Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 231.8)
m
(18 intermediate revisions by the same user not shown)
Line 30: Line 30:
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[231.8 Bridge Width|EPG 231.8 Bridge Width]]'''
+
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
  
8/13/18: EPG 231.8 is now coordinated with Green Book guidance that clear bridge widths shall be the same as the approach roadway widths for collectors, arterials and freeways.
+
10/12/18: Notes [[751.50 Standard Detailing Notes#(J1.12b)|J1.12b]], [[751.50 Standard Detailing Notes#(J1.21b)|J1.21b]] and [[751.50 Standard Detailing Notes#(J1.25)|J1.25A]] have been added. J1.25 was revised to clarify maximum applied bearing pressure limit.  
  
'''[[:Category:806 Pollution, Erosion and Sediment Control|EPG 806 Pollution, Erosion and Sediment Control]]'''
+
'''[[127.14 National Environmental Policy Act (NEPA) Classification and Documents|EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents]]'''
  
8/7/18: All of EPG 806 (except for [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 SWPPP]]) has been completely rewritten to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.
+
10/11/18: This article has been extensively revised to reflect current procedures.
  
'''[[:Category:612 Impact Attenuators|Impact Attenuators and Sand Barrel Arrays]]'''
+
'''[[106.3.2.88 TM-88 Bond Strength Test for Tack Coat|EPG 106.3.2.88 TM-88 Bond Strength Test for Tack Coat]]'''
  
8/7/18: Sand barrel impact attenuator setup will now be based on the manufacturer's recommendations instead of MoDOT's standard plans. Work zone durations have been revised.  New guidance clarifies when the flashing arrow panel and lights on the TMA should be active. 
+
10/10/18: This new Test Method is now available.
  
'''Work Zone Duration and TA-35 Mobile Operation'''
+
'''[[771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)|EPG 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)]]'''
  
8/7/18: Guidance was clarified in [[616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)#616.7.2 Work Duration (MUTCD 6G.02)|EPG 616.7.2 Work Duration]] and [[616.23 Traffic Control for Field Operations#616.23.2.6.1 Duration of Work|EPG 616.23.2.6.1 Duration of Work]] about which traffic control devices are needed based on the work duration.  [[media:616.8.35 MT.pdf|TA-35]] was updated to include an additional TMA with added guidance for which operations TA-35 can be used.   
+
10/10/18: This article has been re-titled. Also, the requirement for the formed underseal access hole for the concrete bridge approach slabs has been eliminated.   
  
'''[[:Category:123 Federal-Aid Highway Program#123.1.1 FHWA Oversight - National Highway System|EPG 123.1.1 FHWA Oversight - National Highway System]]'''
+
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Equipment Rental with Operator and Purchase Ordered Work|EPG 110.3 Equipment Rental with Operator and Purchase Ordered Work]]'''
  
7/27/18: Information for Projects of Division Interest (PoDI) has been updated for FY19.  
+
9/25/18: Guidance about which certified payrolls are required for rental equipment operators was clarified.
  
'''[[237.14 Electronic Design Data Delivery#237.14.3.6 Electronic Design Data for MoDOT Construction|EPG 237.14.3.6 Electronic Design Data for MoDOT Construction]]'''
+
'''Bridge Survey Checklist '''
  
7/25/18: Guidance was updated to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures were deleted.  
+
9/24/18: Guidance about the Bridge Survey Checklist was clarified in [[238.3 Route Surveying#238.3.36 Bridge Surveys|EPG 238.3.36 Bridge Surveys]], [[:Category:747 Bridge Reports and Layouts#747.2.2.1 Bridge Survey Report|EPG 747.2.2.1 Bridge Survey Report]], [[:Category:747 Bridge Reports and Layouts#747.2.3 Bridge Survey Sheet Data|EPG 747.2.3 Bridge Survey Sheet Data]], [[:Category:747 Bridge Reports and Layouts#747.2.3.4 Profile Sheets|EPG 747.2.3.4 Profile Sheets]] and [[750.3 Bridges#750.3.1.1.2.6 Other Bridges|EPG 750.3.1.1.2.6 Other Bridges]].
  
