Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 910.4.1.2)
m (EPG 127.25.1.7)
(48 intermediate revisions by the same user not shown)
Line 14: Line 14:
  
  
 +
{|style="padding: 0.3em; border:2px solid #696969; color: #000; text-align:center; font-size: 100%; background:#f5f5f5" width="1030px" align="center"
 +
|-
 +
|'''<Big>Our mission is to provide a world-class transportation system that is safe, innovative, reliable<br/>and dedicated to a prosperous Missouri.'''
 +
|}
 +
 +
 +
{|style="padding: 0.3em; border:1px solid #696969; color: #000; text-align:center; font-size: 100%; background:#A9A9A9" width="1000px" align="center"
 +
|-
 +
!<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 +
|}
 +
{|style="padding: 0.3em; border:1px solid #696969; color: #000; text-align:left; font-size: 100%; background:#F8F8FF" width="1000px" align="center"
 +
|-
 +
|MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>
 +
Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/mt/default.aspx Maintenance], [http://sp/sites/tp/Pages/default.aspx Planning], [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way] and [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] guidance.
 +
|}
  
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"  
 
{| cellspacing="3"  
|- valign="top" width="100%"
+
| valign="top" width="100%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
 
|-
 
|-
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
 
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised.  Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry. 
 
 
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] and [http://sharepoint/systemdelivery/mt/default.aspx Maintenance] manuals. 
 
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.
 
 
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[910.4 ITS Achitecture#Project ITS Architecture Documentations Requirements|EPG 910.4 ITS Achitecture]]
+
'''[[127.25 Maintenance Environmental Policies#127.25.1.7 Disposal of Animal Carcasses|EPG 127.25.1.7 Disposal of Animal Carcasses]]'''
  
1/3/19: New guidance on completing a systems engineering analysis on all ITS projects is now available.
+
6/14/19: Updated guidance to match current practice, which has been coordinated with MO Dept. of Conservation.
  
'''Weathering Steel'''
+
'''[[750.7 Non-Hydraulic Considerations#750.7.3 Environmental Requirements|EPG 750.7.3 Environmental Requirements]]'''
  
12/28/18: Guidance for the use of weathering steel has been added to [[751.1 Preliminary Design#Weathering steel may be used|EPG 751.1.2.9 Girder Type Selection]].
+
6/14/19: Expanded guidance, especially in the new [[750.7 Non-Hydraulic Considerations#750.7.3.1 Stream Classifications|EPG 750.7.3.1 Stream Classifications]], clarified our process to meet the Corps' requirements for their "Regional Condition".  
  
'''[[:Category:235 Preliminary Plans#The district completes an electronic|EPG 235.6 Approval of Preliminary Plan]]'''
+
'''[[236.7 Negotiation#236.7.2.9 Negotiation Procedures|EPG 236.7.2.9 Negotiation Procedures]] and [[236.7 Negotiation#236.7.7.3 Taxpayer Identification Numbers|EPG 236.7.7.3 Taxpayer Identification Numbers]]'''
  
12/28/18: The district now completes an RES at each project development milestone, or at least at the Location/Conceptual state and final design.  
+
6/4/19: Guidance has been updated to reflect that the IRS Form W-9 is no longer needed.
  
'''The “DBE Termination, Substitution or Additional Request” Form'''
+
'''[[751.50 Standard Detailing Notes#(E2.26)|Standard Detailing Note]]'''
  
12/18/18: Guidance in [[:Category:108 Prosecution and Progress#2. For DBE requests,|EPG 108.1.1 Review and Approval of a Subcontract Request]] and [[:Category:108 Prosecution and Progress#Once a project is awarded,|EPG 108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting]] was clarified on the use of this form when a prime contractor proposes to terminate, substitute or add an additional DBE.
+
5/31/19: The commentary for Note E2.26 was clarified.  In the note itself, additional options were provided for piling minimum nominal axial compressive resistance.
  
'''[[127.1 Request for Environmental Services|EPG 127.1 Request for Environmental Services]]'''
+
'''[[:Category:130 Value Engineering|EPG 130 Value Engineering]]'''
  
12/12/18: Guidance regarding submittals of a final RES and the requirement of only 1 RES for some projects has been updated.
+
5/28/19: New guidance is now available for [[:Category:130 Value Engineering#130.3 Post-Award Value Engineering (PAVE)|Post-Award Value Engineering (PAVE)]] workshops, processes and project selections.
  
