://sharepoint/systemdelivery/mt/default.aspx Maintenance] manuals.   
  
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
+
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
 
 
 
 
 
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"
 
|-
 
|colspan="5" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late May, the numbers of hits are:'''
 
|-
 
|<font size=2>'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 170444
 
  ||&nbsp;<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 240449
 
|-
 
|<font size = 2>'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 179293    ||&nbsp;<font size = 2>'''9.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 275258
 
|-
 
|<font size = 2>'''18.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 180155    ||&nbsp;<font size = 2>'''8.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 281432
 
|-
 
|<font size = 2>'''17.'''    [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 180206  ||&nbsp;<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 331649
 
|-
 
|<font size = 2>'''16.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 191050  ||&nbsp;<font size = 2>'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 348046
 
|-
 
|<font size = 2>'''15.'''    [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 198857  ||&nbsp;<font size = 2>'''5.'''  [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 366924
 
|-
 
|<font size = 2>'''14.'''    [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 209029  ||&nbsp;<font size = 2>'''4.'''  [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 392977
 
|-
 
|<font size = 2>'''13.'''    [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 211639      ||&nbsp;<font size = 2>'''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 393138
 
|-
 
|<font size = 2>'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 220441  ||&nbsp;<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 457856
 
|-
 
|width="130"|<font size = 2>'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 224329  || width="150"|&nbsp;<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 3142022
 
|}
 
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[106.12 Pre-Acceptance Lists (PAL)#Upon receipt and review|EPG 106.12 PAL Material Arrival Confirmation]]'''
+
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
  
5/22/18: Pre-Acceptance Identification Tag guidance was clarified to allow for identifying PAL material shipped to MoDOT projects.  
+
10/12/18: Notes [[751.50 Standard Detailing Notes#(J1.12b)|J1.12b]], [[751.50 Standard Detailing Notes#(J1.21b)|J1.21b]] and [[751.50 Standard Detailing Notes#(J1.25)|J1.25A]] have been added. J1.25 was revised to clarify maximum applied bearing pressure limit.  
  
'''[[:Category:806 Pollution, Erosion and Sediment Control#Design Guidance|EPG 806.7 Temporary Erosion Control Blankets Design Guidance]]'''
+
'''[[127.14 National Environmental Policy Act (NEPA) Classification and Documents|EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents]]'''
  
5/17/18: The types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types based on the region, length of slope and the necessary blanket duration.  
+
10/11/18: This article has been extensively revised to reflect current procedures.
  
'''2-loop and 3-loop Concrete Barriers'''  
+
'''[[106.3.2.88 TM-88 Bond Strength Test for Tack Coat|EPG 106.3.2.88 TM-88 Bond Strength Test for Tack Coat]]'''
  
5/17/18: In [[616.19 Quality Standards for Temporary Traffic Control Devices#2- and 3-Loop Type F|EPG 616.19.2.5 Temporary Traffic Barriers]] and [[617.2 Construction Inspection Guidelines for Sec 617#Temporary Concrete Traffic Barrier|EPG 617.2 Construction Inspection Guidelines for Sec 617]], guidance was clarified for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.  
+
10/10/18: This new Test Method is now available.
  
'''Design Agreements and Contracts'''
+
'''[[771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)|EPG 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)]]'''
  
5/14/18: Those who need to review [[153.8 Design#DE43|DE43, DE44 and DE46-49]] prior to contractual execution has been updated.
+
10/10/18: This article has been re-titled. Also, the requirement for the formed underseal access hole for the concrete bridge approach slabs has been eliminated.
  
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Uniformed Services|Three new Federal Aid Projects Posters]]'''
+
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Equipment Rental with Operator and Purchase Ordered Work|EPG 110.3 Equipment Rental with Operator and Purchase Ordered Work]]'''
  
5/11/18: Three new posters are required to be displayed on Federal-Aid project sites:  [http://epg.modot.mo.gov/forms/CM/27_USERRA.pdf Uniformed Services Employment and Reemployment Rights Act (USERRA)],
+
9/25/18: Guidance about which certified payrolls are required for rental equipment operators was clarified.
[http://epg.modot.mo.gov/forms/CM/28e_Pay_Transparency.pdf Pay Transparency Nondiscrimination Provision (English)] and  [http://epg.modot.mo.gov/forms/CM/29s_Pay_Transparency.pdf Pay Transparency Nondiscrimination Provision (Spanish)].
 
