Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751.1.3.4)
m (EPG 751.22.2.5)
(18 intermediate revisions by the same user not shown)
Line 30: Line 30:
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[751.1 Preliminary Design#3. If an existing wearing surface|EPG 751.1 Preliminary Design, Safety Barrier Curb (SBC) and Median Barrier Curb (MBC)]]'''
+
'''[[751.22 P/S Concrete I Girders#Calculation of camber (upward)|EPG 751.22.2.5 Deformations]]'''
  
2/8/19: Revision coordinates guidance with the FHWA requirement for new wearing surfaces.
+
4/22/19: Guidance was clarified, particularly in "calculation of camber (upward)","calculations of deflections (downward)" and "creep coefficient".
  
'''[[147.3 Job Order Contracting (JOC)#147.3.9 Change Order Approvals|EPG 147.3.9 Change Order Approvals]]'''
+
'''[[106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators|EPG 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators]]'''
  
1/28/19: EPG 147.3.9 was rewritten and retitled to provide new Change Order guidance for JOCs.
+
4/11/19: This new Test Method is now available.
  
'''Asphalt Shoulder Surface Mix'''
+
'''[[106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)|EPG 106.3.2.89 TM-89, Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)]]'''
  
1/25/19: Guidance in [[Other Aspects of Pavement Design#For resurfacing projects on roadways with shoulders 4|EPG Shoulder Surface]] was revised so that all shoulders 4 ft. and narrower, and when shoulder improvements are also anticipated as part of the scope of work, will be monolithically resurfaced with the same type of asphaltic mix used on the mainline roadway.
+
4/10/18: This new Test Method is now available.  
  
'''[[413.3 Ultrathin Bonded Asphalt Wearing Surface#413.3.3 Maintenance Surface Treatment|EPG 413.3.3 Maintenance Surface Treatment]]'''
+
'''[[236.13 Designing Right of Way Plans#236.13.13 Plan Submittal and Filing|EPG 236.13.13 Plan Submittal and Filing]]'''
  
1/25/19: The UBAWS Treatment policy was clarified, including the identification of the proper thicknesses for UBAWS types.
+
4/5/19: Guidance now permits an Asst. District Engineer to approve Right of Way plans.
  
'''[[751.22 P/S Concrete I Girders#751.22.3.13 Intermediate Diaphragms|EPG 751.22.3.13 Intermediate Diaphragms]]'''
+
'''Steel Girder Galvanizing Procedure'''
  
1/11/19: Guidance about the spacing of steel intermediate diaphragms for PSI girders was revised to include NU girders.  
+
3/27/19: Guidance was added in [[751.50 Standard Detailing Notes#(A4a1.8.1) Place|EPG 751.50 Standard Detailing Notes for Nonweathering Steel Structures]] and [[751.14 Steel Superstructure #Galvanized nonweathering structural|EPG 751.14.5.8 Protective Coating Requirements]] to clarify steel girder galvanizing procedure.
  
'''[[751.50 Standard Detailing Notes#(A3.5.1) Use when uncoated steel|Standard Detailing Note A3.5.1]]'''
+
'''[[:Category:403 Asphaltic Concrete Pavement#Rice Test|Superpave Rice Testing Frequency]]'''
  
1/11/19: A new note for uncoated steel coming in contact with galvanized piles is now available.
+
3/21/19: Guidance about the frequency for rice dry-back testing when sample results are very consistent was corrected to one every fourth sublot.
  
'''[[127.25 Maintenance Environmental Policies#127.25.2 Hazardous Material Spills|EPG 127.25.2 Hazardous Material Spills]]'''
+
'''[[media:152.pdf|Bonds - What They Are and How They Work]]'''
  
1/10/19: Guidance has been updated to current practice.
+
3/15/19: This new tutorial is now displayed in [[:Category:152 Contactor Bonding Responsibilities|EPG 152 Contactor Bonding Responsibilities]].
  
'''[[:Category:903 Highway Signing#Guidance for Using Sign Management System (SMS)|Guidance for Using Sign Management System]] and [[903.3 Post-Mounted Signing#903.3.16 Ordering Signs|EPG 903.3.16 Ordering Signs]]'''
+
'''[[910.3 Dynamic Message Signs (DMS)|EPG 910.3 Dynamic Message Signs]]'''
  
1/9/19: Guidance has been updated to current practices. New guidance for the use of the Sign Management System is now available. 
+
3/14/19: New types of DMSs are now referenced as a good portion of this article was updated.
  