'''TMA Light Bar'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations|Figs. 616.6.87.1 Rumble Strip Placement in Flagging and 616.6.87.2 Rumble Strip Placement on a Divided Highway]]'''
  
12/11/18: Guidance in [[:Category:612 Impact Attenuators#612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting|EPG 612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting]] and [[616.27 Fleet Lighting#616.27.1.1 Fleet Lighting Levels|EPG 616.27.1.1 Fleet Lighting Levels, Level 5]] has been updated to state that the Light Bar may be used and the Emergency Alert lights should be used on the Rear Advanced Warning Truck for striping and sweeping operations.  TA-35 MT and TA-35a-d MT were also updated.  
+
5/28/19: The spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness.
  
'''[[media:104.7 EngFac SFY 16 to 18.pdf|Engineering Factors Report]]'''
+
'''Median Crossover on a Divided Highway, TA-39'''
  
12/10/18: The latest version of the Engineering Factors Report, providing SFY 2016 to SFY 2018 info, is now presented in [[104.7 Estimates|EPG 104.7 Estimates]].  
+
5/28/19: In [[616.8 Typical Applications (MUTCD 6H)#Listing of Typical Applications for Design and Construction and Materials|EPG 616.8 Typical Applications]], TA-39 for Design and Construction was revised to require Directional Indicator Barricades for tapers. The concrete barrier has been removed on sheet 2. Instead of the concrete barrier, an approved, temporary and crashworthy device can be used.
  
'''[[413.6 Scrub Seal Treatment|EPG 413.6 Scrub Seal Treatment]]'''
+
'''[[media:Fig 237.6.docx|Costs for Non-Contractual Items]]'''
  
12/10/18: Scrub seal treatment guidance is now available.
+
5/21/19: The most recent costs for non-contractual items is now presented in [[237.6 Estimates|EPG 237.6 Estimates]].
  
'''AASHTOWare Project Quick Reference Guides'''
+
'''Pile Design'''
  
12/10/18: [http://epg.modot.org/index.php/Category:101_Standard_Forms#AASHTOWare_Project_Quick_Reference_Guides_.28QRGs.29 AASHTOWare Project Quick Reference Guides] are now available in EPG 101 Standard Forms.  
+
5/17/19: Guidance for pile design procedure was clarified in several articles including [[:Category:702 Load-Bearing Piles|EPG 702 Load-Bearing Piles]], [[751.1 Preliminary Design#751.1.2.23 Types of Piling|EPG 751.1.2.23 Types of Piling]], [[751.3 Structural Steel Design Properties|EPG 751.3 Structural Steel Design Properties]] and [[751.36 Driven Piles|EPG 751.36 Driven Piles]].
  
'''[[127.9 Floodplain Management and the Regulatory Floodway#127.9.2 Process|EPG 127.9.2 Process]]'''
+
'''[[237.14 Electronic Design Data Delivery#237.14.2.9 Proposed 3D Top Surface Linear Features|EPG 237.14.2.9 Proposed 3D Top Surface Linear Features]]'''
  
12/4/18: Guidance to adhere to CFR 650.111 was added to the bottom of EPG 127.9.2.
+
5/10/19: This new guidance is for districts to be able to provide consultants with needed technical information.
  
'''[[127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents#127.15.3 Document Age|EPG 127.15.3 Document Age]]'''
+
'''[[236.3 Administration#236.3.5 Right of Way Expenditures|EPG 236.3.5 Right of Way Expenditures]] and [[236.7 Negotiation#236.7.7 1099 Reporting of Acquisitions|EPG 236.7.7 1099 Reporting of Acquisitions]]'''
  
11/30/18: Re-evaluations are required for all NEPA approvals that are more than 3 years old.
+
4/30/19: Guidance has been updated to current practice.
  