  
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#110.3.4 Missouri DOL Form PW-2|EPG 110.3.4 Missouri DOL Form PW-2]]'''
+
'''Bridge Survey Checklist '''
  
5/9/18: New guidance agreed to by the DOL is now available about the DOL's PW-2 form.
+
9/24/18: Guidance about the Bridge Survey Checklist was clarified in [[238.3 Route Surveying#238.3.36 Bridge Surveys|EPG 238.3.36 Bridge Surveys]], [[:Category:747 Bridge Reports and Layouts#747.2.2.1 Bridge Survey Report|EPG 747.2.2.1 Bridge Survey Report]], [[:Category:747 Bridge Reports and Layouts#747.2.3 Bridge Survey Sheet Data|EPG 747.2.3 Bridge Survey Sheet Data]], [[:Category:747 Bridge Reports and Layouts#747.2.3.4 Profile Sheets|EPG 747.2.3.4 Profile Sheets]] and [[750.3 Bridges#750.3.1.1.2.6 Other Bridges|EPG 750.3.1.1.2.6 Other Bridges]].
  
'''[[231.4 Shoulder Width#A minimum shy distance at least|EPG 231.4 Shoulder Width]]'''
+
'''[[236.14 Change in Route Status Report#236.14.4.3 Submittal|EPG 236.14.4.3 Submittal]]'''
  
5/9/18: Guidance about guardrail placement from the edge of the shoulder was clarified.
+
9/20/18: Additional guidance is now available for district staff on when to include a Change in Route Marking Report.
  
'''[[751.1 Preliminary Design#751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating|EPG 751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating]]'''
+
'''[[236.5 Property Management#236.5.25.4 Marketing Properties for Lease|EPG 236.5.25.4 Marketing Properties for Lease]]'''
  
5/3/18: New bridge preliminary design guidance for assessing asbestos and lead considerations for structure removal, rehabs and recoatings as well as how to address these considerations on the Bridge Memorandum.
+
9/20/18: Guidance has been added to permit a new clause in the lease.
  
'''[[237.14 Electronic Design Data Delivery#237.14.3.6 Electronic Design Data for MoDOT Construction|EPG 237.14.3.6 Electronic Design Data for MoDOT Construction]]'''
+
'''Saw Cut Joints'''
  
5/2/18: Guidance about the initial request for the Construction files has been clarified.
+
8/31/18: Guidance in [[751.12 Protective Barriers#751.12.2.7 Joint Details|EPG 751.12.2.7 Joint Details]], [[751.12 Protective Barriers#751.12.2.8 Plastic Waterstop|EPG 751.12.2.8 Plastic Waterstop]] and [[751.50 Standard Detailing Notes#H10. Barrier Curbs – Safety, Median, Type C and D|EPG H10. Barrier Curbs – Safety, Median, Type C and D]] was revised to allow saw cut joints for conventional-formed barrier curbs.
  
'''Outdoor Advertising'''
+
'''[[236.3 Administration#State Funded Early Acquisition|EPG 236.3.4.4 Advance Acquisition, State Funded Early Acquisition]]'''
  
4/30/18: Guidance in [[236.16 Outdoor Advertising#236.16.8.5 Vegetation Site Inspection|EPG 236.16.8.5 Vegetation Site Inspection]], [[236.16 Outdoor Advertising#236.16.15.4 Cutting of Vegetation|EPG 236.16.15.4 Cutting of Vegetation]],  [[236.16 Outdoor Advertising#236.16.15.6 Trimming of Trees|EPG 236.16.15.6 Trimming of Trees]] and [[236.16 Outdoor Advertising#236.16.15.9 Releasing a Vegetation Permit|EPG 236.16.15.9 Releasing a Vegetation Permit]] have been impacted by  Administrative Rule revisions.
+
8/27/17: Guidelines related to MAP-21 have been provided to bring guidance up to current practice.
  
'''[[102.2 Contractor Performance Rating System#102.2.7 Performance Discussion|EPG 102.2.7 Performance Discussion]]'''
+
'''[[106.9 Buy America Requirement#When does Buy America apply to manufactured items?|EPG 106.9, When does Buy America apply to manufactured items?]]'''
  