'''[[236.3 Administration#The District Right of Way Manager|EPG 236.3.7 Right of Way Clearance Certification]]'''
+
'''Ephemeral Streams'''
  
1/8/19: Added guidance for the RW clearance process for projects programmed in the STIP with RW funding but that do not require RW to construct the project.  
+
3/12/19: Guidance in [[750.7 Non-Hydraulic Considerations#750.7.3.1 Embedment Requirements|EPG 750.7.3.1 Embedment Requirements]] was updated with a minor note stating the Corps of Engineers must validate whether a stream is "ephemeral".
  
'''[[:Category:121 Project Planning, Prioritization and STIP Commitments|EPG 121 Project Planning, Prioritization and STIP Commitments]]'''
+
'''[[236.7 Negotiation#236.7.2.3 Prompt Offer of Just Compensation|EPG 236.7.2.3 Prompt Offer of Just Compensation]]'''
  
1/4/19: Guidance has been updated to current practice. EPG 121.2 The Planning Process and EPG 121.5 Prioritization Factors were both re-written and re-titled as [[121.2 The Planning Framework for Transportation Decision-Making|EPG 121.2 The Planning Framework for Transportation Decision-Making]] and [[121.5 Asset Management|EPG 121.5 Asset Management]], respectively.
+
3/6/19: Guidance was clarified to allow the minimum offer to be reduced if approved by the Asst. to State Design Engineer – Right of Way.
  
'''[[910.4 ITS Achitecture#Project ITS Architecture Documentations Requirements|EPG 910.4 ITS Achitecture]]
+
'''[[616.16 Law Enforcement Services#616.16.1 Guidelines for Providing Law Enforcement Services|EPG 616.16.1 Guidelines for Providing Law Enforcement Services]]'''
  
1/3/19: New guidance on completing a systems engineering analysis on all ITS projects is now available.
+
3/1/19: Guidelines were clarified to provide a more standardized process.
  
'''Weathering Steel'''
+
'''[[236.16 Outdoor Advertising|EPG 236.16 Outdoor Advertising]]'''
  
12/28/18: Guidance for the use of weathering steel has been added to [[751.1 Preliminary Design#Weathering steel may be used|EPG 751.1.2.9 Girder Type Selection]].
+
3/1/19: Several ODA policies were updated to current practice, especially in [[236.16 Outdoor Advertising#236.16.22 Monthly Reports|EPG 236.16.22 Monthly Reports]].
  
'''[[:Category:235 Preliminary Plans#The district completes an electronic|EPG 235.6 Approval of Preliminary Plan]]'''
+
'''[[121.5 Asset Management|EPG 121.5 Asset Management]]'''
  
12/28/18: The district now completes an RES at each project development milestone, or at least at the Location/Conceptual state and final design.  
+
2/27/19: Guidance has been revised to coordinate with current practice.
  
'''The “DBE Termination, Substitution or Additional Request” Form'''
+
'''[[147.3 Job Order Contracting (JOC)#If the option for extending the contract|EPG 147.3.5 Term Extension of Job Order Contracts]]'''
  
12/18/18: Guidance in [[:Category:108 Prosecution and Progress#2. For DBE requests,|EPG 108.1.1 Review and Approval of a Subcontract Request]] and [[:Category:108 Prosecution and Progress#Once a project is awarded,|EPG 108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting]] was clarified on the use of this form when a prime contractor proposes to terminate, substitute or add an additional DBE.
+
2/25/19: Guidance about providing a reason for extending the contract has been added.
  
'''[[127.1 Request for Environmental Services|EPG 127.1 Request for Environmental Services]]'''
+
'''[[806.1 Erosion Control Measures#806.1.7.2 Construction Considerations|EPG 806.1.7.2 Construction Considerations]]'''
  
12/12/18: Guidance regarding submittals of a final RES and the requirement of only 1 RES for some projects has been updated.
+
2/22/19: Guidance about erosion control for temporary pipe and temporary construction crossings was clarified.
  
'''TMA Light Bar'''
+
'''New QRG'''
  
12/11/18: Guidance in [[:Category:612 Impact Attenuators#612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting|EPG 612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting]] and [[616.27 Fleet Lighting#616.27.1.1 Fleet Lighting Levels|EPG 616.27.1.1 Fleet Lighting Levels, Level 5]] has been updated to state that the Light Bar may be used and the Emergency Alert lights should be used on the Rear Advanced Warning Truck for striping and sweeping operations.  TA-35 MT and TA-35a-d MT were also updated.  
+
2/14/19: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Adding_Concrete_Mix_Design.doc AWP MA Adding New Concrete Mix Design] QRG is now available.
  