'''NEPA Glossary'''
+
'''[[236.16 Outdoor Advertising#236.16.18.1 Informal Hearing|EPG 236.16.18.1 Informal Hearing]]'''
  
11/29/18: A new [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.5 NEPA Glossary|glossary of NEPA terms]] is now available in EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents.
+
4/24/19: The membership constituting the ODA Informal Hearing Review Committee was updated.
  
'''[[236.16 Outdoor Advertising#236.16.15 Vegetation Removal|EPG 236.16.15 Vegetation Removal]]'''
+
'''[[751.22 P/S Concrete I Girders#Calculation of camber (upward)|EPG 751.22.2.5 Deformations]]'''
  
11/28/18: Guidance was updated, particularly in [[236.16 Outdoor Advertising#236.16.15.6 Endangered Species Act|EPG 236.16.15.6 Endangered Species Act]] and [[236.16 Outdoor Advertising#236.16.15.8 Mowing and Brush Hogging|EPG 236.16.15.8 Mowing and Brush Hogging]], to be in line with the Endangered Species Act
+
4/22/19: Guidance was clarified, particularly in "calculation of camber (upward)","calculations of deflections (downward)" and "creep coefficient".
  
'''[[141.1 Cost Share Program|EPG 141.1 Cost Share Program]]'''
+
'''[[106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators|EPG 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators]]'''
  
11/20/18: Guidance in EPG 141.1 Cost Share Program has been updated as approved by the Commission. The revisions will impact the program statewide.
+
4/11/19: This new Test Method is now available.
  
'''[[236.4 Description Writing and Titles#Permanent Sidewalk Easement Clause|Permanent Sidewalk Easement Clause]]'''
+
'''[[106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)|EPG 106.3.2.89 TM-89, Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)]]'''
  
11/19/18: In [[#236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions|EPG 236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions]], a permanent sidewalk easement clause is now available for districts' use.
+
4/10/18: This new Test Method is now available.  
  
'''[[:Category:105 Control of Work#Among subjects to be discussed|EPG 105.9.12 Preconstruction Conference]]'''
+
'''[[236.13 Designing Right of Way Plans#236.13.13 Plan Submittal and Filing|EPG 236.13.13 Plan Submittal and Filing]]'''
  
11/15:18: Subjects to be discussed at this conference now include review of the process to request any DBE termination, substitution or addition.
+
4/5/19: Guidance now permits an Asst. District Engineer to approve Right of Way plans.
  
'''[[237.9 Submission of Plans and Supporting Documents#237.9.3.1 Schedule for Submittal|EPG 237.9.3.1 Schedule for Submittal]]'''
+
'''Steel Girder Galvanizing Procedure'''
  
11/7/18: Guidance has been added about a required e-mail for re-let or moved projects.
+
3/27/19: Guidance was added in [[751.50 Standard Detailing Notes#(A4a1.8.1) Place|EPG 751.50 Standard Detailing Notes for Nonweathering Steel Structures]] and [[751.14 Steel Superstructure #Galvanized nonweathering structural|EPG 751.14.5.8 Protective Coating Requirements]] to clarify steel girder galvanizing procedure.
  
'''[[:Category:604 Miscellaneous Drainage#Concrete Headwalls, Drop Inlets And Manholes (Sec 604.10)|EPG 604, Construction Requirements (Sec 604.10.3)]]'''
+
'''[[:Category:403 Asphaltic Concrete Pavement#Rice Test|Superpave Rice Testing Frequency]]'''
  
10/30/18: When approached with alternative products on a job as part of a change order or VE, this new guidance states that the RE should initially determine suitability and also consult the Field Office and New Products Coordinator to ensure value, uniformity and tracking.   
+
3/21/19: Guidance about the frequency for rice dry-back testing when sample results are very consistent was corrected to one every fourth sublot.   
  
'''[[media:703.2.8 Placing Diaphragm Concrete.pdf|Placing Diaphragm Concrete]]'''
+
'''[[media:152.pdf|Bonds - What They Are and How They Work]]'''
  
10/25/18: In [[:Category:703 Concrete Masonry Construction#A construction joint will normally be provided|EPG 703.2.8 Concrete Placement]], this new presentation explains a MoDOT best practice.
+
3/15/19: This new tutorial is now displayed in [[:Category:152 Contactor Bonding Responsibilities|EPG 152 Contactor Bonding Responsibilities]].
  