'''[[:Category:618 Mobilization#Basis of Payment for Mobilization (Per Sec 618.2 Basis of Payment)|EPG 618 Basis of Payment for Mobilization]]'''
+
'''[[236.14 Change in Route Status Report#236.14.4.3 Submittal|EPG 236.14.4.3 Submittal]]'''
  
6/29/18: New guidance clarifies how REs should administer payment for mobilization.
+
9/20/18: Additional guidance is now available for district staff on when to include a Change in Route Marking Report.
  
'''[[236.7 Negotiation#236.7.5.4 Acquisition from State of Missouri Agencies|EPG 236.7.5.4 Acquisition from Conservation Commission and the University of Missouri]]'''
+
'''[[236.5 Property Management#236.5.25.4 Marketing Properties for Lease|EPG 236.5.25.4 Marketing Properties for Lease]]'''
  
6/28/18: Comments about MoDOT acquiring property from the Univ. of MO and Dept. of Conservation were added.  
+
9/20/18: Guidance has been added to permit a new clause in the lease.
  
'''[[238.2 Land Surveying#238.2.17 Professional Land Surveyor Review|EPG 238.2.17 Professional Land Surveyor Review]]'''
+
'''Saw Cut Joints'''
  
6/26/18: Guidance was clarified with current business practices.  
+
8/31/18: Guidance in [[751.12 Protective Barriers#751.12.2.7 Joint Details|EPG 751.12.2.7 Joint Details]], [[751.12 Protective Barriers#751.12.2.8 Plastic Waterstop|EPG 751.12.2.8 Plastic Waterstop]] and [[751.50 Standard Detailing Notes#H10. Barrier Curbs – Safety, Median, Type C and D|EPG H10. Barrier Curbs – Safety, Median, Type C and D]] was revised to allow saw cut joints for conventional-formed barrier curbs.
  
'''[[751.11 Bearings#ASTM F1554 Grade 105 anchor bolts|Design of Elastomeric Bearings' Anchor Bolts]]'''  
+
'''[[236.3 Administration#State Funded Early Acquisition|EPG 236.3.4.4 Advance Acquisition, State Funded Early Acquisition]]'''
  
6/5/18: ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
+
8/27/17: Guidelines related to MAP-21 have been provided to bring guidance up to current practice.
  
'''[[751.50 Standard Detailing Notes#(B3.2)|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[106.9 Buy America Requirement#When does Buy America apply to manufactured items?|EPG 106.9, When does Buy America apply to manufactured items?]]'''
  
6/1/18: Note B3.2 was clarified.
+
8/16/18: Guidance has been added to [[106.9 Buy America Requirement|EPG 106.9 Buy America Requirement]] clarifying when Buy America applies to manufactured items.
  
'''[[751.10 General Superstructure#751.10.3.1 Type, Alignment and Spacing|EPG 751.10.3 Bridge Deck Drainage - Slab Drains]]'''
+
'''[[231.2 Clear Zones|EPG 231.2 Clear Zones]]'''
  
5/24/18: Guidance now states the allowed slab drain color coatings.
+
8/14/18: Clear zone guidance has been clarified and associated figures have been updated.
  
'''[[106.12 Pre-Acceptance Lists (PAL)#Upon receipt and review|EPG 106.12 PAL Material Arrival Confirmation]]'''
+
'''[[media:756 LFD flow chart.pdf|LFD Bridge Seismic Design Process Flowchart]]'''
  
5/22/18: Pre-Acceptance Identification Tag guidance was clarified to allow for identifying PAL material shipped to MoDOT projects.  
+
8/14/18: In [[:Category:756 Seismic Design|EPG 756 Seismic Design]], updated this flowchart to include, among other changes, new superstructure replacement guidance.
  