'''[[media:104.7 EngFac SFY 16 to 18.pdf|Engineering Factors Report]]'''
+
'''[[media:134.2.2.2.docx|Solicitation and Request Letter]]'''
  
12/10/18: The latest version of the Engineering Factors Report, providing SFY 2016 to SFY 2018 info, is now presented in [[104.7 Estimates|EPG 104.7 Estimates]].  
+
2/13/19: The Solicitation and Request letter has been updated.
  
'''[[413.6 Scrub Seal Treatment|EPG 413.6 Scrub Seal Treatment]]'''
+
'''[[751.1 Preliminary Design#3. If an existing wearing surface|EPG 751.1 Preliminary Design, Safety Barrier Curb (SBC) and Median Barrier Curb (MBC)]]'''
  
12/10/18: Scrub seal treatment guidance is now available.
+
2/8/19: Revision coordinates guidance with the FHWA requirement for new wearing surfaces.
  
'''AASHTOWare Project Quick Reference Guides'''
+
'''[[147.3 Job Order Contracting (JOC)#147.3.9 Change Order Approvals|EPG 147.3.9 Change Order Approvals]]'''
  
12/10/18: [http://epg.modot.org/index.php/Category:101_Standard_Forms#AASHTOWare_Project_Quick_Reference_Guides_.28QRGs.29 AASHTOWare Project Quick Reference Guides] are now available in EPG 101 Standard Forms.  
+
1/28/19: EPG 147.3.9 was rewritten and retitled to provide new Change Order guidance for JOCs.
  
'''[[127.9 Floodplain Management and the Regulatory Floodway#127.9.2 Process|EPG 127.9.2 Process]]'''
+
'''Asphalt Shoulder Surface Mix'''
  
12/4/18: Guidance to adhere to CFR 650.111 was added to the bottom of EPG 127.9.2.
+
1/25/19: Guidance in [[Other Aspects of Pavement Design#For resurfacing projects on roadways with shoulders 4|EPG Shoulder Surface]] was revised so that all shoulders 4 ft. and narrower, and when shoulder improvements are also anticipated as part of the scope of work, will be monolithically resurfaced with the same type of asphaltic mix used on the mainline roadway.
  
'''[[127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents#127.15.3 Document Age|EPG 127.15.3 Document Age]]'''
+
'''[[413.3 Ultrathin Bonded Asphalt Wearing Surface#413.3.3 Maintenance Surface Treatment|EPG 413.3.3 Maintenance Surface Treatment]]'''
  
11/30/18: Re-evaluations are required for all NEPA approvals that are more than 3 years old.
+
1/25/19: The UBAWS Treatment policy was clarified, including the identification of the proper thicknesses for UBAWS types.
  
'''NEPA Glossary'''
+
'''[[751.22 P/S Concrete I Girders#751.22.3.13 Intermediate Diaphragms|EPG 751.22.3.13 Intermediate Diaphragms]]'''
  
11/29/18: A new [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.5 NEPA Glossary|glossary of NEPA terms]] is now available in EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents.
+
1/11/19: Guidance about the spacing of steel intermediate diaphragms for PSI girders was revised to include NU girders.  
  
'''[[236.16 Outdoor Advertising#236.16.15 Vegetation Removal|EPG 236.16.15 Vegetation Removal]]'''
+
'''[[751.50 Standard Detailing Notes#(A3.5.1) Use when uncoated steel|Standard Detailing Note A3.5.1]]'''
  
11/28/18: Guidance was updated, particularly in [[236.16 Outdoor Advertising#236.16.15.6 Endangered Species Act|EPG 236.16.15.6 Endangered Species Act]] and [[236.16 Outdoor Advertising#236.16.15.8 Mowing and Brush Hogging|EPG 236.16.15.8 Mowing and Brush Hogging]], to be in line with the Endangered Species Act
+
1/11/19: A new note for uncoated steel coming in contact with galvanized piles is now available.
  
'''[[141.1 Cost Share Program|EPG 141.1 Cost Share Program]]'''
+
'''[[127.25 Maintenance Environmental Policies#127.25.2 Hazardous Material Spills|EPG 127.25.2 Hazardous Material Spills]]'''
  
11/20/18: Guidance in EPG 141.1 Cost Share Program has been updated as approved by the Commission. The revisions will impact the program statewide.
+
1/10/19: Guidance has been updated to current practice.
  