'''[[:Category:626 Rumble Strips|EPG 626 Rumble Strips]]'''
+
'''[[910.3 Dynamic Message Signs (DMS)|EPG 910.3 Dynamic Message Signs]]'''
  
10/23/18: Clarified the location of the rumbles strips and pavement markings for differing shoulder and pavement conditions. The minimum pavement thickness was revised from from 1 3/4" to 1".
+
3/14/19: New types of DMSs are now referenced as a good portion of this article was updated.
  
'''[[106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs|EPG 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs]]'''
+
'''Ephemeral Streams'''
  
10/23/18: This new test method corresponds to the spec change in Sec 613 that allows this alternate test method.
+
3/12/19: Guidance in [[750.7 Non-Hydraulic Considerations#750.7.3.1 Embedment Requirements|EPG 750.7.3.1 Embedment Requirements]] was updated with a minor note stating the Corps of Engineers must validate whether a stream is "ephemeral".
  
'''Prestressed Concrete I Girders'''
+
'''[[236.7 Negotiation#236.7.2.3 Prompt Offer of Just Compensation|EPG 236.7.2.3 Prompt Offer of Just Compensation]]'''
  
10/23/18: NU 78 details were placed back into [[751.22 P/S Concrete I Girders#NU Standard Girders|EPG 751.22.1.2 Geometric Dimensions]], [[751.22 P/S Concrete I Girders#751.22.3.9 Open Intermediate Bent Diaphragms|EPG 751.22.3.9 Open Intermediate Bent Diaphragms]] and [[751.22 P/S Concrete I Girders#751.22.3.10 Closed Intermediate Bent Diaphragms|EPG 751.22.3.10 Closed Intermediate Bent Diaphragms]]. [[751.22 P/S Concrete I Girders#751.22.3.3.2 Top Flange Blockout|NU flange blockout guidance]] was also added and concrete diaphragm details were clarified.
+
3/6/19: Guidance was clarified to allow the minimum offer to be reduced if approved by the Asst. to State Design Engineer – Right of Way.
  
'''Bending Diagrams'''
+
'''[[616.16 Law Enforcement Services#616.16.1 Guidelines for Providing Law Enforcement Services|EPG 616.16.1 Guidelines for Providing Law Enforcement Services]]'''
  
10/16/18: In [[751.12 Protective Barriers#751.12.2.3 End Bent Reinforcement|EPG 751.12.2.3 End Bent Reinforcement]], the bending diagrams were revised to accommodate safety barrier reinforcement. A reinforcing clearance note in [[751.50 Standard Detailing Notes#Place general notes H10.19,|H10a. Conventional-Formed Barrier standard notes]] was added to avoid possible confusion when placing barrier reinforcement at end bents.
+
3/1/19: Guidelines were clarified to provide a more standardized process.
  
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
+
'''[[236.16 Outdoor Advertising|EPG 236.16 Outdoor Advertising]]'''
  
10/12/18: Notes [[751.50 Standard Detailing Notes#(J1.12b)|J1.12b]], [[751.50 Standard Detailing Notes#(J1.21b)|J1.21b]] and [[751.50 Standard Detailing Notes#(J1.25)|J1.25A]] have been added. J1.25 was revised to clarify maximum applied bearing pressure limit.  
+
3/1/19: Several ODA policies were updated to current practice, especially in [[236.16 Outdoor Advertising#236.16.22 Monthly Reports|EPG 236.16.22 Monthly Reports]].
  
'''[[127.14 National Environmental Policy Act (NEPA) Classification and Documents|EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents]]'''
+
'''[[121.5 Asset Management|EPG 121.5 Asset Management]]'''
  
10/11/18: This article has been extensively revised to reflect current procedures.
+
2/27/19: Guidance has been revised to coordinate with current practice.

Revision as of 12:46, 14 June 2019

EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


Our mission is to provide a world-class transportation system that is safe, innovative, reliable
and dedicated to a prosperous Missouri.


WELCOME
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.

Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Maintenance, Planning, Right of Way and Traffic guidance.