4/27/18: Guidance for when certified mail is necessary for the Contractor Performance Rating has been updated.
+
8/16/18: Guidance has been added to [[106.9 Buy America Requirement|EPG 106.9 Buy America Requirement]] clarifying when Buy America applies to manufactured items.
  
'''[[751.50 Standard Detailing Notes#(E2.27)|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[231.2 Clear Zones|EPG 231.2 Clear Zones]]'''
  
4/25/18: A new standard detailing note about deviations in galvanized pile penetration is now available.
+
8/14/18: Clear zone guidance has been clarified and associated figures have been updated.
  
'''[[903.4 Overhead Sign Mounting#The standard footing for steel and aluminum box truss|EPG 903.4.6 Span, Cantilever and Butterfly Box Trusses]]'''
+
'''[[media:756 LFD flow chart.pdf|LFD Bridge Seismic Design Process Flowchart]]'''
  
4/16/18: Guidance about drilled shaft footings has been clarified. MoDOT may be the designer of the footing and if not, others will have to submit signed and sealed drawings.
+
8/14/18: In [[:Category:756 Seismic Design|EPG 756 Seismic Design]], updated this flowchart to include, among other changes, new superstructure replacement guidance.
  
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[231.8 Bridge Width|EPG 231.8 Bridge Width]]'''
  
4/13/18: In [[751.50 Standard Detailing Notes#D. Temporary Bridge (Notes for Bridge Standard Drawings)|EPG 751.50 D. Temporary Bridge]], revisions include a new clarifying note D1.5 and replacing an archaic option in D1.21 with the current option.  In [[751.50 Standard Detailing Notes#H9. Thrie Beam and Other Rail Types (Notes for Bridge Standard Drawings)|EPG 751.50 H9. Thrie Beam and Other Rail Types]], revisions include the new H9.29 for two thrie beam standard drawings.
+
8/13/18: EPG 231.8 is now coordinated with Green Book guidance that clear bridge widths shall be the same as the approach roadway widths for collectors, arterials and freeways.
  
'''[[751.8 LRFD Concrete Box Culverts#751.8.3.4 Wing Walls on Rock|EPG 751.8.3.4 Wing Walls on Rock]]'''
+
'''[[:Category:806 Pollution, Erosion and Sediment Control|EPG 806 Pollution, Erosion and Sediment Control]]'''
  
4/11/18: New guidance for culvert wing walls on rock is now available.
+
8/7/18: All of EPG 806 (except for [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 SWPPP]]) has been completely rewritten to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.
  
'''Inclusion of DOL Wage Rates In Contracts'''
+
'''[[:Category:612 Impact Attenuators|Impact Attenuators and Sand Barrel Arrays]]'''
  
4/10/2018: In [[:Category:110 State and Federal Wage Rates and Other Requirements#110.1 Wage Rates (Guidance for Sec 110.1)|EPG 110.1 Wage Rates]], guidance about including the correct wage rate order from the Dept. of Labor on MoDOT projects was updated.
+
8/7/18: Sand barrel impact attenuator setup will now be based on the manufacturer's recommendations instead of MoDOT's standard plans. Work zone durations have been revised. New guidance clarifies when the flashing arrow panel and lights on the TMA should be active.
  
'''[[127.29 Storm Water#Special Watersheds where MoDOT|Special Watersheds where MoDOT has been assigned a Wasteload Allocation]]'''
+
'''Work Zone Duration and TA-35 Mobile Operation'''
  
4/9/18: Guidance to go with the MDNR permit agreement has been added.  
+
8/7/18: Guidance was clarified in [[616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)#616.7.2 Work Duration (MUTCD 6G.02)|EPG 616.7.2 Work Duration]] and [[616.23 Traffic Control for Field Operations#616.23.2.6.1 Duration of Work|EPG 616.23.2.6.1 Duration of Work]] about which traffic control devices are needed based on the work duration.  [[media:616.8.35 MT.pdf|TA-35]] was updated to include an additional TMA with added guidance for which operations TA-35 can be used.
  
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Required Notices and Posters|Project Bulletin Board Inspection Rate]] '''
+
'''[[:Category:123 Federal-Aid Highway Program#123.1.1 FHWA Oversight - National Highway System|EPG 123.1.1 FHWA Oversight - National Highway System]]'''
  
4/5/18: The bulletin board inspection rate was revised from every two months to every three months.
+
7/27/18: Information for Projects of Division Interest (PoDI) has been updated for FY19.  
  