'''[[:Category:806 Pollution, Erosion and Sediment Control#Design Guidance|EPG 806.7 Temporary Erosion Control Blankets Design Guidance]]'''
+
'''[[231.8 Bridge Width|EPG 231.8 Bridge Width]]'''
  
5/17/18: The types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types based on the region, length of slope and the necessary blanket duration.  
+
8/13/18: EPG 231.8 is now coordinated with Green Book guidance that clear bridge widths shall be the same as the approach roadway widths for collectors, arterials and freeways.
  
'''2-loop and 3-loop Concrete Barriers'''  
+
'''[[:Category:806 Pollution, Erosion and Sediment Control|EPG 806 Pollution, Erosion and Sediment Control]]'''
  
5/17/18: In [[616.19 Quality Standards for Temporary Traffic Control Devices#2- and 3-Loop Type F|EPG 616.19.2.5 Temporary Traffic Barriers]] and [[617.2 Construction Inspection Guidelines for Sec 617#Temporary Concrete Traffic Barrier|EPG 617.2 Construction Inspection Guidelines for Sec 617]], guidance was clarified for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.  
+
8/7/18: All of EPG 806 (except for [[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 SWPPP]]) has been completely rewritten to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.
  
'''Design Agreements and Contracts'''
+
'''[[:Category:612 Impact Attenuators|Impact Attenuators and Sand Barrel Arrays]]'''
  
5/14/18: Those who need to review [[153.8 Design#DE43|DE43, DE44 and DE46-49]] prior to contractual execution has been updated.
+
8/7/18: Sand barrel impact attenuator setup will now be based on the manufacturer's recommendations instead of MoDOT's standard plans. Work zone durations have been revised.  New guidance clarifies when the flashing arrow panel and lights on the TMA should be active.
  
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Uniformed Services|Three new Federal Aid Projects Posters]]'''
+
'''Work Zone Duration and TA-35 Mobile Operation'''
  
5/11/18: Three new posters are required to be displayed on Federal-Aid project sites:  [http://epg.modot.mo.gov/forms/CM/27_USERRA.pdf Uniformed Services Employment and Reemployment Rights Act (USERRA)],
+
8/7/18:  Guidance was clarified in [[616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)#616.7.2 Work Duration (MUTCD 6G.02)|EPG 616.7.2 Work Duration]] and [[616.23 Traffic Control for Field Operations#616.23.2.6.1 Duration of Work|EPG 616.23.2.6.1 Duration of Work]] about which traffic control devices are needed based on the work duration. [[media:616.8.35 MT.pdf|TA-35]] was updated to include an additional TMA with added guidance for which operations TA-35 can be used.
[http://epg.modot.mo.gov/forms/CM/28e_Pay_Transparency.pdf Pay Transparency Nondiscrimination Provision (English)] and [http://epg.modot.mo.gov/forms/CM/29s_Pay_Transparency.pdf Pay Transparency Nondiscrimination Provision (Spanish)].
 
  
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#110.3.4 Missouri DOL Form PW-2|EPG 110.3.4 Missouri DOL Form PW-2]]'''
+
'''[[:Category:123 Federal-Aid Highway Program#123.1.1 FHWA Oversight - National Highway System|EPG 123.1.1 FHWA Oversight - National Highway System]]'''
  
5/9/18: New guidance agreed to by the DOL is now available about the DOL's PW-2 form.
+
7/27/18: Information for Projects of Division Interest (PoDI) has been updated for FY19.  
  
'''[[231.4 Shoulder Width#A minimum shy distance at least|EPG 231.4 Shoulder Width]]'''
+
'''[[237.14 Electronic Design Data Delivery#237.14.3.6 Electronic Design Data for MoDOT Construction|EPG 237.14.3.6 Electronic Design Data for MoDOT Construction]]'''
  
5/9/18: Guidance about guardrail placement from the edge of the shoulder was clarified.
+
7/25/18: Guidance was updated to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures were deleted.  
  