RECENT POLICY CHANGES IN THE EPG

EPG 127.25.1.7 Disposal of Animal Carcasses

6/14/19: Updated guidance to match current practice, which has been coordinated with MO Dept. of Conservation.

EPG 750.7.3 Environmental Requirements

6/14/19: Expanded guidance, especially in the new EPG 750.7.3.1 Stream Classifications, clarified our process to meet the Corps' requirements for their "Regional Condition".

EPG 236.7.2.9 Negotiation Procedures and EPG 236.7.7.3 Taxpayer Identification Numbers

6/4/19: Guidance has been updated to reflect that the IRS Form W-9 is no longer needed.

Standard Detailing Note

5/31/19: The commentary for Note E2.26 was clarified. In the note itself, additional options were provided for piling minimum nominal axial compressive resistance.

EPG 130 Value Engineering

5/28/19: New guidance is now available for Post-Award Value Engineering (PAVE) workshops, processes and project selections.

Figs. 616.6.87.1 Rumble Strip Placement in Flagging and 616.6.87.2 Rumble Strip Placement on a Divided Highway

5/28/19: The spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness.

Median Crossover on a Divided Highway, TA-39

5/28/19: In EPG 616.8 Typical Applications, TA-39 for Design and Construction was revised to require Directional Indicator Barricades for tapers. The concrete barrier has been removed on sheet 2. Instead of the concrete barrier, an approved, temporary and crashworthy device can be used.

Costs for Non-Contractual Items

5/21/19: The most recent costs for non-contractual items is now presented in EPG 237.6 Estimates.

Pile Design

5/17/19: Guidance for pile design procedure was clarified in several articles including EPG 702 Load-Bearing Piles, EPG 751.1.2.23 Types of Piling, EPG 751.3 Structural Steel Design Properties and EPG 751.36 Driven Piles.

EPG 237.14.2.9 Proposed 3D Top Surface Linear Features

5/10/19: This new guidance is for districts to be able to provide consultants with needed technical information.

EPG 236.3.5 Right of Way Expenditures and EPG 236.7.7 1099 Reporting of Acquisitions

4/30/19: Guidance has been updated to current practice.

EPG 236.16.18.1 Informal Hearing

4/24/19: The membership constituting the ODA Informal Hearing Review Committee was updated.

EPG 751.22.2.5 Deformations

4/22/19: Guidance was clarified, particularly in "calculation of camber (upward)","calculations of deflections (downward)" and "creep coefficient".

EPG 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators

4/11/19: This new Test Method is now available.

EPG 106.3.2.89 TM-89, Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)

4/10/18: This new Test Method is now available.

EPG 236.13.13 Plan Submittal and Filing

4/5/19: Guidance now permits an Asst. District Engineer to approve Right of Way plans.

Steel Girder Galvanizing Procedure

3/27/19: Guidance was added in EPG 751.50 Standard Detailing Notes for Nonweathering Steel Structures and EPG 751.14.5.8 Protective Coating Requirements to clarify steel girder galvanizing procedure.

Superpave Rice Testing Frequency

3/21/19: Guidance about the frequency for rice dry-back testing when sample results are very consistent was corrected to one every fourth sublot.

Bonds - What They Are and How They Work

3/15/19: This new tutorial is now displayed in EPG 152 Contactor Bonding Responsibilities.

EPG 910.3 Dynamic Message Signs

3/14/19: New types of DMSs are now referenced as a good portion of this article was updated.

Ephemeral Streams

3/12/19: Guidance in EPG 750.7.3.1 Embedment Requirements was updated with a minor note stating the Corps of Engineers must validate whether a stream is "ephemeral".

EPG 236.7.2.3 Prompt Offer of Just Compensation

3/6/19: Guidance was clarified to allow the minimum offer to be reduced if approved by the Asst. to State Design Engineer – Right of Way.

EPG 616.16.1 Guidelines for Providing Law Enforcement Services

3/1/19: Guidelines were clarified to provide a more standardized process.

EPG 236.16 Outdoor Advertising

3/1/19: Several ODA policies were updated to current practice, especially in EPG 236.16.22 Monthly Reports.

EPG 121.5 Asset Management

2/27/19: Guidance has been revised to coordinate with current practice.