'''[[:Category:749 Hydrologic Analysis#749.5.3 Time of Concentration|EPG 749.5.3 Time of Concentration]]'''
+
'''[[237.14 Electronic Design Data Delivery#237.14.3.6 Electronic Design Data for MoDOT Construction|EPG 237.14.3.6 Electronic Design Data for MoDOT Construction]]'''
  
4/5/18: Time of Concentration guidance was revised by providing an optional combination of Kirby-Hathaway and Kirpich equations and adding the optional low slope factor presented in new research.  
+
7/25/18: Guidance was updated to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures were deleted.  
  
'''[[media:747 Bridge Survey Report April 2018.docx|Bridge Survey Report]]'''
+
'''[[:Category:618 Mobilization#Basis of Payment for Mobilization (Per Sec 618.2 Basis of Payment)|EPG 618 Basis of Payment for Mobilization]]'''
  
4/4/18: The latest version of this form is now available.
+
6/29/18: New guidance clarifies how REs should administer payment for mobilization.
  
'''[[237.13 Contract Plan File Name Convention#237.13.5 Example Set of Electronic Design Data|EPG 237.13.5 Example Set of Electronic Design Data]]'''
+
'''[[236.7 Negotiation#236.7.5.4 Acquisition from State of Missouri Agencies|EPG 236.7.5.4 Acquisition from Conservation Commission and the University of Missouri]]'''
  
4/3/18: This chart has been updated with current examples.
+
6/28/18: Comments about MoDOT acquiring property from the Univ. of MO and Dept. of Conservation were added.  
  
'''[[236.5 Property Management#236.5.16 Legal Opinion of Title|EPG 236.5.16.1 Fee Simple vs. Less Than Fee Simple Interest]]'''
+
'''[[238.2 Land Surveying#238.2.17 Professional Land Surveyor Review|EPG 238.2.17 Professional Land Surveyor Review]]'''
  
4/2/18: Clarified guidance about the legal title of opinion for excess property appraised for $25,000 or less that includes any references to right of way in the acquisition deed.
+
6/26/18: Guidance was clarified with current business practices.  
  
'''Light Bar Guidance'''
+
'''[[751.11 Bearings#ASTM F1554 Grade 105 anchor bolts|Design of Elastomeric Bearings' Anchor Bolts]]'''  
  
4/2/18: In [[616.8 Typical Applications (MUTCD 6H)|EPG 616.8 Typical Applications]], light bar policy in [[media:616.8.35 MT Apr 2018.pdf|TA-35]] and TAs [[media:616.8.35a MT Apr 2018.pdf|35a]]-[[media:616.8.35d MT Apr 2018.pdf|d]] was clarified by highlighting in a note that the light bar is optional. Also, Light Bar guidance in [[616.27 Fleet Lighting#Level 5|EPG 616.27 Fleet Lighting]] was updated.  
+
6/5/18: ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
  
'''Obtaining DBE Concurrence Electronically in eAgreements'''
+
'''[[751.50 Standard Detailing Notes#(B3.2)|EPG 751.50 Standard Detailing Notes]]'''
  
3/28/18:  DBE Concurrence may now be electronically obtained in eAgreements. [[:Category:134 Engineering Professional Services#7. DBE Concurrence must be obtained|MOU execution process]], [[:Category:134 Engineering Professional Services#DBE Concurrence must be obtained from External|consultant contract]] and  [[:Category:134 Engineering Professional Services#DBE Concurrence must be obtained from External Civil|supplemental agreement]] guidance was updated.
+
6/1/18:  Note B3.2 was clarified.
  
'''[[751.2 Loads#Wind Pressure on Vehicles|EPG 751.2.2 Transient Loads]]'''
+
'''[[751.10 General Superstructure#751.10.3.1 Type, Alignment and Spacing|EPG 751.10.3 Bridge Deck Drainage - Slab Drains]]'''
  
3/27/18: Wind pressure on vehicles, [[751.2 Loads#751.2.2.6 Other Loads|braking force and centrifugal force]] are assumed to act horizontally at the roadway surface, per AASHTO agenda.
+
5/24/18: Guidance now states the allowed slab drain color coatings.