'''[[236.4 Description Writing and Titles#Permanent Sidewalk Easement Clause|Permanent Sidewalk Easement Clause]]'''
+
'''[[:Category:903 Highway Signing#Guidance for Using Sign Management System (SMS)|Guidance for Using Sign Management System]] and [[903.3 Post-Mounted Signing#903.3.16 Ordering Signs|EPG 903.3.16 Ordering Signs]]'''
  
11/19/18: In [[#236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions|EPG 236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions]], a permanent sidewalk easement clause is now available for districts' use.
+
1/9/19: Guidance has been updated to current practices. New guidance for the use of the Sign Management System is now available. 

Revision as of 13:44, 22 April 2019

EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

EPG 751.22.2.5 Deformations

4/22/19: Guidance was clarified, particularly in "calculation of camber (upward)","calculations of deflections (downward)" and "creep coefficient".

EPG 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators

4/11/19: This new Test Method is now available.

EPG 106.3.2.89 TM-89, Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)

4/10/18: This new Test Method is now available.

EPG 236.13.13 Plan Submittal and Filing

4/5/19: Guidance now permits an Asst. District Engineer to approve Right of Way plans.

Steel Girder Galvanizing Procedure

3/27/19: Guidance was added in EPG 751.50 Standard Detailing Notes for Nonweathering Steel Structures and EPG 751.14.5.8 Protective Coating Requirements to clarify steel girder galvanizing procedure.

Superpave Rice Testing Frequency

3/21/19: Guidance about the frequency for rice dry-back testing when sample results are very consistent was corrected to one every fourth sublot.

Bonds - What They Are and How They Work

3/15/19: This new tutorial is now displayed in EPG 152 Contactor Bonding Responsibilities.

EPG 910.3 Dynamic Message Signs

3/14/19: New types of DMSs are now referenced as a good portion of this article was updated.

Ephemeral Streams

3/12/19: Guidance in EPG 750.7.3.1 Embedment Requirements was updated with a minor note stating the Corps of Engineers must validate whether a stream is "ephemeral".

EPG 236.7.2.3 Prompt Offer of Just Compensation

3/6/19: Guidance was clarified to allow the minimum offer to be reduced if approved by the Asst. to State Design Engineer – Right of Way.

EPG 616.16.1 Guidelines for Providing Law Enforcement Services

3/1/19: Guidelines were clarified to provide a more standardized process.

EPG 236.16 Outdoor Advertising

3/1/19: Several ODA policies were updated to current practice, especially in EPG 236.16.22 Monthly Reports.

EPG 121.5 Asset Management

2/27/19: Guidance has been revised to coordinate with current practice.

EPG 147.3.5 Term Extension of Job Order Contracts

2/25/19: Guidance about providing a reason for extending the contract has been added.

EPG 806.1.7.2 Construction Considerations

2/22/19: Guidance about erosion control for temporary pipe and temporary construction crossings was clarified.

New QRG

2/14/19: The new AWP MA Adding New Concrete Mix Design QRG is now available.

Solicitation and Request Letter

2/13/19: The Solicitation and Request letter has been updated.

EPG 751.1 Preliminary Design, Safety Barrier Curb (SBC) and Median Barrier Curb (MBC)

2/8/19: Revision coordinates guidance with the FHWA requirement for new wearing surfaces.

EPG 147.3.9 Change Order Approvals

1/28/19: EPG 147.3.9 was rewritten and retitled to provide new Change Order guidance for JOCs.

Asphalt Shoulder Surface Mix

1/25/19: Guidance in EPG Shoulder Surface was revised so that all shoulders 4 ft. and narrower, and when shoulder improvements are also anticipated as part of the scope of work, will be monolithically resurfaced with the same type of asphaltic mix used on the mainline roadway.

EPG 413.3.3 Maintenance Surface Treatment

1/25/19: The UBAWS Treatment policy was clarified, including the identification of the proper thicknesses for UBAWS types.

EPG 751.22.3.13 Intermediate Diaphragms

1/11/19: Guidance about the spacing of steel intermediate diaphragms for PSI girders was revised to include NU girders.

Standard Detailing Note A3.5.1

1/11/19: A new note for uncoated steel coming in contact with galvanized piles is now available.

EPG 127.25.2 Hazardous Material Spills

1/10/19: Guidance has been updated to current practice.

Guidance for Using Sign Management System and EPG 903.3.16 Ordering Signs

1/9/19: Guidance has been updated to current practices. New guidance for the use of the Sign Management System is now available.