'''[[751.1 Preliminary Design#751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating|EPG 751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating]]'''
+
'''[[:Category:618 Mobilization#Basis of Payment for Mobilization (Per Sec 618.2 Basis of Payment)|EPG 618 Basis of Payment for Mobilization]]'''
  
5/3/18: New bridge preliminary design guidance for assessing asbestos and lead considerations for structure removal, rehabs and recoatings as well as how to address these considerations on the Bridge Memorandum.
+
6/29/18: New guidance clarifies how REs should administer payment for mobilization.
  
'''[[237.14 Electronic Design Data Delivery#237.14.3.6 Electronic Design Data for MoDOT Construction|EPG 237.14.3.6 Electronic Design Data for MoDOT Construction]]'''
+
'''[[236.7 Negotiation#236.7.5.4 Acquisition from State of Missouri Agencies|EPG 236.7.5.4 Acquisition from Conservation Commission and the University of Missouri]]'''
  
5/2/18: Guidance about the initial request for the Construction files has been clarified.
+
6/28/18: Comments about MoDOT acquiring property from the Univ. of MO and Dept. of Conservation were added.  
  
'''Outdoor Advertising'''
+
'''[[238.2 Land Surveying#238.2.17 Professional Land Surveyor Review|EPG 238.2.17 Professional Land Surveyor Review]]'''
  
4/30/18: Guidance in [[236.16 Outdoor Advertising#236.16.8.5 Vegetation Site Inspection|EPG 236.16.8.5 Vegetation Site Inspection]], [[236.16 Outdoor Advertising#236.16.15.4 Cutting of Vegetation|EPG 236.16.15.4 Cutting of Vegetation]],  [[236.16 Outdoor Advertising#236.16.15.6 Trimming of Trees|EPG 236.16.15.6 Trimming of Trees]] and [[236.16 Outdoor Advertising#236.16.15.9 Releasing a Vegetation Permit|EPG 236.16.15.9 Releasing a Vegetation Permit]] have been impacted by  Administrative Rule revisions.
+
6/26/18: Guidance was clarified with current business practices.  
  
'''[[102.2 Contractor Performance Rating System#102.2.7 Performance Discussion|EPG 102.2.7 Performance Discussion]]'''
+
'''[[751.11 Bearings#ASTM F1554 Grade 105 anchor bolts|Design of Elastomeric Bearings' Anchor Bolts]]'''  
  
4/27/18: Guidance for when certified mail is necessary for the Contractor Performance Rating has been updated.
+
6/5/18: ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
  
'''[[751.50 Standard Detailing Notes#(E2.27)|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[751.50 Standard Detailing Notes#(B3.2)|EPG 751.50 Standard Detailing Notes]]'''
  
4/25/18: A new standard detailing note about deviations in galvanized pile penetration is now available.
+
6/1/18: Note B3.2 was clarified.
  
'''[[903.4 Overhead Sign Mounting#The standard footing for steel and aluminum box truss|EPG 903.4.6 Span, Cantilever and Butterfly Box Trusses]]'''
+
'''[[751.10 General Superstructure#751.10.3.1 Type, Alignment and Spacing|EPG 751.10.3 Bridge Deck Drainage - Slab Drains]]'''
  
4/16/18: Guidance about drilled shaft footings has been clarified. MoDOT may be the designer of the footing and if not, others will have to submit signed and sealed drawings.
+
5/24/18: Guidance now states the allowed slab drain color coatings.

Revision as of 11:04, 12 October 2018

EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

EPG 751.50 Standard Detailing Notes

10/12/18: Notes J1.12b, J1.21b and J1.25A have been added. J1.25 was revised to clarify maximum applied bearing pressure limit.

EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents

10/11/18: This article has been extensively revised to reflect current procedures.

EPG 106.3.2.88 TM-88 Bond Strength Test for Tack Coat

10/10/18: This new Test Method is now available.