Revision as of 11:04, 12 October 2018

EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

EPG 751.50 Standard Detailing Notes

10/12/18: Notes J1.12b, J1.21b and J1.25A have been added. J1.25 was revised to clarify maximum applied bearing pressure limit.

EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents

10/11/18: This article has been extensively revised to reflect current procedures.

EPG 106.3.2.88 TM-88 Bond Strength Test for Tack Coat

10/10/18: This new Test Method is now available.

EPG 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)

10/10/18: This article has been re-titled. Also, the requirement for the formed underseal access hole for the concrete bridge approach slabs has been eliminated.

EPG 110.3 Equipment Rental with Operator and Purchase Ordered Work

9/25/18: Guidance about which certified payrolls are required for rental equipment operators was clarified.

Bridge Survey Checklist

9/24/18: Guidance about the Bridge Survey Checklist was clarified in EPG 238.3.36 Bridge Surveys, EPG 747.2.2.1 Bridge Survey Report, EPG 747.2.3 Bridge Survey Sheet Data, EPG 747.2.3.4 Profile Sheets and EPG 750.3.1.1.2.6 Other Bridges.

EPG 236.14.4.3 Submittal

9/20/18: Additional guidance is now available for district staff on when to include a Change in Route Marking Report.

EPG 236.5.25.4 Marketing Properties for Lease

9/20/18: Guidance has been added to permit a new clause in the lease.

Saw Cut Joints

8/31/18: Guidance in EPG 751.12.2.7 Joint Details, EPG 751.12.2.8 Plastic Waterstop and EPG H10. Barrier Curbs – Safety, Median, Type C and D was revised to allow saw cut joints for conventional-formed barrier curbs.

EPG 236.3.4.4 Advance Acquisition, State Funded Early Acquisition

8/27/17: Guidelines related to MAP-21 have been provided to bring guidance up to current practice.

EPG 106.9, When does Buy America apply to manufactured items?

8/16/18: Guidance has been added to EPG 106.9 Buy America Requirement clarifying when Buy America applies to manufactured items.

EPG 231.2 Clear Zones

8/14/18: Clear zone guidance has been clarified and associated figures have been updated.

LFD Bridge Seismic Design Process Flowchart

8/14/18: In EPG 756 Seismic Design, updated this flowchart to include, among other changes, new superstructure replacement guidance.

EPG 231.8 Bridge Width

8/13/18: EPG 231.8 is now coordinated with Green Book guidance that clear bridge widths shall be the same as the approach roadway widths for collectors, arterials and freeways.

EPG 806 Pollution, Erosion and Sediment Control

8/7/18: All of EPG 806 (except for EPG 806.8 SWPPP) has been completely rewritten to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.

Impact Attenuators and Sand Barrel Arrays

8/7/18: Sand barrel impact attenuator setup will now be based on the manufacturer's recommendations instead of MoDOT's standard plans. Work zone durations have been revised. New guidance clarifies when the flashing arrow panel and lights on the TMA should be active.

Work Zone Duration and TA-35 Mobile Operation

8/7/18: Guidance was clarified in EPG 616.7.2 Work Duration and EPG 616.23.2.6.1 Duration of Work about which traffic control devices are needed based on the work duration. TA-35 was updated to include an additional TMA with added guidance for which operations TA-35 can be used.

EPG 123.1.1 FHWA Oversight - National Highway System

7/27/18: Information for Projects of Division Interest (PoDI) has been updated for FY19.

EPG 237.14.3.6 Electronic Design Data for MoDOT Construction

7/25/18: Guidance was updated to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures were deleted.

EPG 618 Basis of Payment for Mobilization

6/29/18: New guidance clarifies how REs should administer payment for mobilization.

EPG 236.7.5.4 Acquisition from Conservation Commission and the University of Missouri

6/28/18: Comments about MoDOT acquiring property from the Univ. of MO and Dept. of Conservation were added.

EPG 238.2.17 Professional Land Surveyor Review

6/26/18: Guidance was clarified with current business practices.

Design of Elastomeric Bearings' Anchor Bolts

6/5/18: ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.

EPG 751.50 Standard Detailing Notes

6/1/18: Note B3.2 was clarified.

EPG 751.10.3 Bridge Deck Drainage - Slab Drains

5/24/18: Guidance now states the allowed slab drain color coatings.