EPG 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)

10/10/18: This article has been re-titled. Also, the requirement for the formed underseal access hole for the concrete bridge approach slabs has been eliminated.

EPG 110.3 Equipment Rental with Operator and Purchase Ordered Work

9/25/18: Guidance about which certified payrolls are required for rental equipment operators was clarified.

Bridge Survey Checklist

9/24/18: Guidance about the Bridge Survey Checklist was clarified in EPG 238.3.36 Bridge Surveys, EPG 747.2.2.1 Bridge Survey Report, EPG 747.2.3 Bridge Survey Sheet Data, EPG 747.2.3.4 Profile Sheets and EPG 750.3.1.1.2.6 Other Bridges.

EPG 236.14.4.3 Submittal

9/20/18: Additional guidance is now available for district staff on when to include a Change in Route Marking Report.

EPG 236.5.25.4 Marketing Properties for Lease

9/20/18: Guidance has been added to permit a new clause in the lease.

Saw Cut Joints

8/31/18: Guidance in EPG 751.12.2.7 Joint Details, EPG 751.12.2.8 Plastic Waterstop and EPG H10. Barrier Curbs – Safety, Median, Type C and D was revised to allow saw cut joints for conventional-formed barrier curbs.

EPG 236.3.4.4 Advance Acquisition, State Funded Early Acquisition

8/27/17: Guidelines related to MAP-21 have been provided to bring guidance up to current practice.

EPG 106.9, When does Buy America apply to manufactured items?

8/16/18: Guidance has been added to EPG 106.9 Buy America Requirement clarifying when Buy America applies to manufactured items.

EPG 231.2 Clear Zones

8/14/18: Clear zone guidance has been clarified and associated figures have been updated.

LFD Bridge Seismic Design Process Flowchart

8/14/18: In EPG 756 Seismic Design, updated this flowchart to include, among other changes, new superstructure replacement guidance.

EPG 231.8 Bridge Width

8/13/18: EPG 231.8 is now coordinated with Green Book guidance that clear bridge widths shall be the same as the approach roadway widths for collectors, arterials and freeways.

EPG 806 Pollution, Erosion and Sediment Control

8/7/18: All of EPG 806 (except for EPG 806.8 SWPPP) has been completely rewritten to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.

Impact Attenuators and Sand Barrel Arrays

8/7/18: Sand barrel impact attenuator setup will now be based on the manufacturer's recommendations instead of MoDOT's standard plans. Work zone durations have been revised. New guidance clarifies when the flashing arrow panel and lights on the TMA should be active.

Work Zone Duration and TA-35 Mobile Operation

8/7/18: Guidance was clarified in EPG 616.7.2 Work Duration and EPG 616.23.2.6.1 Duration of Work about which traffic control devices are needed based on the work duration. TA-35 was updated to include an additional TMA with added guidance for which operations TA-35 can be used.

EPG 123.1.1 FHWA Oversight - National Highway System

7/27/18: Information for Projects of Division Interest (PoDI) has been updated for FY19.

EPG 237.14.3.6 Electronic Design Data for MoDOT Construction

7/25/18: Guidance was updated to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures were deleted.

EPG 618 Basis of Payment for Mobilization

6/29/18: New guidance clarifies how REs should administer payment for mobilization.

EPG 236.7.5.4 Acquisition from Conservation Commission and the University of Missouri

6/28/18: Comments about MoDOT acquiring property from the Univ. of MO and Dept. of Conservation were added.

EPG 238.2.17 Professional Land Surveyor Review

6/26/18: Guidance was clarified with current business practices.

Design of Elastomeric Bearings' Anchor Bolts

6/5/18: ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.

EPG 751.50 Standard Detailing Notes

6/1/18: Note B3.2 was clarified.

EPG 751.10.3 Bridge Deck Drainage - Slab Drains

5/24/18: Guidance now states the allowed slab drain color coatings.